Tucheng Industrial Zone

Official recordSecondhand accountLocal oral account
1021

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

The Tucheng Industrial Zone (Ind. 8) is an urban-planning industrial zone of about 24 hectares east of the Tucheng settlement in Annan District (the Xuenan readjustment area), zoned in 1983 with works reported started in 2018, yet still a stretch of grass.R001Source環境部 [Ministry of Environment] environmental impact assessment document search system, case no. 1000011V〈台南市安南區土城工業區(工8)開發計畫環境影響說明書〉[Environmental Impact Statement for the Development Plan of the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan]: developer 凱鼎土地開發建設股份有限公司 [Kaiding Land Development and Construction Co., Ltd.], consultant 十山工程科技股份有限公司 [Shishan Engineering Technology Co., Ltd.], area 24.1682 hectares, development type 「園區之開發」 ("development of a park"); announced by the Tainan City Government on 2012-10-16 under 府環企字第1010876695B號 as conditionally approved. The conditions include: before the first application to transfer offset land (抵費地), the developer and the land readjustment association must establish an industrial zone management body and open a dedicated fund account (holding at least three years of committed environmental protection funding); tenant factories may begin operating only after the wastewater treatment facilities and sewer connection works are completed; and the zone's drainage plan must be coordinated with the flood control plan for flood-prone areasOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)Official EIA documents and announcement.

Category
Places
People involved
Tsai Ching-hoJoined the 2014 petition against discharging the industrial zone's wastewater into the Luermen River
Also known as
工8、學南重劃區、土城工業區(工8)、安南區土城工業區、工8工業區、Tucheng Industrial Zone (Ind. 8)、Xuenan Land Readjustment Area

The Tucheng Industrial Zone (土城工業區, "Ind. 8," 工8) is an urban-planning Class B industrial zone east of the Tucheng settlement in Annan District, Tainan, lying east of Anming Road, south of Taijiang Boulevard Section 5 and north of Anzhong Road Section 6, about 24 hectares in area [R005][R011].{{官方文獻}} For land readjustment it is called the Xuenan Self-Organized Urban Land Readjustment Area, after the Xuenan Section (學南段) in which it lies [R010][R011]. Zoned industrial in 1983, it had its detailed plan promulgated in 2011 and reported the start of works in 2018; according to a local resident in 2026, the site is still one stretch of grass [R009].{{在地居民口述}}

