History
- Among the compensation measures for the Chengxi Incinerator, besides 「按戶口給予補償」 ("compensation paid according to household registration"), this themed water park was commissioned R001SourceLu Jui-hsiang (呂瑞祥), 《鹿耳門溪沿岸地方開發的歷史變遷》[The Historical Changes of the Regional Development along Luerhmen Creek], 國立臺南大學臺灣文化研究所碩士論文 [master's thesis, Graduate Institute of Taiwan Culture, National University of Tainan], 2010, p. 170Original URL—Retrieved2026-11-02Snapshot timestamp—SourceFrom 《The Historical Changes of the Regional Development along Luerhmen Creek (鹿耳門溪沿岸地方開發的歷史變遷)》p. 170.
- Originally named 「夢幻水城」 ("Dream Water City"), later renamed 「臺南水叮噹親水樂園(Ding Dang Water Park)」 R001SourceLu Jui-hsiang (呂瑞祥), 《鹿耳門溪沿岸地方開發的歷史變遷》[The Historical Changes of the Regional Development along Luerhmen Creek], 國立臺南大學臺灣文化研究所碩士論文 [master's thesis, Graduate Institute of Taiwan Culture, National University of Tainan], 2010, p. 170Original URL—Retrieved2026-11-02Snapshot timestamp—SourceFrom 《The Historical Changes of the Regional Development along Luerhmen Creek (鹿耳門溪沿岸地方開發的歷史變遷)》p. 170.
- The years of opening and closure are not known; related records can be found in the entry on the Chengxi Landfill and Incinerator.
Operation
- 「當地居民憑身份證入場」 ("local residents are admitted on presentation of their ID cards") R001SourceLu Jui-hsiang (呂瑞祥), 《鹿耳門溪沿岸地方開發的歷史變遷》[The Historical Changes of the Regional Development along Luerhmen Creek], 國立臺南大學臺灣文化研究所碩士論文 [master's thesis, Graduate Institute of Taiwan Culture, National University of Tainan], 2010, p. 170Original URL—Retrieved2026-11-02Snapshot timestamp—SourceFrom 《The Historical Changes of the Regional Development along Luerhmen Creek (鹿耳門溪沿岸地方開發的歷史變遷)》p. 170.
See also
- Chengxi Landfill and Incinerator⚖︎Refuse incinerator and landfill in Chengxi Village, Annan District, TainanContains 8 items
- Garbage Road (Anqing Road)Road to the Chengxi Incinerator
- Gangzixi⚖︎The westernmost jiaotou of Tuchengzai
Reports that mention it
Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution
The Chengxi Landfill and Incinerator
Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.