Qingcaolun Seawall

Official recordLocal oral account
630

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

The Qingcaolun Seawall is the sea embankment at Qingcaolun, Annan District, Tainan, on the south side of the Zengwen River mouth, completed in 1985 and about 2 km long; behind it is land-crab habitat, and outside it is the southern limit of the Formosan fiddler crab.R001Source本站編輯整理 [Compiled by the editors of this site]Original URL(None, or not applicable)Retrieved2026-10-23Snapshot timestamp(None, or not applicable)A research draft compiled by this site, based on primary sources.

Category
Places
Related reports
8 reports
Also known as
青草崙堤防防汛道路、Qingcaolun Seawall Flood-Control Road、Qingcaolun Embankment
Related subpages
5.3b
Coordinates
23.048849, 120.071997

The Qingcaolun Seawall (青草崙堤防) is the sea embankment at Qingcaolun in Chengxi Village, Annan District, Tainan, on the south side of the mouth of the Zengwen River, built in 1985 and about 2 km long [R004][R006].

The Qingcaolun Seawall (青草崙堤防) is the sea embankment at Qingcaolun (青草崙) in Chengxi Village, Annan District, Tainan, on the south side of the mouth of the Zengwen River. It was begun in April 1985 and completed in November of the same year, about 2 km long in all, comprising 0.4 km of Zengwen River levee and 1.6 km of seawall R004Source台江國家公園管理處全球資訊網 [Taijiang National Park Headquarters website], 輔導成果〈響應 422 世界地球日,振臂捲袖淨灘活動GO!GO!GO !〉[Guidance Achievements: Answering the call of Earth Day on 4/22: roll up your sleeves for a beach cleanup, GO! GO! GO!] (2017-06-18)Original URLhttps://www.tjnp.gov.tw/ch/titlelist/guidance-achievements/2409Retrieved2026-11-07Snapshot timestamp—Article on the official website (account of the Taijiang National Park Headquarters only).R006SourceHung Jung-chung (洪榮中),《青草崙海岸變遷與復育研究》[Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast],國立成功大學水利及海洋工程學系在職專班 [In-service Master's Program, Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2007,頁 I、26–28、49–54、59 [pp. I、26–28、49–54、59]Original URL—Retrieved2026-11-12Snapshot timestamp—SourceFrom 《Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast (青草崙海岸變遷與復育研究)》p. I、26–28、49–54、59. Behind it lie coastal forest and a flood-patrol road that are important habitat for land crabs such as the brown land crab, with crab-protection traffic controls every summer; the mudflats outside it mark the southern limit of the Formosan fiddler crab's distribution R002Source《陸蟹生態調查》[Land Crab Ecological Survey],Liu Hung-chang (劉烘昌),臺江國家公園管理處 [Taijiang National Park Headquarters] 委託 [commissioned],109 年 [2020 (ROC year 109)]Original URL—Retrieved2026-10-23Snapshot timestamp—R003Source《109–110 年度曾文溪口重要濕地(國家級)生態監測調查》[Ecological Monitoring Survey of the Zengwen River Estuary Wetland of Importance (National Level), ROC years 109–110 (2020–2021)],臺江國家公園管理處 [Taijiang National Park Headquarters] 委託 [commissioned]Original URL—Retrieved2026-10-23Snapshot timestamp—The third and fourth quarterly surveys (February and May of ROC year 110, i.e. 2021) coincided with a once-in-a-century drought, which must be taken into account when interpreting salinity and chlorophyll..