Relationship map

  • Places
  • People, shops and terms

Overview of the zone

8 itemsFirst items: Type: urban-planning industrial zone, de…Location: east of the Tucheng settlement…Names: in the urban plan it is the "Tuch…MoreLess
  1. Type: urban-planning industrial zone, designated "Ind. 8" (工8), Class B industrial zone R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.. Official record
  2. Location: east of the Tucheng settlement, close to the Tainan Technology Industrial Park (臺南科技工業區, now the Tainan Industrial Park, 台南產業園區) to the south R002Source台江國家公園管理處 [Taijiang National Park Headquarters]《台江國家公園計畫(第 1 次通盤檢討)計畫書(草案)》[Taijiang National Park Plan (First Comprehensive Review), Draft Plan] (2016-10), p. 2-20, under the subheading 「4.土城工業區(已編定未開發)」 ("4. Tucheng Industrial Zone (designated, undeveloped)"): 「土城工業區為都市計畫工業區,位於臺南市安南區台江大道與安明路交叉口,南側接近臺南市科技工業區、西側鄰土城聚落。土地面積為 24.17 公頃。土城工業區環境影響評估已於民國 101 年審查通過,目前由地主籌組土地重劃會,並經臺南市政府於民國 103 年 3 月核定成立,預計 105 年 4 月完成重劃,進行工業區開發。」 ("The Tucheng Industrial Zone is an urban-planning industrial zone located at the intersection of Taijiang Boulevard and Anming Road in Annan District, Tainan City, close to the Tainan Technology Industrial Park to the south and bordering the Tucheng settlement to the west. Its land area is 24.17 hectares. The Tucheng Industrial Zone's environmental impact assessment passed review in ROC year 101 [2012]; the landowners have since organized a land readjustment association, whose establishment was approved by the Tainan City Government in March of ROC year 103 [2014], and the readjustment is expected to be completed in April of year 105 [2016], after which the industrial zone will be developed.")Original URLhttps://web.archive.org/web/20220805054238id_/http://110web.tjnp.gov.tw/ckfinder/userfiles/files/20161014-5.pdfRetrieved2026-10-30Snapshot timestamp—Official draft plan.R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.. Official record
    1. Boundaries of the readjustment area: on the east, the eastern boundary line of planned road 2-15M; on the west, the east side of Anming Road (安明路, Provincial Highway 17); on the south, the north side of Anzhong Road (安中路); on the north, the south side of Taijiang Boulevard (台江大道) R011Source《臺南市學南自辦市地重劃區重劃計畫書》[Readjustment Plan for the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] (approved by the Tainan City Government 2013-10-07), p. 1: the readjustment area lies in the Xuenan Section (學南段), Annan District, about 24.8109 hectares in total, bounded on the east by the eastern boundary line of planned road 2-15M, on the west by the east side of 1-3-60M (Anming Road), on the south by the north side of 3-33-20M (Anzhong Road), and on the north by the south side of 2-7-80M (Taijiang Boulevard); legal basis: 「臺南市政府於中華民國 100 年 6 月 23 日府都綜字第 1000437670B 號函公告發布實施『擬定台南市安南區土城工業區(工 8)細部計畫案計畫書』」 ("the Tainan City Government by letter 府都綜字第 1000437670B 號 of 23 June ROC year 100 [2011] announced the promulgation and entry into effect of the Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City"); apart from scattered sheet-metal factories and brick buildings along Anming Road and Anzhong Road, the area is mostly farmland and fish ponds; after readjustment it would provide 17.1861 hectares of building land and 7.6248 hectares of public facility land (roads 3.8163, parks 2.1440, parkways 1.6114, pedestrian paths 0.0531 hectares)Original URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Officially approved readjustment plan, attached to the Land Administration Bureau's association page.. Official record
    2. Local resident's account: it is the large tract labeled 「學南重劃區」 or 「學南重劃工業區」 on maps, bounded by the east side of Anming Road, the south side of Taijiang Boulevard Section 5, and the north side of Anzhong Road Section 6, with the Dongxiang Taiwanese Seafood Restaurant (東香台菜海味料理) on Anzhong Road Section 6 at its southern edge R009Source本站在地口述紀錄 [This site's record of local oral accounts] (the site author's own field observation, 2026-10): the author confirmed that Ind. 8 is the large tract labeled 「學南重劃區」 (or 「學南重劃工業區」) on maps, bounded by the east side of Anming Road (Provincial Highway 17), the south side of Taijiang Boulevard Section 5, and the north side of Anzhong Road Section 6, with the Dongxiang Taiwanese Seafood Restaurant on Anzhong Road Section 6 at its southern edge; on current conditions: 「那邊現在完全一整片草,我覺得不值得標記,完全沒路可以進去,連田間小路、田埂都沒有」 ("It's now just one unbroken stretch of grass; I don't think it's worth marking. There's no road at all to get in, not even a farm path or a field ridge.")Original URL—Retrieved2026-10-30Snapshot timestamp—Local residents' oral account.. Local oral account
  3. Names: in the urban plan it is the "Tucheng Industrial Zone (Ind. 8)"; for land readjustment it is the "Xuenan Self-Organized Urban Land Readjustment Area" (學南自辦市地重劃區), because the land lies in the Xuenan Section (學南段) of Annan District R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.R011Source《臺南市學南自辦市地重劃區重劃計畫書》[Readjustment Plan for the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] (approved by the Tainan City Government 2013-10-07), p. 1: the readjustment area lies in the Xuenan Section (學南段), Annan District, about 24.8109 hectares in total, bounded on the east by the eastern boundary line of planned road 2-15M, on the west by the east side of 1-3-60M (Anming Road), on the south by the north side of 3-33-20M (Anzhong Road), and on the north by the south side of 2-7-80M (Taijiang Boulevard); legal basis: 「臺南市政府於中華民國 100 年 6 月 23 日府都綜字第 1000437670B 號函公告發布實施『擬定台南市安南區土城工業區(工 8)細部計畫案計畫書』」 ("the Tainan City Government by letter 府都綜字第 1000437670B 號 of 23 June ROC year 100 [2011] announced the promulgation and entry into effect of the Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City"); apart from scattered sheet-metal factories and brick buildings along Anming Road and Anzhong Road, the area is mostly farmland and fish ponds; after readjustment it would provide 17.1861 hectares of building land and 7.6248 hectares of public facility land (roads 3.8163, parks 2.1440, parkways 1.6114, pedestrian paths 0.0531 hectares)Original URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Officially approved readjustment plan, attached to the Land Administration Bureau's association page.. Official record
