Relationship map
Timeline
First items: 201120162017MoreLess
- 2011
- 07-14 Report: wind farms planned on the salt fields, opposed in Jiangjun (將軍) and Qigu R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 2016
- 10-27 The Executive Yuan (行政院) approved the solar photovoltaic promotion program, with a target of 20 GW cumulative by ROC year 114 (2025) R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—.Official record
- 2017
- 09-21 The Council of Agriculture (農委會) issued announcement 農企字第1060013304號, renaming it 「嚴重地層下陷地區內不利農業經營得設置綠能設施之農業用地範圍」 ("Scope of Agricultural Land Within Areas of Severe Land Subsidence, Unfavorable to Agricultural Operation, on Which Green Energy Facilities May Be Installed") and adding 20 areas totaling 1,130 hectares. Tainan had 7 areas listed (in Yanshui, Xuejia and Beimen), including area no. 34, 20 hectares of the Sanliaowan subsection of the Xidiliao section in Beimen, with the extent defined as 「以北門區蘆竹溝社區以南、台61線以西、將軍溪出海口以東地區」 ("the area south of the Luzhugou community in Beimen District, west of Provincial Highway 61, and east of the mouth of the Jiangjun River") R003Source行政院農業委員會公告 [Council of Agriculture, Executive Yuan, announcement] 農企字第1060013304號〈嚴重地層下陷地區內不利農業經營得設置綠能設施之農業用地範圍〉["Scope of Agricultural Land Within Areas of Severe Land Subsidence, Unfavorable to Agricultural Operation, on Which Green Energy Facilities May Be Installed"],2017-09-21Original URLhttps://www.moa.gov.tw/theme_data.php?theme=publication&id=3329Retrieved2026-10-30Snapshot timestamp—.Official record
- 12-04 Report: solar in Qigu; Taipower creates a new tourist attraction R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 2018
- 03-19 Report: as the solar industry moves in, land rents in Qigu rise tenfold R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 05-21 The Council of Agriculture issued an order establishing the "Operating Principles for Fishery–Solar Co-location Pilot Projects" R005Source行政院公報 [Executive Yuan Gazette]:第 024 卷第 093 期 [vol. 24, no. 93](2018-05-21 漁電共生試驗專案計畫作業原則)[(2018-05-21, Operating Principles for Fishery–Solar Co-location Pilot Projects)]、第 028 卷第 230 期 [vol. 28, no. 230](2022-12-02 七股區可優先推動漁業經營結合綠能之區位範圍)[(2022-12-02, areas in Qigu District where combining fishery operations with green energy may be prioritized)]、第 029 卷第 182 期 [vol. 29, no. 182](2023-09-25 廢止作業原則)[(2023-09-25, repeal of the operating principles)]Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
- 07-09 Report: solar companies scramble to lease fish ponds, and Qigu fishers fear losing their jobs; residents petitioned that it was 「漁電競爭,非漁電共生」 ("fishery–solar competition, not fishery–solar coexistence") R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 2019
- 03-11 Report: Qigu fishers demanded that fish ponds west of Provincial Highway 61 be excluded R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 05 Chung Hsin Electric's (中興電工) bid service proposal estimated the timber volume of the trees on Taisugar's Qigu Farm at 30,581 cubic meters R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—.Official record
- 05-16 Mayor Huang Wei-che (黃偉哲) stated that fishery–solar co-location 「須經地主、漁民同意」 ("must have the consent of landowners and fishers") R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 05-16 Report: landowners terminate leases, and fish farmers face a crisis of survival R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 11-12 The China Appraisal Center carried out an on-site survey, finding a timber volume of 5,506 cubic meters; Taisugar did not send staff to attend as required by the contract R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—.Official record