History

2 itemsFirst items: Construction: 「青草崙海堤於民國74年4月興建,同年11月竣工…Reinforcement and damage :MoreLess
  1. Construction: 「青草崙海堤於民國74年4月興建,同年11月竣工,總長2公里,包含曾文溪河堤0.4公里、海堤長1.6公里及堤趾5噸林克消波塊2034顆」 ("the Qingcaolun seawall was begun in April 1985 (ROC year 74) and completed in November of the same year; total length 2 km, comprising 0.4 km of Zengwen River levee and 1.6 km of seawall, with 2,034 five-ton Linke armor units at the toe") R006SourceHung Jung-chung (洪榮中),《青草崙海岸變遷與復育研究》[Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast],國立成功大學水利及海洋工程學系在職專班 [In-service Master's Program, Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2007,頁 I、26–28、49–54、59 [pp. I、26–28、49–54、59]Original URL—Retrieved2026-11-12Snapshot timestamp—SourceFrom 《Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast (青草崙海岸變遷與復育研究)》p. I、26–28、49–54、59. Secondhand account
  2. Reinforcement and damage R006SourceHung Jung-chung (洪榮中),《青草崙海岸變遷與復育研究》[Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast],國立成功大學水利及海洋工程學系在職專班 [In-service Master's Program, Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2007,頁 I、26–28、49–54、59 [pp. I、26–28、49–54、59]Original URL—Retrieved2026-11-12Snapshot timestamp—SourceFrom 《Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast (青草崙海岸變遷與復育研究)》p. I、26–28、49–54、59:
    • 1994 (ROC year 83) Reinforced with rubble and 1,203 armor units; at the time 「有3.5公里未築堤」 ("3.5 km to the south had no embankment").
    • October 1999 (ROC year 88) Moderate Typhoon Dan (丹恩) struck Tainan directly: 「部分堤防崩落,堤防底部亦出現下陷情形」 ("parts of the embankment collapsed and its base subsided").
    • 2000 (ROC year 89) The Sixth River Management Office placed more rubble and 879 armor units, covering 550 m of seawall near the Zengwen River mouth.
    • March 2001 (ROC year 90) The Sixth River Management Office built a 1 km cobble-faced seawall south of the concrete-faced section, completed at the end of the year; height 5 m, front slope 1:4, with planting planned in front.
    • July 2001 (ROC year 90) Typhoon Utor (尤特) badly damaged about 300 m of the flood-patrol road behind the wall, eroding the roadbed up to 30 cm deep; 「挾帶蚵架、木材等得以越過5m堤防,直接拍打到柏油路面」 ("carrying oyster racks, timber and the like over the 5 m wall straight onto the asphalt").
    • 2004 (ROC year 93) A typhoon brought down more than ten meters of the armor units in front of the wall.
    • May 2006 (ROC year 95) After Typhoon Chanchu (珍珠), seawater came round the southern end of the cobble-faced wall onto the flood-patrol road behind it, leaving 30–40 m of drift and sand.

Structure

  1. Specifications: crest height 5 m, crest width 3 m, sand core, concrete facing; seaward slope 1:2, toe at 1:7 with rubble and armor units, landward slope 1:1.25; its functions are 「防潮、防浪、防侵蝕、保護路基及保護聚落」 ("protecting against tides, waves and erosion, and protecting the roadbed and the settlements") R006SourceHung Jung-chung (洪榮中),《青草崙海岸變遷與復育研究》[Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast],國立成功大學水利及海洋工程學系在職專班 [In-service Master's Program, Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2007,頁 I、26–28、49–54、59 [pp. I、26–28、49–54、59]Original URL—Retrieved2026-11-12Snapshot timestamp—SourceFrom 《Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast (青草崙海岸變遷與復育研究)》p. I、26–28、49–54、59.

Coastal erosion

  1. Beach in front of the wall: 「此段海堤外之沙灘(海防哨所北側海岸)在十多年前早以消失」 ("the beach outside this section of seawall (the coast north of the coast-guard post) disappeared more than ten years ago"; 「以」 in the original is a slip for 「已」) R006SourceHung Jung-chung (洪榮中),《青草崙海岸變遷與復育研究》[Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast],國立成功大學水利及海洋工程學系在職專班 [In-service Master's Program, Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2007,頁 I、26–28、49–54、59 [pp. I、26–28、49–54、59]Original URL—Retrieved2026-11-12Snapshot timestamp—SourceFrom 《Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast (青草崙海岸變遷與復育研究)》p. I、26–28、49–54、59.
  2. The author's assessment of the erosion (the author's inference): in the 1960s, before Zengwen Reservoir was finished, unusual floods built a large new sand spit south of the river mouth; after the reservoir was completed in 1973 (ROC year 62), large deposits at the mouth no longer formed easily; the 1985 seawall was built on the spit, and without a sand supply the beach in front of the northern section was lost R006SourceHung Jung-chung (洪榮中),《青草崙海岸變遷與復育研究》[Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast],國立成功大學水利及海洋工程學系在職專班 [In-service Master's Program, Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2007,頁 I、26–28、49–54、59 [pp. I、26–28、49–54、59]Original URL—Retrieved2026-11-12Snapshot timestamp—SourceFrom 《Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast (青草崙海岸變遷與復育研究)》p. I、26–28、49–54、59.
  3. The author's recommendations: widen the platform in front of the northern section (a submerged breakwater) and add rubble; refill and raise the flood-patrol road to +4.5 m R006SourceHung Jung-chung (洪榮中),《青草崙海岸變遷與復育研究》[Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast],國立成功大學水利及海洋工程學系在職專班 [In-service Master's Program, Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2007,頁 I、26–28、49–54、59 [pp. I、26–28、49–54、59]Original URL—Retrieved2026-11-12Snapshot timestamp—SourceFrom 《Evolution of Coastal Line and Recovery of Chin-Tsao-Lun Coast (青草崙海岸變遷與復育研究)》p. I、26–28、49–54、59.