  4. Area: 24.1682 hectares (EIA documents) / 24.17 hectares (detailed plan report, national park plan) / readjustment area 24.8109 hectares (readjustment plan) R001Source環境部 [Ministry of Environment] environmental impact assessment document search system, case no. 1000011V〈台南市安南區土城工業區(工8)開發計畫環境影響說明書〉[Environmental Impact Statement for the Development Plan of the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan]: developer 凱鼎土地開發建設股份有限公司 [Kaiding Land Development and Construction Co., Ltd.], consultant 十山工程科技股份有限公司 [Shishan Engineering Technology Co., Ltd.], area 24.1682 hectares, development type 「園區之開發」 ("development of a park"); announced by the Tainan City Government on 2012-10-16 under 府環企字第1010876695B號 as conditionally approved. The conditions include: before the first application to transfer offset land (抵費地), the developer and the land readjustment association must establish an industrial zone management body and open a dedicated fund account (holding at least three years of committed environmental protection funding); tenant factories may begin operating only after the wastewater treatment facilities and sewer connection works are completed; and the zone's drainage plan must be coordinated with the flood control plan for flood-prone areasOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—Official EIA documents and announcement.R002Source台江國家公園管理處 [Taijiang National Park Headquarters]《台江國家公園計畫(第 1 次通盤檢討)計畫書(草案)》[Taijiang National Park Plan (First Comprehensive Review), Draft Plan] (2016-10), p. 2-20, under the subheading 「4.土城工業區(已編定未開發)」 ("4. Tucheng Industrial Zone (designated, undeveloped)"): 「土城工業區為都市計畫工業區,位於臺南市安南區台江大道與安明路交叉口,南側接近臺南市科技工業區、西側鄰土城聚落。土地面積為 24.17 公頃。土城工業區環境影響評估已於民國 101 年審查通過,目前由地主籌組土地重劃會,並經臺南市政府於民國 103 年 3 月核定成立,預計 105 年 4 月完成重劃,進行工業區開發。」 ("The Tucheng Industrial Zone is an urban-planning industrial zone located at the intersection of Taijiang Boulevard and Anming Road in Annan District, Tainan City, close to the Tainan Technology Industrial Park to the south and bordering the Tucheng settlement to the west. Its land area is 24.17 hectares. The Tucheng Industrial Zone's environmental impact assessment passed review in ROC year 101 [2012]; the landowners have since organized a land readjustment association, whose establishment was approved by the Tainan City Government in March of ROC year 103 [2014], and the readjustment is expected to be completed in April of year 105 [2016], after which the industrial zone will be developed.")Original URLhttps://web.archive.org/web/20220805054238id_/http://110web.tjnp.gov.tw/ckfinder/userfiles/files/20161014-5.pdfRetrieved2026-10-30Snapshot timestamp—Official draft plan.R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.R011Source《臺南市學南自辦市地重劃區重劃計畫書》[Readjustment Plan for the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] (approved by the Tainan City Government 2013-10-07), p. 1: the readjustment area lies in the Xuenan Section (學南段), Annan District, about 24.8109 hectares in total, bounded on the east by the eastern boundary line of planned road 2-15M, on the west by the east side of 1-3-60M (Anming Road), on the south by the north side of 3-33-20M (Anzhong Road), and on the north by the south side of 2-7-80M (Taijiang Boulevard); legal basis: 「臺南市政府於中華民國 100 年 6 月 23 日府都綜字第 1000437670B 號函公告發布實施『擬定台南市安南區土城工業區(工 8)細部計畫案計畫書』」 ("the Tainan City Government by letter 府都綜字第 1000437670B 號 of 23 June ROC year 100 [2011] announced the promulgation and entry into effect of the Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City"); apart from scattered sheet-metal factories and brick buildings along Anming Road and Anzhong Road, the area is mostly farmland and fish ponds; after readjustment it would provide 17.1861 hectares of building land and 7.6248 hectares of public facility land (roads 3.8163, parks 2.1440, parkways 1.6114, pedestrian paths 0.0531 hectares)Original URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Officially approved readjustment plan, attached to the Land Administration Bureau's association page.. Official record
  5. The detailed plan (plan report at the formulation stage, 2010) R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.: Official record
    1. Class B industrial zone: 16.92 hectares, 70%.
    2. Public facilities: 7.25 hectares, 30%: park land 3.05 hectares, substation land 0.53 hectares, road land 3.66 hectares.
    3. Role: a reserve area for expanding the industrial clusters and logistics support of the Tainan Technology Industrial Park.
  6. The readjustment plan (approved 2013): after readjustment, 17.1861 hectares of building land and 7.6248 hectares of public facility land (roads, parks, parkways, pedestrian paths) R011Source《臺南市學南自辦市地重劃區重劃計畫書》[Readjustment Plan for the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] (approved by the Tainan City Government 2013-10-07), p. 1: the readjustment area lies in the Xuenan Section (學南段), Annan District, about 24.8109 hectares in total, bounded on the east by the eastern boundary line of planned road 2-15M, on the west by the east side of 1-3-60M (Anming Road), on the south by the north side of 3-33-20M (Anzhong Road), and on the north by the south side of 2-7-80M (Taijiang Boulevard); legal basis: 「臺南市政府於中華民國 100 年 6 月 23 日府都綜字第 1000437670B 號函公告發布實施『擬定台南市安南區土城工業區(工 8)細部計畫案計畫書』」 ("the Tainan City Government by letter 府都綜字第 1000437670B 號 of 23 June ROC year 100 [2011] announced the promulgation and entry into effect of the Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City"); apart from scattered sheet-metal factories and brick buildings along Anming Road and Anzhong Road, the area is mostly farmland and fish ponds; after readjustment it would provide 17.1861 hectares of building land and 7.6248 hectares of public facility land (roads 3.8163, parks 2.1440, parkways 1.6114, pedestrian paths 0.0531 hectares)Original URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Officially approved readjustment plan, attached to the Land Administration Bureau's association page.. Official record
  7. Land conditions at the time of planning (2010 detailed plan report, 2013 readjustment plan) R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.R011Source《臺南市學南自辦市地重劃區重劃計畫書》[Readjustment Plan for the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] (approved by the Tainan City Government 2013-10-07), p. 1: the readjustment area lies in the Xuenan Section (學南段), Annan District, about 24.8109 hectares in total, bounded on the east by the eastern boundary line of planned road 2-15M, on the west by the east side of 1-3-60M (Anming Road), on the south by the north side of 3-33-20M (Anzhong Road), and on the north by the south side of 2-7-80M (Taijiang Boulevard); legal basis: 「臺南市政府於中華民國 100 年 6 月 23 日府都綜字第 1000437670B 號函公告發布實施『擬定台南市安南區土城工業區(工 8)細部計畫案計畫書』」 ("the Tainan City Government by letter 府都綜字第 1000437670B 號 of 23 June ROC year 100 [2011] announced the promulgation and entry into effect of the Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City"); apart from scattered sheet-metal factories and brick buildings along Anming Road and Anzhong Road, the area is mostly farmland and fish ponds; after readjustment it would provide 17.1861 hectares of building land and 7.6248 hectares of public facility land (roads 3.8163, parks 2.1440, parkways 1.6114, pedestrian paths 0.0531 hectares)Original URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Officially approved readjustment plan, attached to the Land Administration Bureau's association page.: Official record
    1. Along Anming Road and Anzhong Road there were scattered sheet-metal factories and two- to three-story brick buildings, mostly auto repair shops and stone companies.
    2. The rest was mostly farmland and fish ponds, with a few graves and a crisscross of irrigation and drainage ditches; the "Tuchengzi No. 1-2" drainage channel of the Luermen drainage system runs through the area in an underground box culvert.
    3. The detailed plan report records 291 landowners; in 2025 the readjustment association had 422 members.
  8. Development method: a self-organized urban land readjustment by an association of landowners; chair Tseng Yu-ping (曾裕評), with Pochen International Development Co., Ltd. (柏辰國際開發有限公司) as commissioned agent R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record

