Hsu Yu-jen (許又仁) is a Tainan City councilor. In a general interpellation on 2021-11-09 Hsu said the city generated about 1,300 tonnes of household waste a day, more than the Yongkang and Chengxi incinerators could fully handle, and called for evaluating a third household-waste incinerator [R001].
Activities
- 2021-11-09 In a general interpellation, said the city produced about 1,300 tonnes of household waste a day, which the Yongkang and Chengxi incinerators could no longer fully handle, and called for evaluating a third household-waste incinerator (CNS News, "Waste Crisis: Councilor Calls for Evaluating a Third Incinerator," per the video description) R001Source中嘉新聞(三冠王‧雙子星)[CNS News (Sanguanwang and Shuangzixing channels)] council-report videos and their description fields: 2021-11-09〈垃圾處理危機 議員籲評估設立第三座焚化廠〉[Waste-Treatment Crisis: Councilor Urges Assessment of a Third Incinerator], 2022-09-14〈城西掩埋場造林活化 議員籲規劃環保公園〉[Afforesting and Revitalizing the Chengxi Landfill: Councilor Urges Planning an Environmental Park], 2025-11-11〈土城人為垃圾委曲求全 郭清華爭地方建設〉[Tucheng People Swallow Their Grievances over Garbage; Kuo Ching-hua Fights for Local Development];台灣生活新聞 [Taiwan Life News] 2020-06-01〈城西焚化爐原址另闢新爐 郭清華嚴厲抗議〉[New Furnace on the Original Chengxi Incinerator Site; Kuo Ching-hua Protests Strongly]Original URLhttps://www.youtube.com/watch?v=5f8qfYq7GsARetrieved2026-10-30Snapshot timestamp—Other videos: ve_nNcl1TCY, BdKRhkbhLd8, mIBoExsU99o. This site cites the text of the video description fields; the videos have no subtitles, and no transcript has been checked. The Hsu Yu-jen passage follows the video description; the video has no subtitles and no transcript has been checked.. Secondhand account
See also
Reports that mention it
Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution
The Chengxi Landfill and Incinerator
Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
Continue from here
- Other PeopleKuo Hsin-liang⚖︎Tainan city councilor and former council speaker
- Related entriesChengxi Landfill and Incinerator⚖︎Refuse incinerator and landfill in Chengxi Village, Annan District, TainanContains 8 items
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.