Guided reading
The Chengxi Landfill and Incinerator is a group of waste-disposal facilities in the coastal windbreak forest belt of Chengxi Village, Annan District, Tainan, comprising the Chengxi Refuse Incinerator completed in 1999, the sanitary landfill phases in use since 1994, and a replacement furnace that began trial operation in 2026.R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, EIA Document Search System]:0780652A(焚化廠,14.5 公頃 [incinerator, 14.5 ha])、0860011V(三期,10.7 公頃 [Phase 3, 10.7 ha])、0920011V(一般事業廢棄物含灰渣,7 公頃 [general industrial waste including ash, 7 ha])、1040088V(四期環差 [Phase 4 EIA difference analysis])、1150041V(城西循環園區,14 公頃 [Chengxi Circular Economy Park, 14 ha])Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Current status
- The replacement furnace entered trial operation in 2026, and the city government expects formal operation in 2027 (ROC year 116), with the old furnace kept in service for another 8 to 10 years R027Source臺南市政府新聞 [Tainan City Government news]〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Replacement Incineration Furnace Scheduled to Begin Formal Operation Next Year; Huang Wei-che: Citywide Waste-Treatment Capacity Effectively Raised], 2026-10-28, 發稿人 [press officer] Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day, China Daily News (中華日報), 〈城西更新爐明年正式營運〉 ("Chengxi Replacement Furnace to Begin Formal Operation Next Year"), wrote 「一一二年十二月底正式開工」 ("construction formally began at the end of December [ROC] 112 [2023]"): https://www.cdns.com.tw/articles/1481476 .R028Source聯合報 [United Daily News]〈新焚化爐明年啟用!安南承擔全台南逾半垃圾去化量 遭怨不公〉[New Incinerator Opens Next Year! Annan Bears More Than Half of All Tainan's Garbage Disposal, Drawing Complaints of Unfairness], 2025-11-16, 記者 [reporter] Wu Shu-ling (吳淑玲)Original URLhttps://udn.com/news/story/7326/9142116Retrieved2026-10-30Snapshot timestamp—; the Chengxi Circular Economy Park (14 ha) voluntarily entered a second-stage EIA the same year; in June black water appeared in the tidal ditch along the Qingcaolun Seawall, and fishers and the Environmental Protection Bureau dispute its source R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, EIA Document Search System]:0780652A(焚化廠,14.5 公頃 [incinerator, 14.5 ha])、0860011V(三期,10.7 公頃 [Phase 3, 10.7 ha])、0920011V(一般事業廢棄物含灰渣,7 公頃 [general industrial waste including ash, 7 ha])、1040088V(四期環差 [Phase 4 EIA difference analysis])、1150041V(城西循環園區,14 公頃 [Chengxi Circular Economy Park, 14 ha])Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—R005Source中央社 [CNA]、工商時報 [Commercial Times]、中時 [China Times]、公視新聞 [PTS News] reports, 2025-11 to 2026-07, on the Chengxi Landfill fires and the black-water incidentOriginal URLhttps://www.youtube.com/watch?v=n9612AwZ1WIRetrieved2026-10-19Snapshot timestamp—
- Key figures
- 900 tonnes per dayIncinerator capacityR003Source維基百科中文版:城西垃圾焚化廠 [Chinese Wikipedia: Chengxi Incinerator]Original URLhttps://zh.wikipedia.org/zh-tw/%E5%9F%8E%E8%A5%BF%E5%9E%83%E5%9C%BE%E7%84%9A%E5%8C%96%E5%BB%A0Retrieved2026-10-19Snapshot timestamp(None, or not applicable)Incinerator dates: contract awarded 1993-04-29, work on site from 1995-01-11, fired up 1998-05-21, completed 1999-02-16.
- NT$82.86 million, shared among 12 villagesApproved compensation funds (fiscal 2022–2024, per year)R018Source臺南市安南區公所 [Annan District Office, Tainan City]〈111年度城西垃圾掩埋場(含焚化廠)營運回饋金 113年4月使用情形月報表〉[Monthly report on the use of fiscal 2022 (ROC year 111) operating compensation funds for the Chengxi Garbage Landfill (including the incinerator), April 2024 (ROC 113)];同格式 [same-format reports for] 112 年度(114年5月)[fiscal 2023, May 2025]、113 年度(115年2月)[fiscal 2024, February 2026] 月報表Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjI5Ni84NjM2ODgyLzJjZTIyNGFkLWFhMzgtNGJkZC1hNzUxLTk1YjMzN2JiZmM3MC5wZGY%3D&n=MTEz5bm0NOaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8oMSkucGRmRetrieved2026-10-30Snapshot timestamp(None, or not applicable)Scanned files. Fiscal 2023 (ROC 112): https://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjg0My84NzUxMTgxLzc3ZDdjOGRlLWNmYmEtNDI3NS1hZWE0LTQ1NTc2ZjNhMThhOS5wZGY%3D&n=MTE05bm0NeaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8ucGRm ; fiscal 2024 (ROC 113): https://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjg0My84ODAxNjQxLzExN2Y5OWU4LTVkOTAtNDBlNS1iNGNjLTUwZDAyYzI0NDIxNC5wZGY%3D&n=MTE15bm0MuaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8ucGRm . The approved amount for each village is the same in all three fiscal years.
- about NT$298.75 millionCompensation facilities, final costR008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Incinerator dates: construction from 1995-05-01.
- about 820,000 tonnesGarbage in temporary storage citywide (2025)R028Source聯合報 [United Daily News]〈新焚化爐明年啟用!安南承擔全台南逾半垃圾去化量 遭怨不公〉[New Incinerator Opens Next Year! Annan Bears More Than Half of All Tainan's Garbage Disposal, Drawing Complaints of Unfairness], 2025-11-16, 記者 [reporter] Wu Shu-ling (吳淑玲)Original URLhttps://udn.com/news/story/7326/9142116Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
- about 1,000 jiaFish ponds affected by black waterR004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Evidence mix
Why it matters
This plot lies in the coastal windbreak forest belt of Chengxi Village near the mouth of the Zengwen River. Around 1991 the city government first buried garbage in fish ponds along the Zengwen River, provoking mass protests by residents; from 1994 the site formally took in Tainan City's garbage, and an incinerator and an ash landfill followed R016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp—Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.R008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Incinerator dates: construction from 1995-05-01.. Each generation of works brought residents' protests and negotiations over compensation: compensation funds go every year to 12 villages of Annan District, yet the compensation facilities were censured by the Control Yuan for standing idle for long periods R018Source臺南市安南區公所 [Annan District Office, Tainan City]〈111年度城西垃圾掩埋場(含焚化廠)營運回饋金 113年4月使用情形月報表〉[Monthly report on the use of fiscal 2022 (ROC year 111) operating compensation funds for the Chengxi Garbage Landfill (including the incinerator), April 2024 (ROC 113)];同格式 [same-format reports for] 112 年度(114年5月)[fiscal 2023, May 2025]、113 年度(115年2月)[fiscal 2024, February 2026] 月報表Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjI5Ni84NjM2ODgyLzJjZTIyNGFkLWFhMzgtNGJkZC1hNzUxLTk1YjMzN2JiZmM3MC5wZGY%3D&n=MTEz5bm0NOaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8oMSkucGRmRetrieved2026-10-30Snapshot timestamp—Scanned files. Fiscal 2023 (ROC 112): https://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjg0My84NzUxMTgxLzc3ZDdjOGRlLWNmYmEtNDI3NS1hZWE0LTQ1NTc2ZjNhMThhOS5wZGY%3D&n=MTE05bm0NeaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8ucGRm ; fiscal 2024 (ROC 113): https://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjg0My84ODAxNjQxLzExN2Y5OWU4LTVkOTAtNDBlNS1iNGNjLTUwZDAyYzI0NDIxNC5wZGY%3D&n=MTE15bm0MuaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8ucGRm . The approved amount for each village is the same in all three fiscal years.R015Source監察院糾正案文 [Control Yuan corrective measure] 104財正0017(Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 提案 [proposed];審議 [deliberated] 104/11/04 (2015-11-04)、公告 [published] 104/11/12 (2015-11-12)):城西垃圾焚化廠回饋設施 [Compensation facilities of the Chengxi Incinerator]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=4585Retrieved2026-10-30Snapshot timestamp—104財調0040 is the number of the investigation report for the same case; the corrective measure is numbered 104財正0017.. In 2025 a local councilor calculated that Chengxi's new and old furnaces would bear about 64% of the city's garbage R028Source聯合報 [United Daily News]〈新焚化爐明年啟用!安南承擔全台南逾半垃圾去化量 遭怨不公〉[New Incinerator Opens Next Year! Annan Bears More Than Half of All Tainan's Garbage Disposal, Drawing Complaints of Unfairness], 2025-11-16, 記者 [reporter] Wu Shu-ling (吳淑玲)Original URLhttps://udn.com/news/story/7326/9142116Retrieved2026-10-30Snapshot timestamp—. The planned Phase 4 lay in the largest known habitat of the Taiwan dark cicada, and the 2026 black water flowed into the Annan Gangxi aquaculture area R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp—.