History

29 items1979–2026First items: 1979-10-23 The "Amendment and Expansion …1983-10-06 The "Amendment of the Tainan …1991-01-17 The "Amendment of the Tainan …MoreLess
  • 1979-10-23 The "Amendment and Expansion of the Tainan City Master Plan" brought this area into the master plan as a farming-and-fishing zone (68 南市工都字第 53210 號) R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.. Official record
  • 1983-10-06 The "Amendment of the Tainan City Master Plan (Comprehensive Review)" rezoned part of the farming-and-fishing zone as the "Ind. 8" industrial zone, in the fourth development phase, to resolve the mixing of factories and housing in Annan District (72 南市工都字第 69232 號) R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.. Official record
  • 1991-01-17 The "Amendment of the Tainan City Master Plan (Comprehensive Review of Industrial Zones)" changed Ind. 8 to a Class B industrial zone in the second development phase (80 南市工都字第 34001 號) R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.. Official record
  • 2008-08-25 In support of the Luermen drainage improvement works, the Tuchengzi No. 1-2 drainage channel within the area was rezoned as a river zone (97 南市都劃字 09700825740 號) R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.. Official record
  • 2010-04 The city government formulated the "Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City"; the plan report states that the Tucheng Industrial Zone was at that time 「尚未開發」 ("not yet developed") R005Source台南市政府 [Tainan City Government]《擬定台南市安南區土城工業區(工8)細部計畫案計畫書》[Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City] (2010-04): p. 1-1, background: 「『新吉工業區』與『土城工業區』尚未開發,其中土城工業區(工八)區位良好,鄰『南科工』北側」 ("the Xinji Industrial Zone and the Tucheng Industrial Zone have not yet been developed; of these, the Tucheng Industrial Zone (Ind. 8) is well located, adjoining the north side of the Tainan Technology Industrial Park"); the plan area lies at the intersection of planned roads 「2-7-80M」 (Taijiang Boulevard) and 「1-3-60M」 (Anming Road), with farming-and-fishing zones to the east and north, the Tainan Technology Industrial Park nearby to the south, and the Tucheng settlement to the west, about 24.17 hectares; p. 2-5, Table 2-1, urban-planning history (1979-10-23, 68 南市工都字第 53210 號, incorporated into the master plan; 1983-10-06, 72 南市工都字第 69232 號, part of the farming-and-fishing zone rezoned as the "Ind. 8" industrial zone; 1991-01-17, 80 南市工都字第 34001 號, changed to a Class B industrial zone; 2008-08-25, 97 南市都劃字 09700825740 號, the Tuchengzi No. 1-2 drainage channel within the area rezoned as a river zone); p. 3-1, existing land use; p. 3-11, 291 landowners; p. 6-3, Table 6-1, land-use plan; p. 8-1, recommends development by urban land readjustmentOriginal URLhttp://v523.tw/uploadcityplans/uploadfiles/1274930007515.pdfRetrieved2026-10-30Snapshot timestamp—A plan report from the formulation stage (the exhibition and review fields of the review summary table are blank), archived by a third-party website; the version finally promulgated may differ.. Official record
  • 2010-05-10 The city government approved the establishment of the Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area (南市地劃字第09914515230號) R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2011-06-23 The city government announced the promulgation and entry into effect of the detailed plan for the Tucheng Industrial Zone (Ind. 8) (府都綜字第1000437670B號) R011Source《臺南市學南自辦市地重劃區重劃計畫書》[Readjustment Plan for the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] (approved by the Tainan City Government 2013-10-07), p. 1: the readjustment area lies in the Xuenan Section (學南段), Annan District, about 24.8109 hectares in total, bounded on the east by the eastern boundary line of planned road 2-15M, on the west by the east side of 1-3-60M (Anming Road), on the south by the north side of 3-33-20M (Anzhong Road), and on the north by the south side of 2-7-80M (Taijiang Boulevard); legal basis: 「臺南市政府於中華民國 100 年 6 月 23 日府都綜字第 1000437670B 號函公告發布實施『擬定台南市安南區土城工業區(工 8)細部計畫案計畫書』」 ("the Tainan City Government by letter 府都綜字第 1000437670B 號 of 23 June ROC year 100 [2011] announced the promulgation and entry into effect of the Plan Report for the Formulation of the Detailed Plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City"); apart from scattered sheet-metal factories and brick buildings along Anming Road and Anzhong Road, the area is mostly farmland and fish ponds; after readjustment it would provide 17.1861 hectares of building land and 7.6248 hectares of public facility land (roads 3.8163, parks 2.1440, parkways 1.6114, pedestrian paths 0.0531 hectares)Original URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Officially approved readjustment plan, attached to the Land Administration Bureau's association page.. Official record
  • 2011-09-07 The city government approved the proposed readjustment area (府地劃字第1000640677號) R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2012-10-16 EIA conditionally approved (府環企字第1010876695B號, case no. 1000011V) R001Source環境部 [Ministry of Environment] environmental impact assessment document search system, case no. 1000011V〈台南市安南區土城工業區(工8)開發計畫環境影響說明書〉[Environmental Impact Statement for the Development Plan of the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan]: developer 凱鼎土地開發建設股份有限公司 [Kaiding Land Development and Construction Co., Ltd.], consultant 十山工程科技股份有限公司 [Shishan Engineering Technology Co., Ltd.], area 24.1682 hectares, development type 「園區之開發」 ("development of a park"); announced by the Tainan City Government on 2012-10-16 under 府環企字第1010876695B號 as conditionally approved. The conditions include: before the first application to transfer offset land (抵費地), the developer and the land readjustment association must establish an industrial zone management body and open a dedicated fund account (holding at least three years of committed environmental protection funding); tenant factories may begin operating only after the wastewater treatment facilities and sewer connection works are completed; and the zone's drainage plan must be coordinated with the flood control plan for flood-prone areasOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—Official EIA documents and announcement.. Official record
