Lin Chien-san (林健三) is a deputy director of the Tainan City Environmental Protection Bureau, appearing with that title in public records of both 2009 (before the city–county merger) and 2015 (after the merger) [R002][R001].
Relationship map
Lin Chien-san (林健三) is a deputy director of the Tainan City Environmental Protection Bureau, appearing with that title in public records of both 2009 (before the city–county merger) and 2015 (after the merger) R002Source臺南市議會 [Tainan City Council] press release, 第一審查委員會 [First Review Committee] 「中石化(台鹼)安順廠土壤整治計畫」公聽會 [public hearing on the "CPDC (Taiwan Alkali) Anshun Plant Soil Remediation Plan"], 2009-02-09Original URLhttps://www.tncc.gov.tw/2019/tnccp/news_01.asp?mainid={B7C3A095-D10E-4F96-A474-34D4E74E7258}Retrieved2026-10-29Snapshot timestamp—Opened again on 2026-10-30; the list of attendees includes 「臺南市環保局局長張皇珍、副局長林健三」 ("Tainan City EPB Director Chang Huang-chen, Deputy Director Lin Chien-san").R001Source監察院 [Control Yuan] investigation report 104財調0040 (investigated by 李月德 Lee Yueh-te and 陳慶財 Chen Ching-tsai, reviewed 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Original text: 「於104年8月31日現場履勘暨聽取臺南市府環保局黃主任秘書瑞恩等業務相關人員及經營廠商簡報後,嗣於同年9月9日詢問該局林副局長健三等業務相關人員」 ("after an on-site inspection on August 31, 2015 (ROC year 104) and briefings by Chief Secretary Huang Jui-en and other relevant staff of the Tainan City Government Environmental Protection Bureau and by the operator, on September 9 of the same year we questioned the bureau's Deputy Director Lin Chien-san and other relevant staff")..Official record On 9 February 2009 Lin attended, with Director Chang Huang-chen, the public hearing held by the City Council's First Review Committee on the soil remediation plan for the CPDC (Taiwan Alkali) Anshun plant R002Source臺南市議會 [Tainan City Council] press release, 第一審查委員會 [First Review Committee] 「中石化(台鹼)安順廠土壤整治計畫」公聽會 [public hearing on the "CPDC (Taiwan Alkali) Anshun Plant Soil Remediation Plan"], 2009-02-09Original URLhttps://www.tncc.gov.tw/2019/tnccp/news_01.asp?mainid={B7C3A095-D10E-4F96-A474-34D4E74E7258}Retrieved2026-10-29Snapshot timestamp—Opened again on 2026-10-30; the list of attendees includes 「臺南市環保局局長張皇珍、副局長林健三」 ("Tainan City EPB Director Chang Huang-chen, Deputy Director Lin Chien-san").; in 2015, during the Control Yuan's investigation of the management of the Chengxi incinerator's feedback facilities, Lin and other bureau staff were questioned on 9 September R001Source監察院 [Control Yuan] investigation report 104財調0040 (investigated by 李月德 Lee Yueh-te and 陳慶財 Chen Ching-tsai, reviewed 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Original text: 「於104年8月31日現場履勘暨聽取臺南市府環保局黃主任秘書瑞恩等業務相關人員及經營廠商簡報後,嗣於同年9月9日詢問該局林副局長健三等業務相關人員」 ("after an on-site inspection on August 31, 2015 (ROC year 104) and briefings by Chief Secretary Huang Jui-en and other relevant staff of the Tainan City Government Environmental Protection Bureau and by the operator, on September 9 of the same year we questioned the bureau's Deputy Director Lin Chien-san and other relevant staff")..Official record
Life
- Education: a 2010 Global Views Monthly report calls Lin Chien-san the "senior schoolmate at National Taiwan University" (台大學長) of Director Chang Huang-chen (張皇珍) R003Source遠見雜誌 [Global Views Monthly]〈創意環保施政,為台南市年減1萬噸碳排〉[Creative Environmental Policy Cuts Tainan's Carbon Emissions by 10,000 Tonnes a Year] (2010-12-13, 呂愛麗 Lu Ai-li)Original URLhttps://www.gvm.com.tw/article/14549Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Position: deputy director of the Tainan City EPB (records from 2009, 2010 and 2015) R002Source臺南市議會 [Tainan City Council] press release, 第一審查委員會 [First Review Committee] 「中石化(台鹼)安順廠土壤整治計畫」公聽會 [public hearing on the "CPDC (Taiwan Alkali) Anshun Plant Soil Remediation Plan"], 2009-02-09Original URLhttps://www.tncc.gov.tw/2019/tnccp/news_01.asp?mainid={B7C3A095-D10E-4F96-A474-34D4E74E7258}Retrieved2026-10-29Snapshot timestamp—Opened again on 2026-10-30; the list of attendees includes 「臺南市環保局局長張皇珍、副局長林健三」 ("Tainan City EPB Director Chang Huang-chen, Deputy Director Lin Chien-san").R003Source遠見雜誌 [Global Views Monthly]〈創意環保施政,為台南市年減1萬噸碳排〉[Creative Environmental Policy Cuts Tainan's Carbon