Main actors
Local government 4
- Environmental Protection Bureau, Tainan City GovernmentOperates the landfill and incinerator; budgets the compensation funds and facilities; runs the replacement-furnace BOTR008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Incinerator dates: construction from 1995-05-01.
- Tseng Shu-cheng (曾旭正)Then deputy mayor; announced the suspension of all of Phase 4 in 2016R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Huang Wei-che (黃偉哲)Mayor; presided over the firing-up of the replacement furnace in 2026R026Source中央社 [CNA]〈台南城西垃圾焚化廠更新爐點火 年底完工營運〉[Replacement Furnace at Tainan's Chengxi Incinerator Fired Up; Completion and Operation by Year's End], 2026-02-11, 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.cna.com.tw/news/aloc/202602110147.aspxRetrieved2026-10-30Snapshot timestamp(None, or not applicable)
- Hsu Jen-tse (許仁澤)EPB director; signed the replacement-furnace BOT contract in 2023; in the 2026 black-water dispute said he was "staking his official post on it"R005Source中央社 [CNA]、工商時報 [Commercial Times]、中時 [China Times]、公視新聞 [PTS News] reports, 2025-11 to 2026-07, on the Chengxi Landfill fires and the black-water incidentOriginal URLhttps://www.youtube.com/watch?v=n9612AwZ1WIRetrieved2026-10-19Snapshot timestamp(None, or not applicable)
Control Yuan 2
- Huang Huang-hsiung (黃煌雄)Investigated in 2011 the failure to put Chengxi's compensation funds on a legal footingR016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.
- Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財)Investigated in 2015 and censured the long idleness of the compensation facilitiesR015Source監察院糾正案文 [Control Yuan corrective measure] 104財正0017(Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 提案 [proposed];審議 [deliberated] 104/11/04 (2015-11-04)、公告 [published] 104/11/12 (2015-11-12)):城西垃圾焚化廠回饋設施 [Compensation facilities of the Chengxi Incinerator]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=4585Retrieved2026-10-30Snapshot timestamp(None, or not applicable)104財調0040 is the number of the investigation report for the same case; the corrective measure is numbered 104財正0017.
Private companies 1
- Chengxi Energy Co., Ltd. (城西能源股份有限公司)Replacement-furnace BOT; chairman Chou Li-ming (周黎明); investment of about NT$7.2 billionR024Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp(None, or not applicable)CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx .
Local residents 2
- Residents around ChengxiMass protests blocking garbage trucks around 1991; "repeated protests and blockades" when incinerator construction began in 1995R016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.
- Yen Wen-cheng (嚴文正)Chengxi Village chief; in 2012 took residents to inspect the derelict compensation facilitiesR021Source公視新聞 [PTS News]〈廠商放任荒廢 親水樂園變垃圾場〉[Operator Lets It Go to Ruin; Water Park Becomes a Garbage Dump], published 2012-08-06;華視新聞 [CTS News] video on the same topic, uploaded 2012-07-25Original URLhttps://news.pts.org.tw/article/217361Retrieved2026-10-30Snapshot timestamp(None, or not applicable)CTS video: https://www.youtube.com/watch?v=xUhmk3PMm_k .
Fishers 1
- Kuo Kun-shan (郭坤山)Chairperson of the Fucheng Aquaculture Development AssociationR004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
Scholars 2
- Chang Yuan-mou (張原謀), Huang Wen-po (黃文伯)National University of Tainan; opposed Phase 4 in 2016R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Huang Ta-chun (黃大駿)Chia Nan University of Pharmacy and Science; third-party testing of the black waterR004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
Environmental and community groups 1
- Wu Mao-cheng (吳茂成)Taijiang branch of Tainan Community UniversityR004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
Elected representatives 4
- Lee Tui-chih (李退之)Councilor; 2016 motion for early planning of citywide waste treatmentR010Source臺南市議會 [Tainan City Council] 第 2 屆第 4 次定期會 [2nd Council, 4th regular session], motion by Councilor Lee Tui-chih (李退之)〈建請臺南市政府提早規劃全市垃圾處理方案,避免109年垃圾氾濫危機,以安民心〉[Requesting the Tainan City Government to plan a citywide waste-treatment program early, to avert a garbage-overflow crisis in 2020 (ROC year 109) and reassure the public] and the city government's report on action taken, resolved 2016-12-23Original URLhttps://www.tncc.gov.tw/motions/page.asp?mainid=0ACBFF06-0D0B-49D8-BD9A-AB2C3F96F822Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
- Kuo Ching-hua (郭清華)Councilor; from 2020 repeatedly questioned the replacement furnace and demanded that the old furnace be decommissioned within 8 years and turned into a parkR028Source聯合報 [United Daily News]〈新焚化爐明年啟用!安南承擔全台南逾半垃圾去化量 遭怨不公〉[New Incinerator Opens Next Year! Annan Bears More Than Half of All Tainan's Garbage Disposal, Drawing Complaints of Unfairness], 2025-11-16, 記者 [reporter] Wu Shu-ling (吳淑玲)Original URLhttps://udn.com/news/story/7326/9142116Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
- Kuo Hsin-liang (郭信良)Then deputy council speaker; inspected the derelict compensation facilities in 2012R021Source公視新聞 [PTS News]〈廠商放任荒廢 親水樂園變垃圾場〉[Operator Lets It Go to Ruin; Water Park Becomes a Garbage Dump], published 2012-08-06;華視新聞 [CTS News] video on the same topic, uploaded 2012-07-25Original URLhttps://news.pts.org.tw/article/217361Retrieved2026-10-30Snapshot timestamp(None, or not applicable)CTS video: https://www.youtube.com/watch?v=xUhmk3PMm_k .
- Chiang Ming-tsung (江明宗)Taiwan People's Party; black-water incidentR004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
Points of contention
These are the questions people have argued over. Each side's account is set out as stated; this site does not rule on them.
1With nowhere for the garbage to go, should landfill Phase 4 be built in the windbreak forest belt?2
- City Council and city government (2016)
The council passed a motion urging early planning to avoid a garbage overflow crisis in 2020; the city replied that Phase 4 was "suspended because of public protests" (another version: "pending clarification of the law")R010Source臺南市議會 [Tainan City Council] 第 2 屆第 4 次定期會 [2nd Council, 4th regular session], motion by Councilor Lee Tui-chih (李退之)〈建請臺南市政府提早規劃全市垃圾處理方案,避免109年垃圾氾濫危機,以安民心〉[Requesting the Tainan City Government to plan a citywide waste-treatment program early, to avert a garbage-overflow crisis in 2020 (ROC year 109) and reassure the public] and the city government's report on action taken, resolved 2016-12-23Original URLhttps://www.tncc.gov.tw/motions/page.asp?mainid=0ACBFF06-0D0B-49D8-BD9A-AB2C3F96F822Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
- Scholars including Chang Yuan-mou and Huang Wen-po (黃文伯)
Opposed Phase 4, arguing for a whole-ecosystem view of the windbreak belt; Deputy Mayor Tseng Shu-cheng announced the suspension of the whole projectR004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- City Council and city government (2016)
2Once the replacement furnace is running, should the old furnace be retired on schedule?2
- Councilor Kuo Ching-hua
The new and old furnaces bear about 64% of the city's garbage, an unfair long-term burden on Annan residents; once the new furnace is running, the old one should be decommissioned within 8 years and the site rebuilt as a parkR028Source聯合報 [United Daily News]〈新焚化爐明年啟用!安南承擔全台南逾半垃圾去化量 遭怨不公〉[New Incinerator Opens Next Year! Annan Bears More Than Half of All Tainan's Garbage Disposal, Drawing Complaints of Unfairness], 2025-11-16, 記者 [reporter] Wu Shu-ling (吳淑玲)Original URLhttps://udn.com/news/story/7326/9142116Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
- Tainan City Environmental Protection Bureau
Keeping the old furnace in service for another 8 to 10 years better ensures that the stored garbage can be cleared and that citywide incineration capacity stays stableR028Source聯合報 [United Daily News]〈新焚化爐明年啟用!安南承擔全台南逾半垃圾去化量 遭怨不公〉[New Incinerator Opens Next Year! Annan Bears More Than Half of All Tainan's Garbage Disposal, Drawing Complaints of Unfairness], 2025-11-16, 記者 [reporter] Wu Shu-ling (吳淑玲)Original URLhttps://udn.com/news/story/7326/9142116Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
- Councilor Kuo Ching-hua
3Did the 2026 black water in the tidal ditch seep out of the landfill?3
- Testing by SGS commissioned by fishers
COD 212, BOD 64.1, ammonia nitrogen 26.0 mg/LR005Source中央社 [CNA]、工商時報 [Commercial Times]、中時 [China Times]、公視新聞 [PTS News] reports, 2025-11 to 2026-07, on the Chengxi Landfill fires and the black-water incidentOriginal URLhttps://www.youtube.com/watch?v=n9612AwZ1WIRetrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Third-party testing
Chia Nan University of Pharmacy and Science judged it "suspected leachate"; another laboratory "found nothing"R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- EPB director Hsu Jen-tse
Answered accusations of illicit discharge by saying he was "staking his official post on it"R005Source中央社 [CNA]、工商時報 [Commercial Times]、中時 [China Times]、公視新聞 [PTS News] reports, 2025-11 to 2026-07, on the Chengxi Landfill fires and the black-water incidentOriginal URLhttps://www.youtube.com/watch?v=n9612AwZ1WIRetrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Testing by SGS commissioned by fishers
4Has the compensation for residents actually been spent on residents?3
- Tainan City Environmental Protection Bureau
Budgeted compensation facilities from fiscal 1995, built a water park and an indoor heated pool, contracted out their operation, and let residents of 11 villages including Chengdong use them free in the off-seasonR008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Incinerator dates: construction from 1995-05-01.