  • 2013-10-07 The city government approved the readjustment plan R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2014-03-14 The city government approved the establishment of the Xuenan readjustment association R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2014-07-01 News report: wastewater to be discharged into the Luermen River; aquaculture farmers criticize the plan R003Source環境資訊中心 [Taiwan Environmental Information Center]〈台南土城工業區排廢鹿耳門溪 養殖業痛批〉["Tainan's Tucheng Industrial Zone to Discharge Wastewater into the Luermen River; Aquaculture Sector Lashes Out"] (2014-07-01, excerpted from the 自由時報 [Liberty Times]): the EIA for the Tucheng Industrial Zone (Ind. 8), for which the landowners had applied to carry out a self-organized land readjustment, passed in October 2012, and its wastewater would be discharged into the Luermen River; fishers said the lower Luermen River is a center of aquaculture and that they had known nothing about the development; the Land Administration Bureau said the readjustment association had been approved in March of that year and the readjustment was expected to be completed in April 2016; the Environmental Protection Bureau said that an information session had been held during the review, to which the village chiefs were invited, and that the discharge standards were stricter than the national standardsOriginal URLhttps://e-info.org.tw/node/100403Retrieved2026-10-30Snapshot timestamp—Republished media report.. Secondhand account
  • 2014-07-01 The same report quotes the Land Administration Bureau's original sentence: 「目前地主已籌組成立重劃會,並經市府於今年三月核定成立,預計一○五年四月完成重劃。」 ("The landowners have now organized and established a readjustment association, which the city government approved in March this year, and the readjustment is expected to be completed in April of ROC year 105.") R012Source自由時報 [Liberty Times]〈台南土城工業區排廢鹿耳門溪 養殖業痛批〉["Tainan's Tucheng Industrial Zone to Discharge Wastewater into the Luermen River; Aquaculture Sector Lashes Out"], 2014-07-01 (reporter Tsai Wen-chu (蔡文居))Original URLhttps://news.ltn.com.tw/news/local/paper/792304Retrieved2026-11-06Snapshot timestamp—News report; the page was opened and the report date and original sentence checked. The 2016-09-02 briefing and the 2018-07-02 declaration of the start of works come from official documents of the readjustment association recorded in the same compiled file. Secondhand account
  • 2014-07-15 Local residents, environmental groups, and fishers begin a petition demanding a new EIA R004Source環境資訊中心 [Taiwan Environmental Information Center]〈台南土城工業區廢水排鹿耳門溪 環團漁民促重新環評〉["Tucheng Industrial Zone Wastewater into the Luermen River: Environmental Groups and Fishers Call for a New EIA"] (2014-07-17, excerpted from the 自由時報 [Liberty Times], 2014-07-16): local residents, environmental groups, and fishers began a petition on July 15, arguing that the project would affect more than a thousand hectares of fish ponds along the river, nearly ten thousand oyster racks, and an oyster industry worth over NT$800 million, and demanding a new EIA; Tsai Ching-ho (蔡清河), head of the Sicao oyster production and marketing group, said: 「政府要斷我們的飯碗,怎能不作聲?」 ("The government wants to smash our rice bowls; how could we keep quiet?"); the Environmental Protection Bureau explained that after three expert-panel meetings and more than a year of review, the case was approved by the EIA general assembly in 2012, and that the readjustment association had committed to stricter discharge standardsOriginal URLhttps://e-info.org.tw/node/100757Retrieved2026-10-30Snapshot timestamp—Republished media report.. Secondhand account
  • 2016-04 Originally scheduled completion of the readjustment; not completed on schedule R002Source台江國家公園管理處 [Taijiang National Park Headquarters]《台江國家公園計畫(第 1 次通盤檢討)計畫書(草案)》[Taijiang National Park Plan (First Comprehensive Review), Draft Plan] (2016-10), p. 2-20, under the subheading 「4.土城工業區(已編定未開發)」 ("4. Tucheng Industrial Zone (designated, undeveloped)"): 「土城工業區為都市計畫工業區,位於臺南市安南區台江大道與安明路交叉口,南側接近臺南市科技工業區、西側鄰土城聚落。土地面積為 24.17 公頃。土城工業區環境影響評估已於民國 101 年審查通過,目前由地主籌組土地重劃會,並經臺南市政府於民國 103 年 3 月核定成立,預計 105 年 4 月完成重劃,進行工業區開發。」 ("The Tucheng Industrial Zone is an urban-planning industrial zone located at the intersection of Taijiang Boulevard and Anming Road in Annan District, Tainan City, close to the Tainan Technology Industrial Park to the south and bordering the Tucheng settlement to the west. Its land area is 24.17 hectares. The Tucheng Industrial Zone's environmental impact assessment passed review in ROC year 101 [2012]; the landowners have since organized a land readjustment association, whose establishment was approved by the Tainan City Government in March of ROC year 103 [2014], and the readjustment is expected to be completed in April of year 105 [2016], after which the industrial zone will be developed.")Original URLhttps://web.archive.org/web/20220805054238id_/http://110web.tjnp.gov.tw/ckfinder/userfiles/files/20161014-5.pdfRetrieved2026-10-30Snapshot timestamp—Official draft plan.R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2016-09-02 A briefing on the development of the readjustment works was held (official document of the readjustment association, R012). Official record