- 2020
- 04-10 Taipower's Tainan Jiangjun–Qigu solar farm (150 MW) connected 40 MW to the grid ahead of schedule for trial operation, with full grid connection expected by the end of August and annual generation of 200 million kWh R006Source台灣電力公司新聞稿 [Taiwan Power Company press release],〈台電台南太陽光電場150MW創全台最大! 今提前併網40MW試運轉〉["Taipower's 150 MW Tainan Solar Farm Is Taiwan's Largest! 40 MW Connected to the Grid Ahead of Schedule Today for Trial Operation"],2020-04-10Original URLhttps://www.taipower.com.tw/2289/2323/2324/7472/Retrieved2026-10-30Snapshot timestamp—.Official record
- 04-20 Version 1.0 of the environmental and social review was released R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 07-07 Council of Agriculture Minister Chen Chi-chung (陳吉仲) announced that changes of use would not be approved for farmland under 2 hectares (popularly nicknamed the "July 7 Incident," 七七事變) R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- 07-28 Before the new rule took effect, developers filed 103 "Xiao Erjia" sites in Qigu in the names of the "Five Tian Companies" (五天公司): Tianying Energy (天英能源), Tianzhu Energy (天柱能源), Tianxin Smart Green Energy (天心智慧綠能), Tianren Energy (天任能源) and Tianrui Energy (天芮能源) R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—R008Source臺灣臺南地方法院 [Taiwan Tainan District Court] 113年度訴字第349號刑事裁定(參與沒收程序)[criminal ruling, case 113年度訴字第349號 (third-party confiscation proceedings)],2026-03-20(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/TNDM,115,%E8%81%B7%E5%8F%83,1,20260320,1_de6ca2ddc76a0f712747d2ffe42dca985baa5744Retrieved2026-10-30Snapshot timestamp—.Official record
- 08-01 Point 7-1 of the Guidelines for Changing the Use of Agricultural Land took effect R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- 08-12 The Taisugar Qigu sites of the Chung Hsin Electric group obtained construction permits: Tianpeng Energy's (天篷能源) 「天篷第一期(第一階段)」 ("Tianpeng Phase 1 (Stage 1)") (Shuzijiao section, Qigu District; land area 797,182 square meters; 67,852.8 kW), Tianchong Energy's (天衝能源) 「天衝(第一階段)」 ("Tianchong (Stage 1)") (Qigu section, Qigu District; 824,015 square meters; 94,488 kW), and Tianqin Energy's (天禽能源) 「天禽第一期」 ("Tianqin Phase 1") (367,919.29 square meters; 20,906.4 kW); Tianpeng Phase 1, Stage 2 (Sanhe section, Qigu District) obtained its permit on 12-28 R009Source經濟部能源署 [Energy Administration, MOEA],再生能源發電設備施工許可清冊(109–111 年度)[register of construction permits for renewable energy generating equipment (ROC years 109–111, i.e. 2020–2022)]Original URLhttps://www.moeaea.gov.tw/ECW/populace/content/wHandMenuFile.ashx?file_id=14159Retrieved2026-10-30Snapshot timestamp—.Official record
- 09-14 All 150 MW of Taipower's Tainan salt-field solar farm connected to the grid R010Source環境資訊中心 [Taiwan Environmental Information Center](記者 [reporter] Sun Wen-lin (孫文臨)),台電台南鹽田光電場啟用報導 [report on the opening of Taipower's Tainan salt-field solar farm],2021-04-06(臺中市低碳城市網轉載)[(reposted on the Taichung City Low-Carbon City website)]Original URLhttps://lowcarbon.taichung.gov.tw/page/news/show.aspx?num=273Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 11-16 The Ministry of Economic Affairs (經濟部) and the Council of Agriculture, under 經能字第10904605750號 and 農漁字第1091223634號, announced the 「嘉義縣及臺南市可優先推動漁業經營結合綠能之區位範圍」 ("Areas in Chiayi County and Tainan City Where Combining Fishery Operations with Green Energy May Be Prioritized") (the first batch of fishery–solar co-location priority areas), totaling 2,626.29 hectares: 876.16 hectares in Dongshi, Budai and Yizhu in Chiayi County, and 1,750.13 hectares in parts of Yanshui, Xuejia, Xiaying, Madou, Anding, Xinshi and Annan Districts in Tainan