- Control Yuan (2011)
Compensation funds of NT$82.62 million a year, or more than NT$600 per tonne, exceeded the standard of NT$200 per tonne and had long not been put on a legal footingR016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.
- Control Yuan (2015)
Censured the EPB for "disregarding the long idleness of the compensation facilities"R015Source監察院糾正案文 [Control Yuan corrective measure] 104財正0017(Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 提案 [proposed];審議 [deliberated] 104/11/04 (2015-11-04)、公告 [published] 104/11/12 (2015-11-12)):城西垃圾焚化廠回饋設施 [Compensation facilities of the Chengxi Incinerator]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=4585Retrieved2026-10-30Snapshot timestamp(None, or not applicable)104財調0040 is the number of the investigation report for the same case; the corrective measure is numbered 104財正0017.
- Tainan City Environmental Protection Bureau
Turning points
- 1989EIA for the Chengxi Village incinerator approved with conditionsR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, EIA Document Search System]:0780652A(焚化廠,14.5 公頃 [incinerator, 14.5 ha])、0860011V(三期,10.7 公頃 [Phase 3, 10.7 ha])、0920011V(一般事業廢棄物含灰渣,7 公頃 [general industrial waste including ash, 7 ha])、1040088V(四期環差 [Phase 4 EIA difference analysis])、1150041V(城西循環園區,14 公頃 [Chengxi Circular Economy Park, 14 ha])Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- 1991Garbage buried in fish ponds along the Zengwen River; mass protests by residentsR016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.
- 1994Nanshalun landfill saturated; garbage burial shifts to ChengxiR008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Incinerator dates: construction from 1995-05-01.
- 1999Incinerator completed, 900 tonnes per dayR003Source維基百科中文版:城西垃圾焚化廠 [Chinese Wikipedia: Chengxi Incinerator]Original URLhttps://zh.wikipedia.org/zh-tw/%E5%9F%8E%E8%A5%BF%E5%9E%83%E5%9C%BE%E7%84%9A%E5%8C%96%E5%BB%A0Retrieved2026-10-19Snapshot timestamp(None, or not applicable)Incinerator dates: contract awarded 1993-04-29, work on site from 1995-01-11, fired up 1998-05-21, completed 1999-02-16.
- 2015Control Yuan censures the long idleness of the compensation facilitiesR015Source監察院糾正案文 [Control Yuan corrective measure] 104財正0017(Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 提案 [proposed];審議 [deliberated] 104/11/04 (2015-11-04)、公告 [published] 104/11/12 (2015-11-12)):城西垃圾焚化廠回饋設施 [Compensation facilities of the Chengxi Incinerator]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=4585Retrieved2026-10-30Snapshot timestamp(None, or not applicable)104財調0040 is the number of the investigation report for the same case; the corrective measure is numbered 104財正0017.
- 2016Phase 4 controversy; deputy mayor suspends the whole projectR004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- 2020Shuiduoduo Water Park, a compensation facility, closesR022Source自由時報 [Liberty Times]〈台南「水多多」宣布停業 環局:朝共融式公園設計規劃〉[Tainan's Shuiduoduo Announces Closure; EPB: Planning Toward an Inclusive Park], 2020-06-04, and〈台南》「水多多」停業 環局:轉型共融式公園〉[Tainan: Shuiduoduo Closes; EPB: To Be Transformed into an Inclusive Park], 2020-06-05, 記者 [reporter] Wang Shu-hsiu (王姝琇)Original URLhttps://news.ltn.com.tw/news/life/breakingnews/3187066Retrieved2026-10-30Snapshot timestamp(None, or not applicable)See also https://news.ltn.com.tw/news/life/paper/1377562 . The report quotes the Shuiduoduo Water Park's Facebook announcement: 「城西回饋設施自91年興建完成迄今已屆18年」 ("it has been 18 years since the Chengxi compensation facilities were completed in [ROC year] 91 [2002]").
- 2023Replacement-furnace BOT contract signed; groundbreaking and start of constructionR024Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp(None, or not applicable)CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx .
- 2026Replacement furnace in trial operation; Chengxi Circular Economy Park enters second-stage EIA; tidal-ditch black-water incidentR027Source臺南市政府新聞 [Tainan City Government news]〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Replacement Incineration Furnace Scheduled to Begin Formal Operation Next Year; Huang Wei-che: Citywide Waste-Treatment Capacity Effectively Raised], 2026-10-28, 發稿人 [press officer] Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp(None, or not applicable)The same day, China Daily News (中華日報), 〈城西更新爐明年正式營運〉 ("Chengxi Replacement Furnace to Begin Formal Operation Next Year"), wrote 「一一二年十二月底正式開工」 ("construction formally began at the end of December [ROC] 112 [2023]"): https://www.cdns.com.tw/articles/1481476 .
Where to start reading
- Reports 6.1The Chengxi Landfill and IncineratorFive generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
- EntryChengxi Windbreak ForestThe Chengxi Windbreak Forest is a coastal windbreak forest between the Luermen and Zengwen river mouths in Chengxi Village, Annan District, about 4.5 km long, the largest in Tainan City and the largest habitat of the Hoppo cicada.
- EntryQingcaolun SeawallThe Qingcaolun Seawall is the sea embankment at Qingcaolun, Annan District, Tainan, on the south side of the Zengwen River mouth, completed in 1985 and about 2 km long; behind it is land-crab habitat, and outside it is the southern limit of the Formosan fiddler crab.
- EntryTaiwan twilight cicada (Taiwanosemia hoppoensis)The Taiwan twilight cicada (*Taiwanosemia hoppoensis*; valid TaiCOL Chinese name 北埔蟬, the Beipu cicada) is a cicada endemic to Taiwan and the only species in its genus; its largest population lives in the Chengxi Windbreak Forest area of Taijiang National Park.
Full recordBelow is the item-by-item record; every item cites its source.
The Chengxi Landfill and Incinerator is a group of waste-disposal facilities of Tainan City in the coastal windbreak forest belt of Chengxi Village, Annan District, near the mouth of the Zengwen River, comprising the Chengxi Refuse Incinerator, the successive phases of the sanitary landfill, and an ash landfill. The incinerator EIA was conditionally approved in 1989, and from July 1994 Tainan City's garbage was buried at Chengxi because the Nanshalun landfill was full; the incinerator, with a capacity of 900 tonnes a day, was completed in 1999. Phase 4 of the landfill was put on hold in 2016; a replacement furnace on the site of the old plant began trial operation in 2026, and the city government expects it to begin formal operation in 2027.
