Life
- Role: named issuer of a Tainan City Government press release (2026-10-28) R001Source臺南市政府新聞 [Tainan City Government news],〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Incinerator Replacement Furnace to Begin Full Operation Next Year; Huang Wei-che: Effectively Raises the City's Waste-Handling Capacity], 2026-10-28, issued by Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day the China Daily News article 〈城西更新爐明年正式營運〉 gives 「一一二年十二月底正式開工」 ("construction formally began at the end of December, [ROC year] 112"): https://www.cdns.com.tw/articles/1481476 .. Official record
Activities
- The 2026-10-28 release records that construction of the Chengxi incinerator replacement furnace 「112年12月28日正式開工」 ("formally began on December 28, [ROC year] 112 [2023]") R001Source臺南市政府新聞 [Tainan City Government news],〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Incinerator Replacement Furnace to Begin Full Operation Next Year; Huang Wei-che: Effectively Raises the City's Waste-Handling Capacity], 2026-10-28, issued by Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day the China Daily News article 〈城西更新爐明年正式營運〉 gives 「一一二年十二月底正式開工」 ("construction formally began at the end of December, [ROC year] 112"): https://www.cdns.com.tw/articles/1481476 .. Official record
- The same release dates the firing-up ceremony to February 10 and expects the replacement furnace to begin full operation in 2027 (ROC year 116) R001Source臺南市政府新聞 [Tainan City Government news],〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Incinerator Replacement Furnace to Begin Full Operation Next Year; Huang Wei-che: Effectively Raises the City's Waste-Handling Capacity], 2026-10-28, issued by Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day the China Daily News article 〈城西更新爐明年正式營運〉 gives 「一一二年十二月底正式開工」 ("construction formally began at the end of December, [ROC year] 112"): https://www.cdns.com.tw/articles/1481476 .. Official record
- The release is cited in the Chengxi landfill and incinerator and Huang Wei-che entries.
See also
- Chengxi Landfill and Incinerator⚖︎Refuse incinerator and landfill in Chengxi Village, Annan District, TainanContains 8 items
- 1987 to present・Elected representatives and officialsHuang Wei-cheMayor of Tainan and former legislator
Reports that mention it
Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution
The Chengxi Landfill and Incinerator
Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
Continue from here
- Other PeopleKuo Hsin-liang⚖︎Tainan city councilor and former council speaker
- Related entriesChengxi Landfill and Incinerator⚖︎Refuse incinerator and landfill in Chengxi Village, Annan District, TainanContains 8 items
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.