Chou Li-ming

Official record
201

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Chou Li-ming is chairman of Chengxi Energy Co., Ltd., which in 2023 signed a BOT contract with the Tainan City Environmental Protection Bureau for a new furnace at the Chengxi incinerator, an investment of over NT$7.2 billion.R001Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp(None, or not applicable)CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx .

Category
People
Related reports
1 reports
Also known as
周黎明、Zhou Liming
Related subpages
6.1

Chou Li-ming is chairman of Chengxi Energy Co., Ltd. At the signing of the BOT contract for the new furnace at the Chengxi incinerator on February 3, 2023, Environmental Protection Bureau director Hsu Jen-tse signed with Chou and Deputy Mayor Chao Ching-hui attended on the mayor's behalf; the investment exceeded NT$7.2 billion, daily capacity would rise from 600 to 900 tonnes, and operation was then expected in 2026 (ROC year 115) [R001].

Deeds

  1. February 3, 2023: signing of the BOT contract for the new furnace at the Chengxi incinerator: Environmental Protection Bureau director Hsu Jen-tse signed with Chou Li-ming, chairman of Chengxi Energy Co., Ltd., and Deputy Mayor Chao Ching-hui attended on the mayor's behalf; the investment exceeded NT$7.2 billion, daily capacity would rise from 600 to 900 tonnes, and operation was then expected in 2026 (ROC year 115) R001Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp—CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx .. Official record

See Chengxi Landfill and Incinerator and the Chengxi report.

See also

Reports that mention it

Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution

The Chengxi Landfill and Incinerator

Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.