Relationship map
People involved88
History
Main article: History of the Chengxi Landfill and Incinerator
- Around 1991 the Tainan City Government buried garbage in fish ponds along the Zengwen River in the Chengxi area; residents protested collectively, and afterwards the city negotiated with the locality through compensation funds and compensation facilities R016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp—Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.. Official record
- Accounts of the incinerator's start and completion dates differ: construction began around 1994–1995, the plant was fired up in 1998, and it was completed in 1999 R003Source維基百科中文版:城西垃圾焚化廠 [Chinese Wikipedia: Chengxi Incinerator]Original URLhttps://zh.wikipedia.org/zh-tw/%E5%9F%8E%E8%A5%BF%E5%9E%83%E5%9C%BE%E7%84%9A%E5%8C%96%E5%BB%A0Retrieved2026-10-19Snapshot timestamp—Incinerator dates: contract awarded 1993-04-29, work on site from 1995-01-11, fired up 1998-05-21, completed 1999-02-16.R008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Incinerator dates: construction from 1995-05-01.R031Source土城國小 [Tucheng Elementary School] old website, local-studies subsite pages〈菅仔埔的春天〉[Spring at Guanzaipu] and〈城西焚化爐〉[The Chengxi Incinerator](2002-03-20 snapshot)(Wayback Machine snapshot; the original site has closed)Original URLhttps://web.archive.org/web/20020320204505/http://www.tcps.tn.edu.tw:80/teach/country/factory_burngarbage.htmRetrieved2026-10-30Snapshot timestamp—A local school web page from 2002, with no source cited; 「85 年 8 月完工啟用」 ("completed and put into service in August [ROC] 85 [1996]") may have been a scheduled date. Unverified. Incinerator dates: construction began 1994-01-04, completed and put into use in August 1996..
- In 2016 the Phase 4 landfill was put on hold because it lay in the Chengxi Windbreak Forest belt, a habitat of the Taiwan twilight cicada R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp—; the city then turned to reactivating the Phase 3 landfill R006Source環境資訊中心 [Taiwan Environmental Information Center] reports on Chengxi, the landfill and the incineratorOriginal URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—R010Source臺南市議會 [Tainan City Council] 第 2 屆第 4 次定期會 [2nd Council, 4th regular session], motion by Councilor Lee Tui-chih (李退之)〈建請臺南市政府提早規劃全市垃圾處理方案,避免109年垃圾氾濫危機,以安民心〉[Requesting the Tainan City Government to plan a citywide waste-treatment program early, to avert a garbage-overflow crisis in 2020 (ROC year 109) and reassure the public] and the city government's report on action taken, resolved 2016-12-23Original URLhttps://www.tncc.gov.tw/motions/page.asp?mainid=0ACBFF06-0D0B-49D8-BD9A-AB2C3F96F822Retrieved2026-10-30Snapshot timestamp—.
- In 2023 a BOT contract was signed for a replacement furnace, with an investment of more than NT$7.2 billion R024Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp—CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx .; it was fired up in February 2026 and began trial operation with waste feed in May R026Source中央社 [CNA]〈台南城西垃圾焚化廠更新爐點火 年底完工營運〉[Replacement Furnace at Tainan's Chengxi Incinerator Fired Up; Completion and Operation by Year's End], 2026-02-11, 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.cna.com.tw/news/aloc/202602110147.aspxRetrieved2026-10-30Snapshot timestamp—R027Source臺南市政府新聞 [Tainan City Government news]〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Replacement Incineration Furnace Scheduled to Begin Formal Operation Next Year; Huang Wei-che: Citywide Waste-Treatment Capacity Effectively Raised], 2026-10-28, 發稿人 [press officer] Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day, China Daily News (中華日報), 〈城西更新爐明年正式營運〉 ("Chengxi Replacement Furnace to Begin Formal Operation Next Year"), wrote 「一一二年十二月底正式開工」 ("construction formally began at the end of December [ROC] 112 [2023]"): https://www.cdns.com.tw/articles/1481476 .. In the same year the Tainan City Environmental Protection Bureau voluntarily undertook a second-stage EIA for the Chengxi Circular Economy Park (城西循環園區) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, EIA Document Search System]:0780652A(焚化廠,14.5 公頃 [incinerator, 14.5 ha])、0860011V(三期,10.7 公頃 [Phase 3, 10.7 ha])、0920011V(一般事業廢棄物含灰渣,7 公頃 [general industrial waste including ash, 7 ha])、1040088V(四期環差 [Phase 4 EIA difference analysis])、1150041V(城西循環園區,14 公頃 [Chengxi Circular Economy Park, 14 ha])Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.
- The landfill caught fire several times in 2025–2026 R005Source中央社 [CNA]、工商時報 [Commercial Times]、中時 [China Times]、公視新聞 [PTS News] reports, 2025-11 to 2026-07, on the Chengxi Landfill fires and the black-water incidentOriginal URLhttps://www.youtube.com/watch?v=n9612AwZ1WIRetrieved2026-10-19Snapshot timestamp—R040Source鏡週刊 [Mirror Media] (2026-02-10): fire at Phase 3 of the Chengxi LandfillOriginal URLhttps://www.mirrormedia.mg/story/20260210edi077Retrieved2026-11-06Snapshot timestamp—News report.; in June 2026 black water appeared in the tidal ditch of the Qingcaolun Seawall, affecting nearby fish ponds R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp—.
Facilities
- Areas of each landfill phase as listed by the Environmental Protection Bureau R009Source臺南市政府環境保護局 [Environmental Protection Bureau, Tainan City Government],〈城西垃圾衛生掩埋場〉[Chengxi Sanitary Landfill] introduction pageOriginal URLhttps://www.tnepb.gov.tw/mode02.aspx?boss=20251205104502728Retrieved2026-10-30Snapshot timestamp—: Official record
- Phase 0, 6.1 hectares: closed and capped with soil; a slow-pitch softball field and a recreational park have been built on it.
- Phase 1, 11.3 hectares: closed, capped and planted.
- Phase 2, 14.2 hectares: temporary storage of baled and reallocated garbage.
- Phase 3, 10.7 hectares: reactivation completed, 265,000 cubic meters.
- Ash landfill, 9.0 hectares: 3 hectares of it used to build a temporary fly-ash storage warehouse.
Compensation funds and compensation facilities
First items: Compensation fundsCompensation facilities: Dream Water City, Shuidingdang, ShuiduoduoMoreLess
Compensation funds
- Origins: after the protests over garbage buried in fish ponds around 1991, the city government negotiated compensation terms with residents; compensation funds have been budgeted year by year since fiscal [ROC] 83 (1994) and disbursed to the villages through the Annan District Office R016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp—Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.. Official record
- At the time of the Control Yuan's 2011 investigation, NT$82.62 million a year went to 「衛生掩埋場及垃圾車行經路線之12個行政里」 ("the 12 administrative villages around the sanitary landfill and along garbage-truck routes"); the villages demanded a fixed amount and 「不採用比照其他縣市依進場焚化量計(每公噸回饋200元)」 ("did not adopt calculation by the quantity incinerated, as in other counties and cities (NT$200 per tonne)") R016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp—Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.. Official record
- The compensation-fund regulations in force since 2012 R017Source《臺南市垃圾焚化廠及掩埋場營運階段提供回饋金辦法》[Tainan City Regulations on Compensation Funds During the Operation of Refuse Incinerators and Landfills](臺南市政府 [Tainan City Government] 101-01-02 (2012-01-02) 府法規字第 1001017959A 號令發布 [promulgated by Order Fu-Fa-Gui No. 1001017959A]、114-02-19 (2025-02-19) 府法規字第 1140283346A 號令修正 [amended by Order Fu-Fa-Gui No. 1140283346A])Original URLhttps://www.tnepb.gov.tw/upload/%E8%87%BA%E5%8D%97%E5%B8%82%E5%9E%83%E5%9C%BE%E7%84%9A%E5%8C%96%E5%BB%A0%E5%8F%8A%E6%8E%A9%E5%9F%8B%E5%A0%B4%E7%87%9F%E9%81%8B%E9%9A%8E%E6%AE%B5%E6%8F%90%E4%BE%9B%E5%9B%9E%E9%A5%8B%E9%87%91%E8%BE%A6%E6%B3%95.pdfRetrieved2026-10-30Snapshot timestamp—: Official record
- Total amount: NT$200 budgeted for each tonne of garbage treated by an incinerator; NT$250 for each square meter of landfill land.
- The district office of the area concerned submits an annual plan of use, and the funds are handled on a collect-and-pay-on-behalf basis.