Emissions by 10,000 Tonnes a Year] (2010-12-13, 呂愛麗 Lu Ai-li)Original URLhttps://www.gvm.com.tw/article/14549Retrieved2026-10-30Snapshot timestamp—R001Source監察院 [Control Yuan] investigation report 104財調0040 (investigated by 李月德 Lee Yueh-te and 陳慶財 Chen Ching-tsai, reviewed 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Original text: 「於104年8月31日現場履勘暨聽取臺南市府環保局黃主任秘書瑞恩等業務相關人員及經營廠商簡報後,嗣於同年9月9日詢問該局林副局長健三等業務相關人員」 ("after an on-site inspection on August 31, 2015 (ROC year 104) and briefings by Chief Secretary Huang Jui-en and other relevant staff of the Tainan City Government Environmental Protection Bureau and by the operator, on September 9 of the same year we questioned the bureau's Deputy Director Lin Chien-san and other relevant staff")..Official record
- 2009-02-09 Attended the City Council public hearing on the CPDC (Taiwan Alkali) Anshun Plant soil remediation plan R002Source臺南市議會 [Tainan City Council] press release, 第一審查委員會 [First Review Committee] 「中石化(台鹼)安順廠土壤整治計畫」公聽會 [public hearing on the "CPDC (Taiwan Alkali) Anshun Plant Soil Remediation Plan"], 2009-02-09Original URLhttps://www.tncc.gov.tw/2019/tnccp/news_01.asp?mainid={B7C3A095-D10E-4F96-A474-34D4E74E7258}Retrieved2026-10-29Snapshot timestamp—Opened again on 2026-10-30; the list of attendees includes 「臺南市環保局局長張皇珍、副局長林健三」 ("Tainan City EPB Director Chang Huang-chen, Deputy Director Lin Chien-san")..Official record
- 2015-09-09 Questioned by the Control Yuan in the Chengxi incinerator compensation facilities case R001Source監察院 [Control Yuan] investigation report 104財調0040 (investigated by 李月德 Lee Yueh-te and 陳慶財 Chen Ching-tsai, reviewed 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Original text: 「於104年8月31日現場履勘暨聽取臺南市府環保局黃主任秘書瑞恩等業務相關人員及經營廠商簡報後,嗣於同年9月9日詢問該局林副局長健三等業務相關人員」 ("after an on-site inspection on August 31, 2015 (ROC year 104) and briefings by Chief Secretary Huang Jui-en and other relevant staff of the Tainan City Government Environmental Protection Bureau and by the operator, on September 9 of the same year we questioned the bureau's Deputy Director Lin Chien-san and other relevant staff")..Official record
Activities
First items: Taiwan Alkali Anshun Plant: on 2009-02-0…Compensation facilities of the Chengxi i…Interviewed by Global Views Monthly in 2…MoreLess
-
Taiwan Alkali Anshun Plant: on 2009-02-09 the First Review Committee of the Tainan City Council (convener Lin Chun-hsien (林俊憲), councilors Chuang Yu-chu (莊玉珠) and Lu Kun-fu (盧崑福)) held a public hearing on the "CPDC (Taiwan Alkali) Anshun Plant Soil Remediation Plan," inviting EPB Director Chang Huang-chen, Deputy Director Lin Chien-san, CPDC representative Wu Heng-shan (吳衡山), Huang Huan-chang (黃煥彰) of the community college, Wu Tung-chieh (吳東傑) of the Green Formosa Front, Hsieh Ho-lin (謝和霖) of the Taiwan Watch Institute (看守台灣), and the chiefs of Xiangong, Luer and Sicao villages, among others R002Source臺南市議會 [Tainan City Council] press release, 第一審查委員會 [First Review Committee] 「中石化(台鹼)安順廠土壤整治計畫」公聽會 [public hearing on the "CPDC (Taiwan Alkali) Anshun Plant Soil Remediation Plan"], 2009-02-09Original URLhttps://www.tncc.gov.tw/2019/tnccp/news_01.asp?mainid={B7C3A095-D10E-4F96-A474-34D4E74E7258}Retrieved2026-10-29Snapshot timestamp—Opened again on 2026-10-30; the list of attendees includes 「臺南市環保局局長張皇珍、副局長林健三」 ("Tainan City EPB Director Chang Huang-chen, Deputy Director Lin Chien-san")..Official record
- The hearing concluded by asking the EPB to study the problems of the remediation plan, including the thermal treatment method, the estimate of the volume of dioxin-contaminated soil, and the technology and cost of treating mercury and dioxin together R002Source臺南市議會 [Tainan City Council] press release, 第一審查委員會 [First Review Committee] 「中石化(台鹼)安順廠土壤整治計畫」公聽會 [public hearing on the "CPDC (Taiwan Alkali) Anshun Plant Soil Remediation Plan"], 2009-02-09Original URLhttps://www.tncc.gov.tw/2019/tnccp/news_01.asp?mainid={B7C3A095-D10E-4F96-A474-34D4E74E7258}Retrieved2026-10-29Snapshot timestamp—Opened again on 2026-10-30; the list of attendees includes 「臺南市環保局局長張皇珍、副局長林健三」 ("Tainan City EPB Director Chang Huang-chen, Deputy Director Lin Chien-san")..Official record
- See "Taiwan Alkali Anshun Plant".
