The Environmental Protection Bureau of the Tainan City Government (臺南市政府環境保護局) is the environmental protection authority of Tainan City; before the 2010 merger of Tainan County and City it was the "former Tainan City Environmental Protection Bureau" (原臺南市環境保護局) [R003]. It oversees the [Chengxi Landfill and Incinerator](/wiki/chengxi-landfill/) and the surrounding community benefit facilities, and is the competent authority for the Regulations Governing Community Benefit Payments During the Operation of Tainan City Refuse Incinerators and Landfills (《臺南市垃圾焚化廠及掩埋場營運階段提供回饋金辦法》) [R001][R003].
Relationship map
History
First items: 1994-07-01 「為因應南沙崙垃圾掩埋場飽和後之垃圾處理問題」 ("to …2008-05-04 Bureau Director Chang Huang-c…2011-02-15 Control Yuan investigation 10…MoreLess
- 1994-07-01 「為因應南沙崙垃圾掩埋場飽和後之垃圾處理問題」 ("to deal with the problem of waste disposal after the Nanshalun garbage landfill became saturated"), refuse began to be landfilled instead at the Chengxi Village (城西里) landfill R003Source監察院調查報告 [Control Yuan Investigation Report] 104財調0040 (investigated by Lee Yueh-te (李月德) and Chen Ching-tsai (陳慶財), deliberated 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—.Official record
- 2008-05-04 Bureau Director Chang Huang-chen (張皇珍) attended the opening of the benefit facility "Tainan Shuidingdang" (台南水叮噹), a water park R005Source自由時報 [Liberty Times], 〈【流行消費】台南水叮噹 開幕〉[[Trends & Shopping] Tainan Shuidingdang Opens], 2008-05-05, reporter Tsai Wen-chu (蔡文居)Original URLhttps://ent.ltn.com.tw/news/paper/208965Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 2011-02-15 Control Yuan investigation 100財調0015 examined the delay in putting the benefit payments on a legal footing; no censure was issued R002Source監察院調查報告 [Control Yuan Investigation Report] 100財調0015 (investigated by Huang Huang-hsiung (黃煌雄), 2011-02-15 (ROC 100/02/15))Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp—.Official record
- 2012-08-06 Responding to the derelict benefit facility, Waste Management Section Chief Yu Hsien-jui (余憲瑞) said: 「考慮從他的履約保證金 扣除之後 自己來接管」 ("we are considering deducting from his performance bond and then taking it over ourselves") R006Source公視新聞 [PTS News], 〈廠商放任荒廢 親水樂園變垃圾場〉[Operator Lets It Go to Ruin: Water Park Turns into a Dump], 2012-08-06Original URLhttps://news.pts.org.tw/article/217361Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 2015-08-31 and 09-09 During site inspections the Control Yuan heard a briefing from Chief Secretary Huang Jui-en (黃瑞恩) and questioned Deputy Director Lin Chien-san (林健三) R003Source監察院調查報告 [Control Yuan Investigation Report] 104財調0040 (investigated by Lee Yueh-te (李月德) and Chen Ching-tsai (陳慶財), deliberated 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—.Official record
- 2015-11-04 The Control Yuan issued a censure: 「怠於監督管理,縱任城西垃圾焚化廠回饋設施委託廠商未依規定期程開放營運及故意荒廢設施設備」 ("neglected its duty of supervision and management, allowing the contractor entrusted with the Chengxi Refuse Incineration Plant's benefit facilities to fail to open them for operation on the prescribed schedule and to deliberately let the facilities and equipment fall into ruin") R004Source監察院糾正案文 [Control Yuan Censure (Corrective Measure) Text] 104財正0017 (deliberated 2015-11-04 (ROC 104/11/04), announced 2015-11-12 (ROC 104/11/12))Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=4585Retrieved2026-10-30Snapshot timestamp—.Official record
- 2023-02-03 Bureau Director Hsu Jen-tse (許仁澤) signed the BOT (build-operate-transfer) contract for the replacement furnace at the Chengxi Refuse Incineration Plant on the bureau's behalf R007Source臺南市政府新聞 [Tainan City Government News], 〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Operation Expected in 2026 (ROC 115); Huang Wei-che Hopes for On-Schedule Completion], 2023-02-03Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp—.Official record
- 2026-06-09 Responding to joss paper stockpiled at the Chengxi incinerator, Director Hsu Jen-tse said the volume brought in for centralized burning was too large, 「才會出現延遲焚燒的現象」 ("which is why burning has been delayed") R008Source工商時報 [Commercial Times] (中時即時 [China Times Instant News]), 〈有沒夢到祖先要錢?台南紙錢堆成山「結蜘蛛網」 議員爆驚人內幕〉[Dreamed of Your Ancestors Asking for Money? Tainan's Joss Paper Piles Up "Gathering Cobwebs"; Councilor Reveals Startling Inside Story], 2026-06-09, reporter Hung Jung-chih (洪榮志)Original URLhttps://www.ctee.com.tw/news/20260609701212-431401Retrieved2026-10-30Snapshot timestamp—.Secondhand account
Directors and other officials
- Chang Huang-chen: Bureau Director (2008) R005Source自由時報 [Liberty Times], 〈【流行消費】台南水叮噹 開幕〉[[Trends & Shopping] Tainan Shuidingdang Opens], 2008-05-05, reporter Tsai Wen-chu (蔡文居)Original URLhttps://ent.ltn.com.tw/news/paper/208965Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Huang Jui-en: Chief Secretary (2015) R003Source監察院調查報告 [Control Yuan Investigation Report] 104財調0040 (investigated by Lee Yueh-te (李月德) and Chen Ching-tsai (陳慶財), deliberated 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—.Official record