- Article 8: while the Chengxi Incinerator is operating, NT$30 million a year within the total is budgeted for student lunches, school-fee subsidies, scholarships and grants, and help for students from disadvantaged families; the compensated villages are the 12 villages of Annan District: Chengdong, Chengxi, Chengnan, Chengbei, Chengzhong, Qingcao, Shalun, Xuedong, Sicao, Mazugong, Yantian and Luer.
- In the Annan District Office's monthly reports on the 「城西垃圾掩埋場(含焚化廠)營運回饋金」 ("operating compensation funds for the Chengxi Garbage Landfill (including the incinerator)"), the amounts approved for each village are the same in fiscal 2022, 2023 and 2024 (ROC 111–113), totaling NT$82.86 million a year R018Source臺南市安南區公所 [Annan District Office, Tainan City]〈111年度城西垃圾掩埋場(含焚化廠)營運回饋金 113年4月使用情形月報表〉[Monthly report on the use of fiscal 2022 (ROC year 111) operating compensation funds for the Chengxi Garbage Landfill (including the incinerator), April 2024 (ROC 113)];同格式 [same-format reports for] 112 年度(114年5月)[fiscal 2023, May 2025]、113 年度(115年2月)[fiscal 2024, February 2026] 月報表Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjI5Ni84NjM2ODgyLzJjZTIyNGFkLWFhMzgtNGJkZC1hNzUxLTk1YjMzN2JiZmM3MC5wZGY%3D&n=MTEz5bm0NOaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8oMSkucGRmRetrieved2026-10-30Snapshot timestamp—Scanned files. Fiscal 2023 (ROC 112): https://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjg0My84NzUxMTgxLzc3ZDdjOGRlLWNmYmEtNDI3NS1hZWE0LTQ1NTc2ZjNhMThhOS5wZGY%3D&n=MTE05bm0NeaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8ucGRm ; fiscal 2024 (ROC 113): https://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjg0My84ODAxNjQxLzExN2Y5OWU4LTVkOTAtNDBlNS1iNGNjLTUwZDAyYzI0NDIxNC5wZGY%3D&n=MTE15bm0MuaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8ucGRm . The approved amount for each village is the same in all three fiscal years.: Official record
- Chengxi Village NT$20.36 million
- Qingcao Village NT$9 million
- Chengbei, Chengdong and Chengzhong villages NT$5.5 million each
- Chengnan Village NT$11 million (Chengnan Community and Denglu Community NT$5.5 million each)
- Shalun Village NT$9 million (Shifenwen Community NT$5 million, Shalun Community NT$4 million)
- Xuedong Village NT$5 million
- Sicao, Mazugong, Luer and Yantian villages NT$3 million each
Compensation facilities: Dream Water City, Shuidingdang, Shuiduoduo
- The design firm's own description: 「夢幻水城」 ("Dream Water City") used heat from the incinerator to supply the energy for its heated swimming pool, in a tropical-rainforest style with natural light from the roof R023Source曾國立建築師事務所 [Tseng Kuo-li Architects]〈夢幻水城水樂園〉[Dream Water City Water Park] project pageOriginal URLhttps://www.tkl-arch.com/tw/index/136Retrieved2026-10-30Snapshot timestamp—The design firm's own description; no year given.. Secondhand account
- Changes of name and operator: Official recordSecondhand account
- Dream Water City: managed by a contractor under the Government Procurement Act from 2005-05 to 2007-09 R008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Incinerator dates: construction from 1995-05-01..
- Tainan Shuidingdang: operated by Far East Iron Cabinet and Steel Works from 2007-10, opening under the new name on 2008-05-04 R008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Incinerator dates: construction from 1995-05-01.R020Source自由時報 [Liberty Times]〈【流行消費】台南水叮噹 開幕〉[Trends & Consumption: Tainan Shuidingdang Opens], 2008-05-05, 記者 [reporter] Tsai Wen-chu (蔡文居)Original URLhttps://ent.ltn.com.tw/news/paper/208965Retrieved2026-10-30Snapshot timestamp—.
- Shuiduoduo Water Park, Chengxi branch: Wikipedia records it as operated by Pingshi Marketing Co., Ltd. (平實行銷股份有限公司) R003Source維基百科中文版:城西垃圾焚化廠 [Chinese Wikipedia: Chengxi Incinerator]Original URLhttps://zh.wikipedia.org/zh-tw/%E5%9F%8E%E8%A5%BF%E5%9E%83%E5%9C%BE%E7%84%9A%E5%8C%96%E5%BB%A0Retrieved2026-10-19Snapshot timestamp—Incinerator dates: contract awarded 1993-04-29, work on site from 1995-01-11, fired up 1998-05-21, completed 1999-02-16.; closed 2020-06 R022Source自由時報 [Liberty Times]〈台南「水多多」宣布停業 環局:朝共融式公園設計規劃〉[Tainan's Shuiduoduo Announces Closure; EPB: Planning Toward an Inclusive Park], 2020-06-04, and〈台南》「水多多」停業 環局:轉型共融式公園〉[Tainan: Shuiduoduo Closes; EPB: To Be Transformed into an Inclusive Park], 2020-06-05, 記者 [reporter] Wang Shu-hsiu (王姝琇)Original URLhttps://news.ltn.com.tw/news/life/breakingnews/3187066Retrieved2026-10-30Snapshot timestamp—See also https://news.ltn.com.tw/news/life/paper/1377562 . The report quotes the Shuiduoduo Water Park's Facebook announcement: 「城西回饋設施自91年興建完成迄今已屆18年」 ("it has been 18 years since the Chengxi compensation facilities were completed in [ROC year] 91 [2002]")..
- Two Control Yuan tracks: 100 Cai-Diao 0015 dealt with putting the compensation funds on a legal footing (no corrective measure); 104 Cai-Diao 0040 and 104 Cai-Zheng 0017 dealt with the idle compensation facilities, closed and filed on 2017-12-06 R016Source監察院調查報告 [Control Yuan investigation report] 100財調0015(Huang Huang-hsiung (黃煌雄) 調查 [investigating], 100/02/15 (2011-02-15)):審計部函報臺南市環境保護局處理垃圾回饋金,迄未完成立法程序及財務控管機制未落實執行 [The National Audit Office reported that the Tainan City Environmental Protection Bureau's handling of garbage compensation funds had still not completed the legislative process and that financial control mechanisms were not implemented]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp—Case page: https://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=1089 ; PDF, 7 pages. No corrective measure was issued.R015Source監察院糾正案文 [Control Yuan corrective measure] 104財正0017(Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 提案 [proposed];審議 [deliberated] 104/11/04 (2015-11-04)、公告 [published] 104/11/12 (2015-11-12)):城西垃圾焚化廠回饋設施 [Compensation facilities of the Chengxi Incinerator]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=4585Retrieved2026-10-30Snapshot timestamp—104財調0040 is the number of the investigation report for the same case; the corrective measure is numbered 104財正0017.R036Source監察院 [Control Yuan]〈糾正案件結案情形一覽表 106 年 12 月〉[List of Closed Corrective-Measure Cases, December 2017 (ROC 106)](財政及經濟委員會 [Committee on Finance and Economic Affairs] 106.12.06 (2017-12-06) 第 5 屆第 45 次會議 [45th meeting of the 5th term])Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/additional/download/3907Retrieved2026-10-30Snapshot timestamp—. Official record
- The replacement-furnace BOT includes the former Shuiduoduo site, planned as an inclusive park and a site for environmental education and local revitalization R024Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp—CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx .. Official record
Environmental and social impact
First items: Blood tests around the incinerator led to the Anshun Plant contaminationMoreLess
- Phase 4 was planned within the Chengxi Windbreak Forest (城西防風林) belt, the largest known habitat of the Hoppo cicada (Taiwanosemia hoppoensis, 台灣暗蟬) R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp—. Secondhand account
- The black water appeared in the tidal ditch along the Qingcaolun Seawall, affecting the Annan Gangxi aquaculture area R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp—. Secondhand account