City R011Source行政院公報 [Executive Yuan Gazette],經濟部、行政院農業委員會公告 [joint announcement of the Ministry of Economic Affairs and the Council of Agriculture, Executive Yuan]〈嘉義縣及臺南市可優先推動漁業經營結合綠能之區位範圍〉["Areas in Chiayi County and Tainan City Where Combining Fishery Operations with Green Energy May Be Prioritized"](經能字第10904605750號、農漁字第1091223634號),2020-11-16Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg026218/ch04/type3/gov31/num14/Eg.htmRetrieved2026-10-30Snapshot timestamp—R012Source環境資訊中心 [Taiwan Environmental Information Center],〈全國魚塭劃「漁電共生先行區」 首波公告嘉義、台南2626公頃 環社檢核過第一關〉["Fish Ponds Nationwide Zoned as 'Fishery–Solar Co-location Priority Areas'; First Batch of 2,626 Hectares in Chiayi and Tainan Announced After Passing the First Environmental and Social Review"](記者 [reporter] Hsu Tsu-ling (許祖菱)),2020-11-19Original URLhttps://e-info.org.tw/node/228071Retrieved2026-10-30Snapshot timestamp—.Official record
- 2021
- 02-02 Tianchong Phase 1 (Stage 2) obtained a construction permit (Qigu section) R009Source經濟部能源署 [Energy Administration, MOEA],再生能源發電設備施工許可清冊(109–111 年度)[register of construction permits for renewable energy generating equipment (ROC years 109–111, i.e. 2020–2022)]Original URLhttps://www.moeaea.gov.tw/ECW/populace/content/wHandMenuFile.ashx?file_id=14159Retrieved2026-10-30Snapshot timestamp—.Official record
- 02-05 Through arrangements by a city government adviser, the developers met Mayor Huang Wei-che and Economic Development Bureau Director Chen Kai-ling (陳凱凌); from 03-09 the Economic Development Bureau switched to a joint review system R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- 03-31 Opening of Taipower's Tainan salt-field solar farm: 214 hectares of abandoned salt flats in Qigu and Jiangjun, 150 MW, built at a cost of NT$9.65 billion on land leased from the National Property Administration, with 40,000 precast concrete piles, panels raised 2.1 meters, and 15 MW of storage. Attendees included Premier Su Tseng-chang (蘇貞昌), Minister of Economic Affairs Wang Mei-hua (王美花), Minister of Finance Su Chien-jung (蘇建榮), Tainan Mayor Huang Wei-che, Bureau of Energy Director-General Yu Chen-wei (游振偉) and Taipower Chairman Yang Wei-fu (楊偉甫) R010Source環境資訊中心 [Taiwan Environmental Information Center](記者 [reporter] Sun Wen-lin (孫文臨)),台電台南鹽田光電場啟用報導 [report on the opening of Taipower's Tainan salt-field solar farm],2021-04-06(臺中市低碳城市網轉載)[(reposted on the Taichung City Low-Carbon City website)]Original URLhttps://lowcarbon.taichung.gov.tw/page/news/show.aspx?num=273Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 04 Mayor Huang Wei-che attended a launch event in Annan District for Xiangyi'an Energy Technology's (翔億安能源科技) indoor aquaculture facility combined with rooftop solar: the facility covers about 1.6 hectares, the rooftop solar about 3 MW, with estimated annual generation of 3.85 million kWh; the person in charge is Yang Hsien-cheng (楊憲政) R013Source業者網站(surmount.com.tw)轉貼報導(署名邱家琳)[news report reposted on a company website (surmount.com.tw), bylined Chiu Chia-lin (邱家琳)],翔億安能源科技安南區室內養殖場結合太陽光電成果發表會 [launch event for Xiangyi'an Energy Technology's indoor aquaculture facility combined with solar photovoltaics in Annan District],2021-04-23Original URLhttps://www.surmount.com.tw/news-detail.php?id=131Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 06-16 Announcement of the areas in Xuejia District, Tainan City, where combining fishery operations with green energy may be prioritized, 358.16 hectares R014Source農業部農村發展及水土保持署農村規劃組 [Ministry of Agriculture, Agency of Rural Development and Soil and Water Conservation, Rural Planning Division],〈農業綠能法規及近期函釋說明〉簡報 [presentation, "Explanation of