- Lin Chien-san: Deputy Director (2015) R003Source監察院調查報告 [Control Yuan Investigation Report] 104財調0040 (investigated by Lee Yueh-te (李月德) and Chen Ching-tsai (陳慶財), deliberated 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—.Official record
- Yu Hsien-jui: Waste Management Section Chief (2012) R006Source公視新聞 [PTS News], 〈廠商放任荒廢 親水樂園變垃圾場〉[Operator Lets It Go to Ruin: Water Park Turns into a Dump], 2012-08-06Original URLhttps://news.pts.org.tw/article/217361Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Hsu Jen-tse: Bureau Director (2023–2026) R007Source臺南市政府新聞 [Tainan City Government News], 〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Operation Expected in 2026 (ROC 115); Huang Wei-che Hopes for On-Schedule Completion], 2023-02-03Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp—R008Source工商時報 [Commercial Times] (中時即時 [China Times Instant News]), 〈有沒夢到祖先要錢?台南紙錢堆成山「結蜘蛛網」 議員爆驚人內幕〉[Dreamed of Your Ancestors Asking for Money? Tainan's Joss Paper Piles Up "Gathering Cobwebs"; Councilor Reveals Startling Inside Story], 2026-06-09, reporter Hung Jung-chih (洪榮志)Original URLhttps://www.ctee.com.tw/news/20260609701212-431401Retrieved2026-10-30Snapshot timestamp—.Official record
Work in Chengxi
- It oversees the Chengxi Landfill (城西掩埋場), the Chengxi Incinerator (城西焚化廠), and the surrounding community benefit facilities; see Chengxi Landfill and Incinerator R003Source監察院調查報告 [Control Yuan Investigation Report] 104財調0040 (investigated by Lee Yueh-te (李月德) and Chen Ching-tsai (陳慶財), deliberated 2015-11-04), full textOriginal URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/48718Retrieved2026-10-30Snapshot timestamp—.Official record
- Benefit payments are disbursed through the Annan District Office (安南區公所) to 12 villages (里, li), including Chengxi (城西), Chengdong (城東), Chengnan (城南), Chengbei (城北), and Chengzhong (城中) R001Source《臺南市垃圾焚化廠及掩埋場營運階段提供回饋金辦法》[Tainan City Regulations on Compensation Funds During the Operation of Refuse Incinerators and Landfills] (issued by the Tainan City Government 2012-01-02 (ROC 101-01-02), amended 2025-02-19 (ROC 114-02-19))Original URLhttps://www.tnepb.gov.tw/upload/%E8%87%BA%E5%8D%97%E5%B8%82%E5%9E%83%E5%9C%BE%E7%84%9A%E5%8C%96%E5%BB%A0%E5%8F%8A%E6%8E%A9%E5%9F%8B%E5%A0%B4%E7%87%9F%E9%81%8B%E9%9A%8E%E6%AE%B5%E6%8F%90%E4%BE%9B%E5%9B%9E%E9%A5%8B%E9%87%91%E8%BE%A6%E6%B3%95.pdfRetrieved2026-10-30Snapshot timestamp—R002Source監察院調查報告 [Control Yuan Investigation Report] 100財調0015 (investigated by Huang Huang-hsiung (黃煌雄), 2011-02-15 (ROC 100/02/15))Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/52552Retrieved2026-10-30Snapshot timestamp—.Official record
See also
- Chengxi Landfill and Incinerator⚖︎Refuse incinerator and landfill in Chengxi Village, Annan District, TainanContains 8 items
- Chengxi VillageVillage of Annan District, commonly called Gangzixi
- 1987 to present・Elected representatives and officialsHuang Wei-cheMayor of Tainan and former legislator
- Temporary Storage Zone H (the Stone Coffin Zone)A concrete tank holding contaminated soil at the Taiwan Alkali Anshun Plant
- 1987 to present・Journalists and mediaTsai Wen-chuLiberty Times reporter in Tainan
- 1987 to present・Postwar officialsChen Ching-tsaiControl Yuan member on Chengxi facilities
- History of the Chengxi Landfill and IncineratorThe year-by-year course of the Chengxi Landfill and Incinerator
- 1987 to present・Journalists and mediaHung Jung-chihChina Times reporter in Tainan
- 1987 to present・Elected representatives and officialsHuang Huang-hsiungFormer Control Yuan member
- 1987 to present・Postwar officialsHuang Jui-enEPB chief secretary who briefed the Control Yuan
- 1987 to present・Elected representatives and officialsLee Tui-chihTainan City councillor and former deputy minister of agriculture
- 1987 to present・Postwar officialsLee Yueh-teMember of the 5th Control Yuan
- 1987 to present・Postwar officialsLin Chien-sanDeputy director of the Tainan City Environmental Protection Bureau
- 1987 to present・Postwar officialsChiu Jui-chiChief of the Waste Management Section, Tainan City EPB
- 1987 to present・Postwar officialsHsu Jen-tseDirector of the Tainan City Environmental Protection Bureau
- 1987 to present・Postwar officialsChang Huang-chenFormer director of the Tainan City EPB
Reports that mention it
Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution
The Chengxi Landfill and Incinerator
Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
Hall of the Present6.2Present conditions and institutions / Industrial parks and pollution
The Taiwan Alkali Anshun Plant
A complete chronology from the plant's founding in 1938 to the site-wide verification of 2026, for Taiwan's first designated remediation site, D00001. This page also covers the two-year reversal in sediment downstream in the Luermen River, the full procedure of one inter-agency site inspection, and the Jian'an Substitute Elementary School (1947–1971).
Continue from here
- Other Institutions and SchoolsTaijiang National Park HeadquartersGovernment agency managing Taijiang National ParkContains 8 items
- Lin Chien-sanDeputy director of the Tainan City Environmental Protection Bureau
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items