- Free use of the compensation facilities extended to 11 villages, including Chengdong Village; the compensation funds, by contrast, are shared among 12 villages of Annan District, with Chengxi Village receiving the most, NT$20.36 million a year R002Source監察院調查報告 [Control Yuan investigation report] 104財調0040(Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) investigating;2015-11-04 審議 [deliberated]、2021-05-18 公告 [published], with a separate corrective measure):城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=4584Retrieved2026-10-19Snapshot timestamp—R018Source臺南市安南區公所 [Annan District Office, Tainan City]〈111年度城西垃圾掩埋場(含焚化廠)營運回饋金 113年4月使用情形月報表〉[Monthly report on the use of fiscal 2022 (ROC year 111) operating compensation funds for the Chengxi Garbage Landfill (including the incinerator), April 2024 (ROC 113)];同格式 [same-format reports for] 112 年度(114年5月)[fiscal 2023, May 2025]、113 年度(115年2月)[fiscal 2024, February 2026] 月報表Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjI5Ni84NjM2ODgyLzJjZTIyNGFkLWFhMzgtNGJkZC1hNzUxLTk1YjMzN2JiZmM3MC5wZGY%3D&n=MTEz5bm0NOaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8oMSkucGRmRetrieved2026-10-30Snapshot timestamp—Scanned files. Fiscal 2023 (ROC 112): https://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjg0My84NzUxMTgxLzc3ZDdjOGRlLWNmYmEtNDI3NS1hZWE0LTQ1NTc2ZjNhMThhOS5wZGY%3D&n=MTE05bm0NeaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8ucGRm ; fiscal 2024 (ROC 113): https://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMzQvcmVsZmlsZS8yNjg0My84ODAxNjQxLzExN2Y5OWU4LTVkOTAtNDBlNS1iNGNjLTUwZDAyYzI0NDIxNC5wZGY%3D&n=MTE15bm0MuaciOS9v%2BeUqOaDheW9ouaciOWgseihqC3ln47opb8ucGRm . The approved amount for each village is the same in all three fiscal years.. Official record
- In 2019 Councilor Chen Kun-ho recalled in the council that in 2001 he had opposed Tainan County (臺南縣) building another incinerator and demanded that the Chengxi Incinerator take Qigu's (七股) garbage R011Source臺南市議會 [Tainan City Council] 第 3 屆第 2 次定期會第 7 次會議紀錄 [Minutes of the 7th meeting, 2nd regular session, 3rd Council](建設、經發、農業業務質詢 [interpellations on construction, economic development and agriculture]),2019-10-17Original URLhttps://www.tncc.gov.tw/2019/warehouse/K20000/1017-%E5%BB%BA%E8%A8%AD-%E7%B6%93%E7%99%BC,%E8%BE%B2%E6%A5%AD%E6%A5%AD%E5%8B%99%E8%B3%AA%E8%A9%A2.pdfRetrieved2026-10-30Snapshot timestamp—. Official record
- In a 2022 letter the city government stated that the Yongkang and Chengxi incinerators were both at full capacity and that garbage was being moved into landfills for temporary storage R013Source臺南市政府函 [Tainan City Government letter],府環廢字第1110590044號 [Fu-Huan-Fei No. 1110590044](函送市議會,動用第二預備金辦理垃圾篩分 [sent to the City Council: use of the second reserve fund for garbage screening]),2022-05-26Original URLhttps://bill.tncc.gov.tw/NoPaperMeeting_TNCC/Upload/Proposal_2/7130c9b8-73a2-4a4e-b801-4604c603c2fe.pdfRetrieved2026-10-30Snapshot timestamp—. Official record
- In 2025 Councilor Kuo Ching-hua said that Chengxi's new and old furnaces would bear about 64% of the city's garbage, and that 「由安南區民長期承擔環境負荷並不公平」 ("it is unfair for Annan residents to bear the environmental burden over the long term") (as paraphrased by the reporter) R028Source聯合報 [United Daily News]〈新焚化爐明年啟用!安南承擔全台南逾半垃圾去化量 遭怨不公〉[New Incinerator Opens Next Year! Annan Bears More Than Half of All Tainan's Garbage Disposal, Drawing Complaints of Unfairness], 2025-11-16, 記者 [reporter] Wu Shu-ling (吳淑玲)Original URLhttps://udn.com/news/story/7326/9142116Retrieved2026-10-30Snapshot timestamp—. Secondhand account
Blood tests around the incinerator led to the Anshun Plant contamination
- Postscript of Chang Jung-wei's (張榮偉) 2009 doctoral dissertation (the author's own account) R041SourceChang Jung-wei (張榮偉),《某廢棄鹼氯及五氯酚工廠附近居民甲基汞及戴奧辛共同暴露評估暨慢性健康影響研究》[The chronic health effects for residents with concurrent exposure to dioxin and methylmercury living near an deserted PCP and chloralkali factory in Tainan],國立成功大學環境醫學研究所 [Institute of Environmental Medicine, National Cheng Kung University] 博士論文 [doctoral dissertation],2009,印頁 [printed pages] 1、73、125Original URL—Retrieved—Snapshot timestamp—SourceFrom 《The chronic health effects for residents with concurrent exposure to dioxin and methylmercury living near an deserted PCP and chloralkali factory in Tainan (某廢棄鹼氯及五氯酚工廠附近居民甲基汞及戴奧辛共同暴露評估暨慢性健康影響研究)》p. 1、73、125: Scholarly view
- From 1999 the Environmental Protection Administration commissioned NCKU to test blood dioxin in residents around Taiwan's 19 incinerators year by year; by 2002, 12 plants and more than 1,100 samples had been done, and residents near the Chengxi Incinerator averaged 23.3 (5.1–154.2) pg-I-TEQ/g-lipid, clearly higher than at the other 11 plants (14.1–19.7).
- Broken down by village, Xiangong and Luer were more than twice the other villages; the author judged that the Chengxi Incinerator, which had operated for little more than a year and whose stack tests all met the standards, could not have caused this, and that the likely source was the Taiwan Alkali Anshun Plant on the boundary of the two villages.
- The dissertation's resident questionnaire: 29.2% said there was an incinerator near their home, meaning the Chengxi incinerator about 5 km away; the dissertation considers the contribution of the airborne route to be negligible R041SourceChang Jung-wei (張榮偉),《某廢棄鹼氯及五氯酚工廠附近居民甲基汞及戴奧辛共同暴露評估暨慢性健康影響研究》[The chronic health effects for residents with concurrent exposure to dioxin and methylmercury living near an deserted PCP and chloralkali factory in Tainan],國立成功大學環境醫學研究所 [Institute of Environmental Medicine, National Cheng Kung University] 博士論文 [doctoral dissertation],2009,印頁 [printed pages] 1、73、125Original URL—Retrieved—Snapshot timestamp—SourceFrom 《The chronic health effects for residents with concurrent exposure to dioxin and methylmercury living near an deserted PCP and chloralkali factory in Tainan (某廢棄鹼氯及五氯酚工廠附近居民甲基汞及戴奧辛共同暴露評估暨慢性健康影響研究)》p. 1、73、125. Scholarly view
- See Taiwan Alkali Anshun Plant and Dioxin.
Controversies
The documents differ on the start and completion dates of the incinerator, the completion year of the compensation facilities, and the start and operating years of the replacement furnace; on the source of the 2026 black water at the Qingcaolun Seawall, fishers, scholars, and the Environmental Protection Bureau give differing accounts R004Source公視《我們的島》[Our Island]〈掩埋台江〉[Burying Taijiang](2016-04-04)、〈海岸上的生態樂園|台南城西防風林〉[An Ecological Paradise on the Coast: the Chengxi Windbreak Forest, Tainan](2017-09-04)、〈黑水哪裡來〉[Where Does the Black Water Come From?](2026-08-16)Original URLhttps://ourisland.pts.org.tw/content/2463Retrieved2026-10-19Snapshot timestamp—R005Source中央社 [CNA]、工商時報 [Commercial Times]、中時 [China Times]、公視新聞 [PTS News] reports, 2025-11 to 2026-07, on the Chengxi Landfill fires and the black-water incidentOriginal URLhttps://www.youtube.com/watch?v=n9612AwZ1WIRetrieved2026-10-19Snapshot timestamp—. See the "Differing accounts" section of History of the Chengxi Landfill and Incinerator.
Where the sources disagree
Start and completion dates of the Chengxi Incinerator
- Account 1Wikipedia: the infobox gives 「始建時間 1993年4月29日」 ("construction began April 29, 1993"), while the article text says this was the date the contract was awarded; the text also records that the winning contractor entered the site and began work on 1995-01-11, the furnace was fired up on 1998-05-21, and the plant was formally completed on 1999-02-16R003Source維基百科中文版:城西垃圾焚化廠 [Chinese Wikipedia: Chengxi Incinerator]Original URLhttps://zh.wikipedia.org/zh-tw/%E5%9F%8E%E8%A5%BF%E5%9E%83%E5%9C%BE%E7%84%9A%E5%8C%96%E5%BB%A0Retrieved2026-10-19Snapshot timestamp—Incinerator dates: contract awarded 1993-04-29, work on site from 1995-01-11, fired up 1998-05-21, completed 1999-02-16.
