Chou Li-ming is chairman of Chengxi Energy Co., Ltd. At the signing of the BOT contract for the new furnace at the Chengxi incinerator on February 3, 2023, Environmental Protection Bureau director Hsu Jen-tse signed with Chou and Deputy Mayor Chao Ching-hui attended on the mayor's behalf; the investment exceeded NT$7.2 billion, daily capacity would rise from 600 to 900 tonnes, and operation was then expected in 2026 (ROC year 115) [R001].
Deeds
- February 3, 2023: signing of the BOT contract for the new furnace at the Chengxi incinerator: Environmental Protection Bureau director Hsu Jen-tse signed with Chou Li-ming, chairman of Chengxi Energy Co., Ltd., and Deputy Mayor Chao Ching-hui attended on the mayor's behalf; the investment exceeded NT$7.2 billion, daily capacity would rise from 600 to 900 tonnes, and operation was then expected in 2026 (ROC year 115) R001Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp—CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx .. Official record
See Chengxi Landfill and Incinerator and the Chengxi report.
See also
- Chengxi Landfill and Incinerator⚖︎Refuse incinerator and landfill in Chengxi Village, Annan District, TainanContains 8 items
- 1987 to present・Postwar officialsChao Ching-huiDeputy mayor at the Chengxi BOT signing
Reports that mention it
Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution
The Chengxi Landfill and Incinerator
Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
Continue from here
- Chengxi Windbreak Forest: other PeopleChang Yuan-mouResearcher of amphibian ecology and stable isotopes
- Related entriesChengxi Landfill and Incinerator⚖︎Refuse incinerator and landfill in Chengxi Village, Annan District, TainanContains 8 items
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.