Ecology

  1. The coastal forest and flood-patrol road behind the seawall are habitat for land crabs such as the brown land crab; road kills of 8 species have been recorded, and the Qingcaolun flood-patrol road is the stretch where they occur most often R002Source《陸蟹生態調查》[Land Crab Ecological Survey],Liu Hung-chang (劉烘昌),臺江國家公園管理處 [Taijiang National Park Headquarters] 委託 [commissioned],109 年 [2020 (ROC year 109)]Original URL—Retrieved2026-10-23Snapshot timestamp—.
  2. Along parts of the Zengwen River levee and the Dayuan Harbor seawall, the landward base is a smooth vertical concrete wall at 90 degrees, which lengthens the time egg-bearing females spend stranded on the road; other threats include poaching, horned ghost crabs entangled in discarded fishing nets and left to die in the sun on the beach, the burning of marine litter, and the invasive yellow crazy ant R002Source《陸蟹生態調查》[Land Crab Ecological Survey],Liu Hung-chang (劉烘昌),臺江國家公園管理處 [Taijiang National Park Headquarters] 委託 [commissioned],109 年 [2020 (ROC year 109)]Original URL—Retrieved2026-10-23Snapshot timestamp—.
  3. The mudflats outside the seawall are the southern limit of the Formosan fiddler crab's distribution in Taiwan R003Source《109–110 年度曾文溪口重要濕地(國家級)生態監測調查》[Ecological Monitoring Survey of the Zengwen River Estuary Wetland of Importance (National Level), ROC years 109–110 (2020–2021)],臺江國家公園管理處 [Taijiang National Park Headquarters] 委託 [commissioned]Original URL—Retrieved2026-10-23Snapshot timestamp—The third and fourth quarterly surveys (February and May of ROC year 110, i.e. 2021) coincided with a once-in-a-century drought, which must be taken into account when interpreting salinity and chlorophyll..
  4. Crab-protection traffic control: the official notice covers 「青草崙堤防防汛道路(自城西街三段 1105 巷至青草崙海巡哨所間約 2 公里路段)」 ("the Qingcaolun Seawall flood-patrol road (the stretch of about 2 km from Lane 1105, Chengxi Street Section 3, to the Qingcaolun coast-guard post)"), from July to September, 6:30 to 9:30 p.m.; the Land Crab Ecological Survey recommended closing about 2 km of the flood-patrol road in July and August R002Source《陸蟹生態調查》[Land Crab Ecological Survey],Liu Hung-chang (劉烘昌),臺江國家公園管理處 [Taijiang National Park Headquarters] 委託 [commissioned],109 年 [2020 (ROC year 109)]Original URL—Retrieved2026-10-23Snapshot timestamp—.

Activities

  1. 2017-04-22 Earth Day beach cleanup: the Yunlin-Chiayi-Tainan Regional Environmental Education Center of National University of Tainan (國立臺南大學雲嘉南區環境教育區域中心), the Taijiang Headquarters, residents of Chengxi Village, coast guard units, and Tucheng Elementary School (土城國小) cleaned up the beach along the Qingcaolun seawall in Chengxi Village, recording the types and quantities of litter following the International Coastal Cleanup (ICC) standard procedure and uploading them to the international database R004Source台江國家公園管理處全球資訊網 [Taijiang National Park Headquarters website], 輔導成果〈響應 422 世界地球日,振臂捲袖淨灘活動GO!GO!GO !〉[Guidance Achievements: Answering the call of Earth Day on 4/22: roll up your sleeves for a beach cleanup, GO! GO! GO!] (2017-06-18)Original URLhttps://www.tjnp.gov.tw/ch/titlelist/guidance-achievements/2409Retrieved2026-11-07Snapshot timestamp—Article on the official website (account of the Taijiang National Park Headquarters only).. Official record
  2. On summer evenings (June–August), the Taijiang satoumi tour "Crabs Meet Cicada Song" (「蟹逅蟬鳴」) takes visitors up onto the Qingcaolun embankment to watch the sunset and the mouth of the Zengwen River, listen to the Hoppo cicadas (臺灣暗蟬) in the beach she-oak forest inside the embankment, and protect egg-bearing brown land crabs as they climb over the embankment to the sea to release their larvae R005Source台江國家公園管理處全球資訊網 [Taijiang National Park Headquarters website], 主題報導〈台江里海旅遊夏季限定行程─蟹逅蟬鳴〉[Feature story: A summer-only Taijiang satoumi tour: Crabs Meet Cicada Song] (2024-09-11)Original URLhttps://www.tjnp.gov.tw/ch/titlelist/feature-stories/2391Retrieved2026-11-07Snapshot timestamp—Article on the official website (account of the Taijiang National Park Headquarters only).. Official record
  3. For crab-protection traffic controls and volunteer patrols, see Land Crab Conservation in Taijiang National Park.