  • 2016-10 The draft comprehensive review of the Taijiang National Park plan lists the Tucheng Industrial Zone as 「已編定未開發」 ("designated, undeveloped") R002Source台江國家公園管理處 [Taijiang National Park Headquarters]《台江國家公園計畫(第 1 次通盤檢討)計畫書(草案)》[Taijiang National Park Plan (First Comprehensive Review), Draft Plan] (2016-10), p. 2-20, under the subheading 「4.土城工業區(已編定未開發)」 ("4. Tucheng Industrial Zone (designated, undeveloped)"): 「土城工業區為都市計畫工業區,位於臺南市安南區台江大道與安明路交叉口,南側接近臺南市科技工業區、西側鄰土城聚落。土地面積為 24.17 公頃。土城工業區環境影響評估已於民國 101 年審查通過,目前由地主籌組土地重劃會,並經臺南市政府於民國 103 年 3 月核定成立,預計 105 年 4 月完成重劃,進行工業區開發。」 ("The Tucheng Industrial Zone is an urban-planning industrial zone located at the intersection of Taijiang Boulevard and Anming Road in Annan District, Tainan City, close to the Tainan Technology Industrial Park to the south and bordering the Tucheng settlement to the west. Its land area is 24.17 hectares. The Tucheng Industrial Zone's environmental impact assessment passed review in ROC year 101 [2012]; the landowners have since organized a land readjustment association, whose establishment was approved by the Tainan City Government in March of ROC year 103 [2014], and the readjustment is expected to be completed in April of year 105 [2016], after which the industrial zone will be developed.")Original URLhttps://web.archive.org/web/20220805054238id_/http://110web.tjnp.gov.tw/ckfinder/userfiles/files/20161014-5.pdfRetrieved2026-10-30Snapshot timestamp—Official draft plan.. Official record
  • 2017-10-06 The city government approved the readjustment engineering budget and drawings R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2018-07-02 The readjustment association declared the start of works R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2019-07-05 The Land Administration Bureau issued the association one warning R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2020-11-04 The Land Administration Bureau issued the association one warning R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2024-04-15 The Land Administration Bureau issued one warning 「因久未施工」 ("for prolonged failure to carry out works") R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2024-12-25 The 30-day public exhibition of the detailed plan for Ind. 9 (Conditional) to the north began (府都綜字第1132511881A號); its plan report states 「土城工業區(工8)已發布實施」 ("the Tucheng Industrial Zone (Ind. 8) has been promulgated and put into effect") R006Source臺南市政府都市發展局 [Urban Development Bureau, Tainan City Government],《擬定臺南市安南區「工9(附)」工業區細部計畫書》[Detailed Plan Report for the "Ind. 9 (Conditional)" Industrial Zone, Annan District, Tainan City] (2024-12, public exhibition version), p. 1-1: 「其中土城工業區(工8)已發布實施,與本計畫皆位「臺南科技工業區」北側,未來不僅能提供鄰近工業區擴充產業聚落規模及後勤供給之角色,也能配合國土計畫指導,作為未登記工廠遷廠儲備基地」 ("of these, the Tucheng Industrial Zone (Ind. 8) has been promulgated and put into effect; it and this plan both lie north of the Tainan Technology Industrial Park, and in future they can not only serve to expand the industrial clusters of neighboring industrial zones and supply logistics support, but also, in line with the national land plan, serve as a reserve site for relocating unregistered factories")Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTc5NzYvODcxMjU4OC9hOWFlOTEzYy01M2RjLTQxMWEtOGI1OS1lNjJkMTg5ZDFhYjEucGRm&n=MTIwNC3lronljZflt6U557Sw6YOo6KiI55Wr6I2J5qGIRijmlrnmoYgyMClBIC5wZGY%3dRetrieved2026-10-30Snapshot timestamp—Official plan report.R007Source臺南市政府都市發展局 [Urban Development Bureau, Tainan City Government] announcement, 府都綜字第1132511881A號 (2024-12-24): 「擬定臺南市安南區「工9(附)」工業區細部計畫案」 [Formulation of the Detailed Plan for the "Ind. 9 (Conditional)" Industrial Zone, Annan District, Tainan City] to be placed on public exhibition for 30 days from 2024-12-25, with a briefing session at 3 p.m. on Wednesday, 2025-01-15, at the Xuedong Village Activity Center (學東里活動中心, 661 Gongxue 6th Road), Annan DistrictOriginal URLhttps://udweb.tainan.gov.tw/News_Content.aspx?n=17102&s=8712588Retrieved2026-10-30Snapshot timestamp—Official announcement.. Official record
  • 2025-01-15 Public exhibition briefing session for Ind. 9 (Conditional) held at the Xuedong Village Activity Center, Annan District R007Source臺南市政府都市發展局 [Urban Development Bureau, Tainan City Government] announcement, 府都綜字第1132511881A號 (2024-12-24): 「擬定臺南市安南區「工9(附)」工業區細部計畫案」 [Formulation of the Detailed Plan for the "Ind. 9 (Conditional)" Industrial Zone, Annan District, Tainan City] to be placed on public exhibition for 30 days from 2024-12-25, with a briefing session at 3 p.m. on Wednesday, 2025-01-15, at the Xuedong Village Activity Center (學東里活動中心, 661 Gongxue 6th Road), Annan DistrictOriginal URLhttps://udweb.tainan.gov.tw/News_Content.aspx?n=17102&s=8712588Retrieved2026-10-30Snapshot timestamp—Official announcement.. Official record
