Lan Hui-chuan

Official record
101

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Issuer of Tainan City Government press releases; named as issuer of the October 28, 2026 release on the Chengxi incinerator replacement furnace.R001Source臺南市政府新聞 [Tainan City Government news],〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Incinerator Replacement Furnace to Begin Full Operation Next Year; Huang Wei-che: Effectively Raises the City's Waste-Handling Capacity], 2026-10-28, issued by Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp(None, or not applicable)The same day the China Daily News article 〈城西更新爐明年正式營運〉 gives 「一一二年十二月底正式開工」 ("construction formally began at the end of December, [ROC year] 112"): https://www.cdns.com.tw/articles/1481476 .

Category
People
Related reports
1 reports
Also known as
藍惠娟
Related subpages
6.1

Life

  1. Role: named issuer of a Tainan City Government press release (2026-10-28) R001Source臺南市政府新聞 [Tainan City Government news],〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Incinerator Replacement Furnace to Begin Full Operation Next Year; Huang Wei-che: Effectively Raises the City's Waste-Handling Capacity], 2026-10-28, issued by Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day the China Daily News article 〈城西更新爐明年正式營運〉 gives 「一一二年十二月底正式開工」 ("construction formally began at the end of December, [ROC year] 112"): https://www.cdns.com.tw/articles/1481476 .. Official record

Activities

  1. The 2026-10-28 release records that construction of the Chengxi incinerator replacement furnace 「112年12月28日正式開工」 ("formally began on December 28, [ROC year] 112 [2023]") R001Source臺南市政府新聞 [Tainan City Government news],〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Incinerator Replacement Furnace to Begin Full Operation Next Year; Huang Wei-che: Effectively Raises the City's Waste-Handling Capacity], 2026-10-28, issued by Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day the China Daily News article 〈城西更新爐明年正式營運〉 gives 「一一二年十二月底正式開工」 ("construction formally began at the end of December, [ROC year] 112"): https://www.cdns.com.tw/articles/1481476 .. Official record
  2. The same release dates the firing-up ceremony to February 10 and expects the replacement furnace to begin full operation in 2027 (ROC year 116) R001Source臺南市政府新聞 [Tainan City Government news],〈城西焚化更新爐預定明年正式營運 黃偉哲:有效提升全市垃圾處理量能〉[Chengxi Incinerator Replacement Furnace to Begin Full Operation Next Year; Huang Wei-che: Effectively Raises the City's Waste-Handling Capacity], 2026-10-28, issued by Lan Hui-chuan (藍惠娟)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=8843812Retrieved2026-10-30Snapshot timestamp—The same day the China Daily News article 〈城西更新爐明年正式營運〉 gives 「一一二年十二月底正式開工」 ("construction formally began at the end of December, [ROC year] 112"): https://www.cdns.com.tw/articles/1481476 .. Official record
  3. The release is cited in the Chengxi landfill and incinerator and Huang Wei-che entries.

See also

Reports that mention it

Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution

The Chengxi Landfill and Incinerator

Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.

26116

Continue from here

Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.