-
Compensation facilities of the Chengxi incinerator: in the Control Yuan investigation 104財調0040, an on-site inspection with a briefing by Chief Secretary Huang Jui-en (黃瑞恩) took place on 2015-08-31, and on September 9 the investigators questioned Deputy Director Lin Chien-san and other relevant staff R001Source監察院 [Control Yuan] investigation report 104財調0040 (investigated by 李月德 Lee Yueh-te and 陳慶財 Chen Ching-tsai, reviewed 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Original text: 「於104年8月31日現場履勘暨聽取臺南市府環保局黃主任秘書瑞恩等業務相關人員及經營廠商簡報後,嗣於同年9月9日詢問該局林副局長健三等業務相關人員」 ("after an on-site inspection on August 31, 2015 (ROC year 104) and briefings by Chief Secretary Huang Jui-en and other relevant staff of the Tainan City Government Environmental Protection Bureau and by the operator, on September 9 of the same year we questioned the bureau's Deputy Director Lin Chien-san and other relevant staff")..Official record
- The case summary of the same report states that the National Audit Office reported that the former Tainan City EPB and the Tainan City Government EPB, in managing the compensation facilities of the Chengxi waste incinerator, 「核有未盡職責及效能過低情事」 ("were found to have failed in their duties and to have performed with excessively low efficiency") R001Source監察院 [Control Yuan] investigation report 104財調0040 (investigated by 李月德 Lee Yueh-te and 陳慶財 Chen Ching-tsai, reviewed 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—Original text: 「於104年8月31日現場履勘暨聽取臺南市府環保局黃主任秘書瑞恩等業務相關人員及經營廠商簡報後,嗣於同年9月9日詢問該局林副局長健三等業務相關人員」 ("after an on-site inspection on August 31, 2015 (ROC year 104) and briefings by Chief Secretary Huang Jui-en and other relevant staff of the Tainan City Government Environmental Protection Bureau and by the operator, on September 9 of the same year we questioned the bureau's Deputy Director Lin Chien-san and other relevant staff")..Official record
- See "Chengxi Landfill and Incinerator" and "Environmental Protection Bureau, Tainan City Government".
-
Interviewed by Global Views Monthly in 2010, Lin Chien-san called Lin Chien-san 「工程人,硬邦邦」 ("an engineer, stiff as a board") and described Director Chang Huang-chen as 「雖然是學工程的,卻非常有創意。」 ("although Chang studied engineering, Chang is very creative.") R003Source遠見雜誌 [Global Views Monthly]〈創意環保施政,為台南市年減1萬噸碳排〉[Creative Environmental Policy Cuts Tainan's Carbon Emissions by 10,000 Tonnes a Year] (2010-12-13, 呂愛麗 Lu Ai-li)Original URLhttps://www.gvm.com.tw/article/14549Retrieved2026-10-30Snapshot timestamp—.Secondhand account
See also
- Environmental Protection Bureau, Tainan City GovernmentTainan's environmental protection authorityContains 2 items
- Chengxi Landfill and Incinerator⚖︎Refuse incinerator and landfill in Chengxi Village, Annan District, TainanContains 8 items
- Taiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
- 1987 to present・Postwar officialsHuang Jui-enEPB chief secretary who briefed the Control Yuan
Reports that mention it
Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution
The Chengxi Landfill and Incinerator
Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
Hall of the Present6.2Present conditions and institutions / Industrial parks and pollution
The Taiwan Alkali Anshun Plant
A complete chronology from the plant's founding in 1938 to the site-wide verification of 2026, for Taiwan's first designated remediation site, D00001. This page also covers the two-year reversal in sediment downstream in the Luermen River, the full procedure of one inter-agency site inspection, and the Jian'an Substitute Elementary School (1947–1971).
Continue from here
- Other PeopleKuo Hsin-liang⚖︎Tainan city councilor and former council speaker
- Belongs toEnvironmental Protection Bureau, Tainan City GovernmentTainan's environmental protection authorityContains 2 items
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.