Local memories

「2026 年,在地人曾在這條堤防路邊遇見雞肉絲菇;往青草崙夢幻湖的這段路上,也最常遇見凶狠圓軸蟹」 (In 2026, a local resident came across chicken-shred mushrooms (雞肉絲菇, termite mushrooms) by the side of this seawall road; this stretch of road toward Menghuan Lake (夢幻湖) at Qingcaolun (青草崙) is also where brown land crabs (凶狠圓軸蟹) are most often encountered) (local residents' oral account).

Key events

  1. 2015
    1. 2015–2020Egg-bearing female crabs fell from 4,500…MoreLess
      Egg-bearing female crabs fell from 4,500 to 1,728
  2. 2017
    1. 04-22Earth Day beach cleanup on the Qingcaolu…MoreLess
      Earth Day beach cleanup on the Qingcaolun seawall R004Source台江國家公園管理處全球資訊網 [Taijiang National Park Headquarters website], 輔導成果〈響應 422 世界地球日,振臂捲袖淨灘活動GO!GO!GO !〉[Guidance Achievements: Answering the call of Earth Day on 4/22: roll up your sleeves for a beach cleanup, GO! GO! GO!] (2017-06-18)Original URLhttps://www.tjnp.gov.tw/ch/titlelist/guidance-achievements/2409Retrieved2026-11-07Snapshot timestamp—Article on the official website (account of the Taijiang National Park Headquarters only).
  3. 2020
    1. 2020–2022Liu Hung-chang's (劉烘昌) team and voluntee…MoreLess
      Liu Hung-chang's (劉烘昌) team and volunteers conducted an individual-by-individual census on the seawall, with the data entered into TBN
  4. 2022
    1. From 2022 (ROC year 111)The Taijiang National Park Headquarters …MoreLess
      The Taijiang National Park Headquarters (台江處) commissioned Wetlands Taiwan (台灣濕地保護聯盟) to run the "Land Crab Citizen Scientist Program"

See also

Reports that mention it

Hall of Ecology5.3bEcology / HabitatsMain

The Two Faces of the Qingcaolun Seawall

Behind the seawall lie land crabs and the windbreak forest; outside it lies the southernmost limit of the Formosan fiddler crab's range in Taiwan — a mudflat being squeezed between illegal fish farm ponds and a bridge pier about to go under construction.

1964

Hall of Ecology5.6Ecology / Protected areas and disputesMain

Climate Change and the Legal Framework

Sea level is rising 3.4 mm per year, and under a 2℃ scenario 3.29 percent of Tainan would be flooded. The Provincial Highway 61 controversy now has an added layer: its bridge piers land on the southernmost habitat of the Formosan fiddler crab in Taiwan.

2042

Hall of Local Memory9.4Ecology / SpeciesMain

The Mushrooms of Tucheng

Tucheng's mushrooms live on in local memory: one grows by the road along the Qingcaolun seawall, the other on an elementary school playground.

012

Hall of Ecology5.0Ecology / Sandbars and river mouths

The Journey of a Grain of Sand (Overview)

The river's change of course in 1823 created Tucheng; then came the reservoir and groins cutting off the sand, the sandbars retreating east and the lagoon silting up, and the breakwaters of Anping Harbor, all the way to the retreat of the Golden Coast.

1732

Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution

The Chengxi Landfill and Incinerator

Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.

26116

Hall of the Present6.6Present conditions and institutions / National park

How the National Park Sees Tucheng

This page is not about scenery. It is about how a 394-page statutory plan (the approved edition) describes, classifies, and passes over Tucheng — together with one observation on naming: the authorities recognize "Chengxi" and "Qingcaolun" but not "Tucheng."

2275

Hall of Local Memory9.6Everyday memories / Food

Memories of Foraging by the Sea

The gou-gou-tinn snare around the Mid-Autumn Festival, crabs measured against the palm of a hand, crab roe with an earthy taste: memories of foraging on the Chengxi shore.

1031

Hall of Local Memory9.9Everyday memories / Old trees

The Old Trees of Tucheng

Tainan City's register of protected old trees lists only 6 in Annan District, and only 2 in the five villages of Tucheng, both on Chengxi Street Section 2 in Chengnan Village. Yet a two-day walk around Tucheng on October 26 and 27, 2026 recorded more than thirty old-tree sites, numbered T1–T28, S1–S6, and C1, the great majority of them on no register at all.

13188

Continue from here