- Account 2Control Yuan investigation report: 「自84年5月1日起動工興建城西垃圾焚化廠」 ("construction of the Chengxi Garbage Incinerator began on May 1, [ROC] 84") (1995-05-01)R008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Incinerator dates: construction from 1995-05-01.
- Account 3Tucheng Elementary School's old website (2002 snapshot): 「於民國八十三年元月四日開工,八十五年八月完工啟用」 ("construction began on January 4, ROC 83, and it was completed and put into service in August [ROC] 85") (construction began 1994-01-04, completed 1996-08)R031Source土城國小 [Tucheng Elementary School] old website, local-studies subsite pages〈菅仔埔的春天〉[Spring at Guanzaipu] and〈城西焚化爐〉[The Chengxi Incinerator](2002-03-20 snapshot)(Wayback Machine snapshot; the original site has closed)Original URLhttps://web.archive.org/web/20020320204505/http://www.tcps.tn.edu.tw:80/teach/country/factory_burngarbage.htmRetrieved2026-10-30Snapshot timestamp—A local school web page from 2002, with no source cited; 「85 年 8 月完工啟用」 ("completed and put into service in August [ROC] 85 [1996]") may have been a scheduled date. Unverified. Incinerator dates: construction began 1994-01-04, completed and put into use in August 1996.
The Tucheng Elementary School page cites no source; "completed August [ROC] 85" may have been the scheduled date at the time.
Which phase passed its EIA in 2003Handling on this site: Unverified
- Account 1EIA documents: 2003-04-28, general industrial waste (including incineration ash) sanitary landfill, 7 hectaresR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, EIA Document Search System]:0780652A(焚化廠,14.5 公頃 [incinerator, 14.5 ha])、0860011V(三期,10.7 公頃 [Phase 3, 10.7 ha])、0920011V(一般事業廢棄物含灰渣,7 公頃 [general industrial waste including ash, 7 ha])、1040088V(四期環差 [Phase 4 EIA difference analysis])、1150041V(城西循環園區,14 公頃 [Chengxi Circular Economy Park, 14 ha])Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—
- Account 2Secondary timeline: in 2003, Phase 4 of the Chengxi garbage landfill (on the windbreak forest belt, 14 hectares planned) passed its EIAR007Source台江歷史時間線(戰後段,二次彙編)[Taijiang historical timeline (postwar section, secondary compilation)]Original URL—Retrieved2026-10-18Snapshot timestamp—A secondary compilation; where it conflicts with primary records, the primary records prevail.
Capacity added by reactivating Chengxi Phase 3
- Account 1City government's 2016 reply to the council: reactivating Chengxi Phase 3 is expected to add about 360,000 cubic metersR010Source臺南市議會 [Tainan City Council] 第 2 屆第 4 次定期會 [2nd Council, 4th regular session], motion by Councilor Lee Tui-chih (李退之)〈建請臺南市政府提早規劃全市垃圾處理方案,避免109年垃圾氾濫危機,以安民心〉[Requesting the Tainan City Government to plan a citywide waste-treatment program early, to avert a garbage-overflow crisis in 2020 (ROC year 109) and reassure the public] and the city government's report on action taken, resolved 2016-12-23Original URLhttps://www.tncc.gov.tw/motions/page.asp?mainid=0ACBFF06-0D0B-49D8-BD9A-AB2C3F96F822Retrieved2026-10-30Snapshot timestamp—
- Account 2Environmental Protection Bureau: Phase 3 reactivation completed, 265,000 cubic meters; the city government's 2020 explanation also gives about 265,000 cubic metersR009Source臺南市政府環境保護局 [Environmental Protection Bureau, Tainan City Government],〈城西垃圾衛生掩埋場〉[Chengxi Sanitary Landfill] introduction pageOriginal URLhttps://www.tnepb.gov.tw/mode02.aspx?boss=20251205104502728Retrieved2026-10-30Snapshot timestamp—
The former is the planned figure; the latter is the completed figure.
The city government's 2016 explanation of why Chengxi Phase 4 had not started
- Account 1One version of the action report: currently suspended because of public protestsR010Source臺南市議會 [Tainan City Council] 第 2 屆第 4 次定期會 [2nd Council, 4th regular session], motion by Councilor Lee Tui-chih (李退之)〈建請臺南市政府提早規劃全市垃圾處理方案,避免109年垃圾氾濫危機,以安民心〉[Requesting the Tainan City Government to plan a citywide waste-treatment program early, to avert a garbage-overflow crisis in 2020 (ROC year 109) and reassure the public] and the city government's report on action taken, resolved 2016-12-23Original URLhttps://www.tncc.gov.tw/motions/page.asp?mainid=0ACBFF06-0D0B-49D8-BD9A-AB2C3F96F822Retrieved2026-10-30Snapshot timestamp—
- Account 2Another version of the action report: currently pending clarification of the lawR010Source臺南市議會 [Tainan City Council] 第 2 屆第 4 次定期會 [2nd Council, 4th regular session], motion by Councilor Lee Tui-chih (李退之)〈建請臺南市政府提早規劃全市垃圾處理方案,避免109年垃圾氾濫危機,以安民心〉[Requesting the Tainan City Government to plan a citywide waste-treatment program early, to avert a garbage-overflow crisis in 2020 (ROC year 109) and reassure the public] and the city government's report on action taken, resolved 2016-12-23Original URLhttps://www.tncc.gov.tw/motions/page.asp?mainid=0ACBFF06-0D0B-49D8-BD9A-AB2C3F96F822Retrieved2026-10-30Snapshot timestamp—
Year the compensation facilities were completed
- Account 1Control Yuan: construction began July [ROC] 89 and was completed June [ROC] 93 (2004-06)R008Source監察院 [Control Yuan],Lee Yueh-te (李月德), Chen Ching-tsai (陳慶財) 調查報告 104財調0040 全文 [full text of investigation report 104 Cai-Diao 0040](城西垃圾焚化廠回饋設施經營管理 [Operation and management of the Chengxi Incinerator compensation facilities]),2015-11-04 審議 [deliberated]Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Incinerator dates: construction from 1995-05-01.
- Account 2Shuiduoduo Water Park closure announcement (quoted by the Liberty Times): 「城西回饋設施自91年興建完成」 ("the Chengxi compensation facilities were completed in [ROC] 91") (2002)R022Source自由時報 [Liberty Times]〈台南「水多多」宣布停業 環局:朝共融式公園設計規劃〉[Tainan's Shuiduoduo Announces Closure; EPB: Planning Toward an Inclusive Park], 2020-06-04, and〈台南》「水多多」停業 環局:轉型共融式公園〉[Tainan: Shuiduoduo Closes; EPB: To Be Transformed into an Inclusive Park], 2020-06-05, 記者 [reporter] Wang Shu-hsiu (王姝琇)Original URLhttps://news.ltn.com.tw/news/life/breakingnews/3187066Retrieved2026-10-30Snapshot timestamp—See also https://news.ltn.com.tw/news/life/paper/1377562 . The report quotes the Shuiduoduo Water Park's Facebook announcement: 「城西回饋設施自91年興建完成迄今已屆18年」 ("it has been 18 years since the Chengxi compensation facilities were completed in [ROC year] 91 [2002]").
Construction start date of the replacement furnace
- Account 1CNA groundbreaking report, 2023-09-19: 「預定10月開工」 ("construction scheduled to begin in October")R025Source中央社 [CNA]〈台南城西垃圾焚化廠更新爐動土 115年營運〉[Groundbreaking for Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 2023-09-19, 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.cna.com.tw/news/aloc/202309190097.aspxRetrieved2026-10-30Snapshot timestamp—
- Account 2Tainan City Government press release, 2026-10-28: 「112年12月28日正式開工」 ("construction formally began on December 28, [ROC] 112")R027Source臺南市政府新聞 [Tainan City Government news]〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Replacement Incineration Furnace Scheduled to Begin Formal Operation Next Year; Huang Wei-che: Citywide Waste-Treatment Capacity Effectively Raised], 2026-10-28, 發稿人 [press officer] Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day, China Daily News (中華日報), 〈城西更新爐明年正式營運〉 ("Chengxi Replacement Furnace to Begin Formal Operation Next Year"), wrote 「一一二年十二月底正式開工」 ("construction formally began at the end of December [ROC] 112 [2023]"): https://www.cdns.com.tw/articles/1481476 .