  • 2025-01-30 City government press release: the detailed plan for Ind. 8 has been promulgated, and it and Ind. 9 (Conditional) both lie north of the Tainan Industrial Park R008Source臺南市政府 [Tainan City Government] press release (issued by the Urban Development Bureau, 2025-01-30)〈安南區『工9』工業區擬定細部計畫案啟動,挹注產業發展新動能〉["Detailed Plan for Annan District's 'Ind. 9' Industrial Zone Launched, Adding New Momentum to Industrial Development"]: the "Ind. 9 (Conditional)" zone lies in northern Annan District on two sites on the east and west sides of Provincial Highway 17 (Anming Road Section 4), bordering Guoxing Bridge and Qigu District to the north, about 10.21 hectares; 「其中擬定臺南市安南區土城工業區(工8)細部計畫案已發布實施,與本計畫皆位於「台南產業園區」(原科工區)北側」 ("of these, the detailed plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City, has been promulgated and put into effect; it and this plan both lie north of the Tainan Industrial Park (formerly the Technology Industrial Park)"); about 7.18 hectares are planned as Class B industrial zone and irrigation facilities zone, and about 3.03 hectares as public facilitiesOriginal URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&sms=9748&s=8719280Retrieved2026-10-30Snapshot timestamp—Official press release.. Official record
  • 2025-08-15 The Xuenan readjustment association held its third general meeting of members at the Chengbei Village (城北里) Activity Center and dismissed several directors and supervisors R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2026-07 The Land Administration Bureau records construction progress of 24%; the association plans to replace the design and supervision contractor and re-elect directors R010Source臺南市政府地政局 [Land Administration Bureau, Tainan City Government], progress page 〈臺南市第131期學南自辦市地重劃區重劃會〉[Land Readjustment Association of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City No. 131]: established 103-03-14 [2014-03-14]; chair Tseng Yu-ping (曾裕評); directors Hsu Chih-cheng (許志成), Chen Min-chen (陳敏真), Sun Yung-chi (孫永吉), Liao Chien-sheng (廖健勝), Wu Chih-hsiang (吳志祥), and Hsu Shu-cheng (徐書政); supervisor Li Ming-hsiu (李明修); commissioned agent 柏辰國際開發有限公司 [Pochen International Development Co., Ltd.]; history: 099-05-10 preparatory committee approved, 100-09-07 proposed readjustment area approved, 102-10-07 readjustment plan approved, 103-03-14 association approved, 106-10-06 engineering budget and drawings approved, 106-12-18 supervision plan filed, 107-07-02 commencement of works declared; one warning each on 108-07-05 and 109-11-04, and 「因久未施工113年4月15日警告1次」 ("one warning on 15 April ROC year 113 [2024] for prolonged failure to carry out works"); completion status 「重劃地價估價報告書送審中」 ("readjustment land-price appraisal report under review"); works 「115年7月施工進度24%」 ("construction progress 24% as of July ROC year 115 [2026]"); current status 「目前預計更換設計監造廠商及改選理事」 ("currently planning to replace the design and supervision contractor and re-elect directors"). Attachments include Tainan City Government letter 南市地劃字第09914515230號 of 99-05-10 [2010-05-10] (approving the establishment of the 「台南市學南自辦市地重劃區籌備會」 [Preparatory Committee of the Xuenan Self-Organized Urban Land Readjustment Area, Tainan City] and noting that 「本市安南區土城工業區(工8)刻正辦理擬定細部計畫案」 ["the detailed plan for this city's Tucheng Industrial Zone (Ind. 8), Annan District, is currently being formulated"]), letter 府地劃字第1000640677號 of 100-09-07 [2011-09-07], and the minutes of the third general meeting of members (114-08-15 [2025-08-15], Chengbei Village Activity Center): 422 members, total area about 248,107.65 square meters; several directors and supervisors were dismissedOriginal URLhttps://land.tainan.gov.tw/News_Content.aspx?n=29688&s=7811433Retrieved2026-10-30Snapshot timestamp—Official readjustment progress page and attached official documents.. Official record
  • 2026-10 What a local resident saw on the ground: 「那邊現在完全一整片草,我覺得不值得標記,完全沒路可以進去,連田間小路、田埂都沒有。」 ("It's now just one unbroken stretch of grass; I don't think it's worth marking. There's no road at all to get in, not even a farm path or a field ridge.") R009Source本站在地口述紀錄 [This site's record of local oral accounts] (the site author's own field observation, 2026-10): the author confirmed that Ind. 8 is the large tract labeled 「學南重劃區」 (or 「學南重劃工業區」) on maps, bounded by the east side of Anming Road (Provincial Highway 17), the south side of Taijiang Boulevard Section 5, and the north side of Anzhong Road Section 6, with the Dongxiang Taiwanese Seafood Restaurant on Anzhong Road Section 6 at its southern edge; on current conditions: 「那邊現在完全一整片草,我覺得不值得標記,完全沒路可以進去,連田間小路、田埂都沒有」 ("It's now just one unbroken stretch of grass; I don't think it's worth marking. There's no road at all to get in, not even a farm path or a field ridge.")Original URL—Retrieved2026-10-30Snapshot timestamp—Local residents' oral account.. Local oral account
  • 2026-10 Set against the 24% recorded by the Land Administration Bureau, a local resident's view: 「重劃區進度 24%,我覺得進度 0% 吧,完全沒動啊」 ("The readjustment area is at 24%? I'd say 0%; nothing has moved at all"). The author points to Google Street View from June 2018: looking along a concrete path inside the area, there are scallion fields on the left and fishponds on the right, with only a small work shed; 「上面隨便一條灰路都完全沒動靜,這要說要開發真的太牽強了」 ("Not one of the grey roads on the map shows any sign of work; calling this a development is really a stretch") R009Source本站在地口述紀錄 [This site's record of local oral accounts] (the site author's own field observation, 2026-10): the author confirmed that Ind. 8 is the large tract labeled 「學南重劃區」 (or 「學南重劃工業區」) on maps, bounded by the east side of Anming Road (Provincial Highway 17), the south side of Taijiang Boulevard Section 5, and the north side of Anzhong Road Section 6, with the Dongxiang Taiwanese Seafood Restaurant on Anzhong Road Section 6 at its southern edge; on current conditions: 「那邊現在完全一整片草,我覺得不值得標記,完全沒路可以進去,連田間小路、田埂都沒有」 ("It's now just one unbroken stretch of grass; I don't think it's worth marking. There's no road at all to get in, not even a farm path or a field ridge.")Original URL—Retrieved2026-10-30Snapshot timestamp—Local residents' oral account.. Local oral account

