Chao Ching-hui

Official recordSecondhand account
222

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Chao Ching-hui is a deputy mayor of Tainan and a former journalist who in 2023 attended the signing of the BOT contract for the new furnace at the Chengxi incinerator on the mayor's behalf.R001SourceChinese Wikipedia: 趙卿惠 [Chao Ching-hui]Original URLhttps://zh.wikipedia.org/zh-tw/%E8%B6%99%E5%8D%BF%E6%83%A0Retrieved2026-10-30Snapshot timestamp(None, or not applicable)

Category
People
Related reports
1 reports
Also known as
趙卿惠、Zhao Qinghui
Related subpages
6.1

Chao Ching-hui (趙卿惠) is a deputy mayor of Tainan City, holding a doctorate from National Sun Yat-sen University and formerly chair of the city's Research, Development and Evaluation Commission [R001][R002].

Chao Ching-hui (趙卿惠) is a deputy mayor of Tainan City. Holding a doctorate from the Institute of China and Asia-Pacific Studies at National Sun Yat-sen University, Chao Ching-hui has served as chair of the city's Research, Development and Evaluation Commission, director of its Department of Information and International Relations, and head of the Liberty Times' Tainan metropolitan news desk; at the signing of the BOT contract for the new furnace of the Chengxi incinerator on 3 February 2023, Chao Ching-hui attended on the mayor's behalf R001SourceChinese Wikipedia: 趙卿惠 [Chao Ching-hui]Original URLhttps://zh.wikipedia.org/zh-tw/%E8%B6%99%E5%8D%BF%E6%83%A0Retrieved2026-10-30Snapshot timestamp—R002Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp—CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx .. Official record

Life

  1. Education: PhD, Institute of China and Asia-Pacific Studies, National Sun Yat-sen University; MA, Graduate Institute of Political Science, Chinese Culture University R001SourceChinese Wikipedia: 趙卿惠 [Chao Ching-hui]Original URLhttps://zh.wikipedia.org/zh-tw/%E8%B6%99%E5%8D%BF%E6%83%A0Retrieved2026-10-30Snapshot timestamp—.Secondhand account
  2. Career: head of the Research, Development and Evaluation Commission and director of the Information and International Relations Office, Tainan City Government; head of the Liberty Times Tainan metropolitan news desk R001SourceChinese Wikipedia: 趙卿惠 [Chao Ching-hui]Original URLhttps://zh.wikipedia.org/zh-tw/%E8%B6%99%E5%8D%BF%E6%83%A0Retrieved2026-10-30Snapshot timestamp—.Secondhand account

Activities

  1. 2023-02-03 At the signing of the BOT contract for the new furnace at the Chengxi incinerator, Environmental Protection Bureau director Hsu Jen-tse (許仁澤) signed with Chengxi Energy chairman Chou Li-ming, and Deputy Mayor Chao Ching-hui attended on the mayor's behalf R002Source臺南市政府新聞 [Tainan City Government news]〈城西垃圾焚化廠更新爐BOT簽約 預計115年完工營運 黃偉哲盼如期完工〉[Chengxi Incinerator Replacement Furnace BOT Contract Signed, Expected to Be Completed and Operating in 2026 (ROC 115); Huang Wei-che Hopes for Completion on Schedule], 2023-02-03;中央社 [CNA]〈台南城西垃圾焚化廠更新爐新建簽約 115年營運〉[Contract Signed for New Replacement Furnace at Tainan's Chengxi Incinerator, Operating in 2026 (ROC 115)], 記者 [reporter] Chang Jung-hsiang (張榮祥)Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&s=7947980Retrieved2026-10-30Snapshot timestamp—CNA: https://www.cna.com.tw/news/ahel/202302030187.aspx ..Official record

See Chengxi Landfill and Incinerator and the Chengxi report.

See also

Reports that mention it

Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution

The Chengxi Landfill and Incinerator

Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.

26116

Continue from here

Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.