- Account 3United Daily News, 2025-11-16: 「前年10月開工」 ("construction began in October the year before last")R028Source聯合報 [United Daily News]〈新焚化爐明年啟用!安南承擔全台南逾半垃圾去化量 遭怨不公〉[New Incinerator Opens Next Year! Annan Bears More Than Half of All Tainan's Garbage Disposal, Drawing Complaints of Unfairness], 2025-11-16, 記者 [reporter] Wu Shu-ling (吳淑玲)Original URLhttps://udn.com/news/story/7326/9142116Retrieved2026-10-30Snapshot timestamp—
Date the replacement furnace was fired up
- Account 1Tainan City Government press release, 2026-10-28: 「2月10日點火儀式」 ("firing-up ceremony on February 10")R027Source臺南市政府新聞 [Tainan City Government news]〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Replacement Incineration Furnace Scheduled to Begin Formal Operation Next Year; Huang Wei-che: Citywide Waste-Treatment Capacity Effectively Raised], 2026-10-28, 發稿人 [press officer] Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day, China Daily News (中華日報), 〈城西更新爐明年正式營運〉 ("Chengxi Replacement Furnace to Begin Formal Operation Next Year"), wrote 「一一二年十二月底正式開工」 ("construction formally began at the end of December [ROC] 112 [2023]"): https://www.cdns.com.tw/articles/1481476 .
- Account 2CNA dispatch of 2026-02-11: Mayor Huang Wei-che 「今天主持點火儀式」 ("presided over the firing-up ceremony today")R026Source中央社 [CNA]〈台南城西垃圾焚化廠更新爐點火 年底完工營運〉[Replacement Furnace at Tainan's Chengxi Incinerator Fired Up; Completion and Operation by Year's End], 2026-02-11, 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.cna.com.tw/news/aloc/202602110147.aspxRetrieved2026-10-30Snapshot timestamp—
See also
- Chengxi Windbreak Forest⚖︎Coastal windbreak forest in Chengxi Village, AnnanContains 2 items
- Chengxi VillageVillage of Annan District, commonly called Gangzixi
- Qingcaolun SeawallA seawall south of the Zengwen River mouth
- CicadidaeTaiwan twilight cicada (Taiwanosemia hoppoensis)⚖︎Taiwan-endemic dawn-and-dusk cicada, sole species of its genus
- CardisomatidaeBrown Land Crab (Cardisoma carnifex)⚖︎Large land crab of the family Cardisomatidae
- Taijiang National Park⚖︎Taiwan's only wetland national park
- 1987 to present・Scholars and local historiansWu Mao-chengThe man behind "great temples promoting learning"
- 1987 to present・Elected representatives and officialsKuo Ching-hua⚖︎Tainan City councilor
- 1987 to present・Elected representatives and officialsKuo Hsin-liang⚖︎Tainan city councilor and former council speaker
- 1987 to present・Elected representatives and officialsHuang Wei-cheMayor of Tainan and former legislator
- Environmental Protection Bureau, Tainan City GovernmentTainan's environmental protection authorityContains 2 items
- 1987 to present・Elected representatives and officialsYen Wen-cheng⚖︎Village chief of Chengxi Village, Annan District
- Annan Gangxi Aquaculture Production ZoneAn aquaculture production zone in Annan District
- 1987 to present・Postwar officialsWei Hsing-nanEnvironmental Protection Bureau staff member in the Chengxi landfill compensation case
- Garbage Road (Anqing Road)Road to the Chengxi Incinerator
- 1987 to present・Journalists and mediaTsai Wen-chuLiberty Times reporter in Tainan
- CasuarinaceaeBeach She-oak (Casuarina equisetifolia)A coastal windbreak tree of the family Casuarinaceae
- 1987 to present・Scholars and local historiansChao Jui-kuangResearcher, environment group of the Tainan Community University
- 1987 to present・Elected representatives and officialsChen Kun-hoTainan City councilor
- 1987 to present・Postwar officialsChen Ching-tsaiControl Yuan member on Chengxi facilities
- 1987 to present・Postwar officialsMark ChenFormer magistrate of Tainan County and minister of foreign affairs
- History of the Chengxi Landfill and IncineratorThe year-by-year course of the Chengxi Landfill and Incinerator
- Chengxi StreetLong street from Tuchengzi to Chengxi and the coast
- Shuidingdang Water ParkWater park built as compensation for the Chengxi Incinerator
- DioxinCollective name for polychlorinated dioxins and furans
- Public Statements on the Kuo Hsin-liang CasesPublic reactions to the four criminal cases of Kuo Hsin-liang
- 1987 to present・Journalists and mediaHung Jung-chihChina Times reporter in Tainan
- 1987 to present・Scholars and local historiansHuang Ta-chunWetland and aquatic ecology scholar
- 1987 to present・Elected representatives and officialsHuang Huang-hsiungFormer Control Yuan member
- 1987 to present・Postwar officialsHuang Jui-enEPB chief secretary who briefed the Control Yuan
- 1987 to present・Scholars and local historiansHuang Wen-po (黃文伯)NUTN scholar who opposed landfill Phase 4
- 1987 to present・Elected representatives and officialsChiang Ming-tsungDeputy chair, Taiwan People's Party Tainan City chapter
- 1987 to present・Fishers, fish farmers and farmersKuo Kun-shanChair of the Fucheng Aquaculture Development Association
- 1987 to present・Journalists and mediaLai Kuan-chengReporter for PTS's Our Island
- 1987 to present・Postwar officialsLan Hui-chuanIssuer of the Chengxi incinerator press release
- 1987 to present・Elected representatives and officialsLee Tui-chihTainan City councillor and former deputy minister of agriculture
- 1987 to present・Postwar officialsLee Yueh-teMember of the 5th Control Yuan
- 1987 to present・Scholars and local historiansLee Cheng-changLand-crab researcher
- 1987 to present・Postwar officialsLin Chien-sanDeputy director of the Tainan City Environmental Protection Bureau
- 1987 to present・Elected representatives and officialsLin Yen-chuCouncilor who raised the joss-paper backlog at the Chengxi incinerator
- Qingkunshen⚖︎Fishing village on the Jiangjun coastContains 1 items
- 1987 to present・Postwar officialsChiu Jui-chiChief of the Waste Management Section, Tainan City EPB
- 1987 to present・Scholars and local historiansShan Hsin-yuCivil engineering and hydrogeology scholar
- Taiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
- Naming and survey history of the Taiwan twilight cicadaNaming and survey records of the Taiwan twilight cicada
- Tucheng Industrial ZoneUrban-planning industrial zone in Annan DistrictContains 1 items
- 1987 to present・Journalists and mediaWang Shu-hsiuTainan reporter for the Liberty Times
- 1987 to present・Journalists and mediaWu Shu-lingUnited Daily News reporter
- 1987 to present・People in major eventsHsieh Ho-linMember of Taiwan Watch Institute
- 1987 to present・Postwar officialsHsu Jen-tseDirector of the Tainan City Environmental Protection Bureau
- 1987 to present・Elected representatives and officialsHsu Tain-tsair⚖︎Former Mayor of Tainan and legislator
- 1987 to present・Elected representatives and officialsHsu Yu-jenTainan City councilor
- 1987 to present・Postwar officialsYen Sheng-chiDeputy Secretary-General of the Tainan City Council
- 1987 to present・Postwar officialsTseng Shu-chengThe deputy mayor who suspended Chengxi Phase 4
- 1987 to present・Postwar officialsChang Huang-chenFormer director of the Tainan City EPB
- 1987 to present・Postwar officialsChao Ching-huiDeputy mayor at the Chengxi BOT signing
- 1987 to present・Shops and businessesChou Li-mingChairman of Chengxi Energy Co., Ltd.
Video
Videos were uploaded by their respective channels; titles and channel names follow the video pages. This site quotes only short excerpts with timecodes; the videos themselves are authoritative.
Reports that mention it
Hall of the Present6.1Present conditions and institutions / Industrial parks and pollutionMain
The Chengxi Landfill and Incinerator
Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
Hall of the Present6.6Present conditions and institutions / National park
How the National Park Sees Tucheng
This page is not about scenery. It is about how a 394-page statutory plan (the approved edition) describes, classifies, and passes over Tucheng — together with one observation on naming: the authorities recognize "Chengxi" and "Qingcaolun" but not "Tucheng."
- Hall of the PresentHall front page: Hall of the Present
Continue from here
- Gangzixi (Chengxi Village): other Institutions and SchoolsTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
- People involvedChen Kun-hoTainan City councilor
- Entries in the same hallBinnan Industrial Park⚖︎A 1990s petrochemical and steel industrial park project at QiguContains 73 items