Environmental assessment and controversy

4 itemsFirst items: A development project named after Tuchen…EIA conditions (announced in 2012) :The Luermen River (鹿耳門溪) drainage disput…MoreLess
  1. A development project named after Tucheng in the EIA documents: the developer is Kaiding Land Development and Construction Co., Ltd. (凱鼎土地開發建設股份有限公司), and the consultant is Shishan Engineering Technology Co., Ltd. (十山工程科技股份有限公司) R001Source環境部 [Ministry of Environment] environmental impact assessment document search system, case no. 1000011V〈台南市安南區土城工業區(工8)開發計畫環境影響說明書〉[Environmental Impact Statement for the Development Plan of the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan]: developer 凱鼎土地開發建設股份有限公司 [Kaiding Land Development and Construction Co., Ltd.], consultant 十山工程科技股份有限公司 [Shishan Engineering Technology Co., Ltd.], area 24.1682 hectares, development type 「園區之開發」 ("development of a park"); announced by the Tainan City Government on 2012-10-16 under 府環企字第1010876695B號 as conditionally approved. The conditions include: before the first application to transfer offset land (抵費地), the developer and the land readjustment association must establish an industrial zone management body and open a dedicated fund account (holding at least three years of committed environmental protection funding); tenant factories may begin operating only after the wastewater treatment facilities and sewer connection works are completed; and the zone's drainage plan must be coordinated with the flood control plan for flood-prone areasOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—Official EIA documents and announcement..
  2. EIA conditions (announced in 2012) R001Source環境部 [Ministry of Environment] environmental impact assessment document search system, case no. 1000011V〈台南市安南區土城工業區(工8)開發計畫環境影響說明書〉[Environmental Impact Statement for the Development Plan of the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan]: developer 凱鼎土地開發建設股份有限公司 [Kaiding Land Development and Construction Co., Ltd.], consultant 十山工程科技股份有限公司 [Shishan Engineering Technology Co., Ltd.], area 24.1682 hectares, development type 「園區之開發」 ("development of a park"); announced by the Tainan City Government on 2012-10-16 under 府環企字第1010876695B號 as conditionally approved. The conditions include: before the first application to transfer offset land (抵費地), the developer and the land readjustment association must establish an industrial zone management body and open a dedicated fund account (holding at least three years of committed environmental protection funding); tenant factories may begin operating only after the wastewater treatment facilities and sewer connection works are completed; and the zone's drainage plan must be coordinated with the flood control plan for flood-prone areasOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—Official EIA documents and announcement.:
    1. Before the first application to transfer offset land, the developer and the readjustment association must establish an industrial zone management body and open a dedicated fund account holding at least three years of committed environmental protection funding.
    2. Factories may move in and begin operating only after the wastewater treatment facilities and sewer connection works are completed.
    3. The drainage plan must be coordinated with the flood control plan for flood-prone areas.
  3. The Luermen River (鹿耳門溪) drainage dispute (July 2014) R003Source環境資訊中心 [Taiwan Environmental Information Center]〈台南土城工業區排廢鹿耳門溪 養殖業痛批〉["Tainan's Tucheng Industrial Zone to Discharge Wastewater into the Luermen River; Aquaculture Sector Lashes Out"] (2014-07-01, excerpted from the 自由時報 [Liberty Times]): the EIA for the Tucheng Industrial Zone (Ind. 8), for which the landowners had applied to carry out a self-organized land readjustment, passed in October 2012, and its wastewater would be discharged into the Luermen River; fishers said the lower Luermen River is a center of aquaculture and that they had known nothing about the development; the Land Administration Bureau said the readjustment association had been approved in March of that year and the readjustment was expected to be completed in April 2016; the Environmental Protection Bureau said that an information session had been held during the review, to which the village chiefs were invited, and that the discharge standards were stricter than the national standardsOriginal URLhttps://e-info.org.tw/node/100403Retrieved2026-10-30Snapshot timestamp—Republished media report.R004Source環境資訊中心 [Taiwan Environmental Information Center]〈台南土城工業區廢水排鹿耳門溪 環團漁民促重新環評〉["Tucheng Industrial Zone Wastewater into the Luermen River: Environmental Groups and Fishers Call for a New EIA"] (2014-07-17, excerpted from the 自由時報 [Liberty Times], 2014-07-16): local residents, environmental groups, and fishers began a petition on July 15, arguing that the project would affect more than a thousand hectares of fish ponds along the river, nearly ten thousand oyster racks, and an oyster industry worth over NT$800 million, and demanding a new EIA; Tsai Ching-ho (蔡清河), head of the Sicao oyster production and marketing group, said: 「政府要斷我們的飯碗,怎能不作聲?」 ("The government wants to smash our rice bowls; how could we keep quiet?"); the Environmental Protection Bureau explained that after three expert-panel meetings and more than a year of review, the case was approved by the EIA general assembly in 2012, and that the readjustment association had committed to stricter discharge standardsOriginal URLhttps://e-info.org.tw/node/100757Retrieved2026-10-30Snapshot timestamp—Republished media report.:
    1. The fishers' account: the lower Luermen River is a center of aquaculture, and oyster farming, eel-fry catching, and fish-pond water supply all depend on it; the fishers had known nothing about the industrial zone planned upstream.
    2. The petition: from July 15, local residents, environmental groups, and fishers circulated a petition, arguing that the project would affect more than a thousand hectares of fish ponds along the river, nearly ten thousand oyster racks, and an oyster industry worth over NT$800 million, and demanding a new EIA; Tsai Ching-ho (蔡清河), head of the Sicao (四草) oyster production and marketing group, said: 「政府要斷我們的飯碗,怎能不作聲?」 ("The government wants to smash our rice bowls; how could we keep quiet?")
    3. The city government's account: the Environmental Protection Bureau said the case had gone through three expert-panel meetings and more than a year of review, and that village chiefs had been invited to an information session during the review; the discharge standards were stricter than the national standards, and the readjustment association had also committed to tightening them; residents who still had concerns could raise them with the Economic Development Bureau or the Land Administration Bureau.
  4. "Ind. 9 (Conditional)" (工9(附)) to the north: another urban-planning industrial zone, placed on public exhibition by the city government at the end of 2024, on both sides of Anming Road Section 4 and bordering Guoxing Bridge (國姓橋) to the north, about 10.21 hectares; the city government says that it and Ind. 8 both lie north of the Tainan Industrial Park R007Source臺南市政府都市發展局 [Urban Development Bureau, Tainan City Government] announcement, 府都綜字第1132511881A號 (2024-12-24): 「擬定臺南市安南區「工9(附)」工業區細部計畫案」 [Formulation of the Detailed Plan for the "Ind. 9 (Conditional)" Industrial Zone, Annan District, Tainan City] to be placed on public exhibition for 30 days from 2024-12-25, with a briefing session at 3 p.m. on Wednesday, 2025-01-15, at the Xuedong Village Activity Center (學東里活動中心, 661 Gongxue 6th Road), Annan DistrictOriginal URLhttps://udweb.tainan.gov.tw/News_Content.aspx?n=17102&s=8712588Retrieved2026-10-30Snapshot timestamp—Official announcement.R008Source臺南市政府 [Tainan City Government] press release (issued by the Urban Development Bureau, 2025-01-30)〈安南區『工9』工業區擬定細部計畫案啟動,挹注產業發展新動能〉["Detailed Plan for Annan District's 'Ind. 9' Industrial Zone Launched, Adding New Momentum to Industrial Development"]: the "Ind. 9 (Conditional)" zone lies in northern Annan District on two sites on the east and west sides of Provincial Highway 17 (Anming Road Section 4), bordering Guoxing Bridge and Qigu District to the north, about 10.21 hectares; 「其中擬定臺南市安南區土城工業區(工8)細部計畫案已發布實施,與本計畫皆位於「台南產業園區」(原科工區)北側」 ("of these, the detailed plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City, has been promulgated and put into effect; it and this plan both lie north of the Tainan Industrial Park (formerly the Technology Industrial Park)"); about 7.18 hectares are planned as Class B industrial zone and irrigation facilities zone, and about 3.03 hectares as public facilitiesOriginal URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&sms=9748&s=8719280Retrieved2026-10-30Snapshot timestamp—Official press release..

Records in academic theses

  1. Liu Sui-hsuan's (劉穗萱) 2014 master's thesis lists the Tucheng Industrial Zone together with the Heshun, Zongtouliao and Xinji industrial zones as "livelihood industry bases" (「民生產業基地」) of Annan District, corresponding to Chengbei Village (城北里) and Chengdong Village (城東里) R013SourceLiu Sui-hsuan (劉穗萱),《都市邊緣區空間型態演變之研究-以台南市安南區為例》[A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City],國立成功大學都市計劃學系碩士論文 [master's thesis, Department of Urban Planning, National Cheng Kung University],2014,pp. 47, 75, 77–80Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City (都市邊緣區空間型態演變之研究-以台南市安南區為例)》p. 47、75、77–80.
  2. The thesis classifies Chengbei and Chengdong villages as "potential industrialization areas" (「工業化潛在區」): major plans already exist, but the built-up area and population have not yet developed greatly R013SourceLiu Sui-hsuan (劉穗萱),《都市邊緣區空間型態演變之研究-以台南市安南區為例》[A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City],國立成功大學都市計劃學系碩士論文 [master's thesis, Department of Urban Planning, National Cheng Kung University],2014,pp. 47, 75, 77–80Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City (都市邊緣區空間型態演變之研究-以台南市安南區為例)》p. 47、75、77–80.

See also

Continue from here