Agricultural Green Energy Regulations and Recent Interpretive Letters"],2024-07,頁 20 [p. 20]Original URLhttps://isdistorages.blob.core.windows.net/materials/240711-0902_11307-%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD%E6%B3%95%E8%A6%8F%E5%8F%8A%E8%BF%91%E6%9C%9F%E5%87%BD%E9%87%8B%E8%AA%AA%E6%98%8E(%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD).pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- 06-24 The 67.85 MW southern site of Chung Hsin Electric's Taisugar Qigu solar project was connected to the grid that day, with the 113.16 MW northern site expected to connect on 06-30, for a total of 216 MW; Chung Hsin Electric Chairman Chiang Yi-fu (江義福) R015Source工商時報 [Commercial Times](記者 [reporter] Shen Mei-hsing (沈美幸)),中興電台糖七股光電南案場併聯報導 [report on grid connection of the southern site of Chung Hsin Electric's Taisugar Qigu solar project],2021-06-24(經濟部能源署再生能源資訊網轉載)[(reposted on the MOEA Energy Administration's renewable energy information website)]Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 06 The grid connection of the Taisugar Qigu Farm site was postponed to this month R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—.Official record
- 08-04 Yabisi Solar Co., Ltd. (雅比斯光電股份有限公司) applied to the Tainan City Government to install ground-mounted solar of 58.22 hectares and 76.517 MW installed capacity, using a water-surface method, on water-use land leased by tender from the National Property Administration (國有財產署) around Dachaogou on the Xinsheng section (新生段) of Qigu District (as stated in the city government's letter 府經能字第1101066383號 of 08-31 replying to the council); the same letter also records that Xinping Energy Development (新平能源開發) planned 90 hectares and 111 MW of indoor-aquaculture rooftop fishery–solar co-location on the Kouliao (口寮) and Shanzijiao (山子腳) sections of Jiangjun District and the Keliao (蚵寮) section of Beimen District R016Source臺南市政府函 [Tainan City Government letter](府經能字第1101066383號,2021-08-31)復臺南市議會 [in reply to the Tainan City Council],雅比斯光電七股大潮溝案與新平能源將軍北門案 [on the Yabisi Solar Dachaogou case in Qigu and the Xinping Energy case in Jiangjun and Beimen](議會議事附件 [council meeting attachment])Original URLhttps://bill.tncc.gov.tw/NoPaperMeeting_TNCC/Upload/OutlineItemFile/4db4a77b-0b3d-498f-9435-83dccce33d5c.pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- 10-14 A Bureau of Energy meeting decided that land-use consent forms dated before 2020-07-31 would count as the 「第 3 種態樣」 ("third category") R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- 11-02 Xingwei Power's (星崴電力) 「星崴七股太陽光電發電業」 ("Xingwei Qigu Solar Power Generation Business") obtained a construction permit (Taiqu section, Qigu District; 558,527.98 square meters; 77,523.6 kW; reissued 2022-01-13) R009Source經濟部能源署 [Energy Administration, MOEA],再生能源發電設備施工許可清冊(109–111 年度)[register of construction permits for renewable energy generating equipment (ROC years 109–111, i.e. 2020–2022)]Original URLhttps://www.moeaea.gov.tw/ECW/populace/content/wHandMenuFile.ashx?file_id=14159Retrieved2026-10-30Snapshot timestamp—.Official record
- 2022
- 06-01 Consultation meeting on the environmental and social review of fishery–solar co-location in Qigu District R017Source公視《我們的島》[Our Island] 光電與七股相關集數 [episodes on solar power and Qigu]Original URLhttps://ourisland.pts.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 05-26, 06-16 Yabisi Solar applied for the "Yabisi Qigu Solar Power Plant" (雅比斯七股太陽光電發電廠), on 7 parcels of state-owned land with a total installed capacity of 98.89 MW (the area and capacity differ from the 2021 application; see "Differing accounts") R018Source最高行政法院 [Supreme Administrative Court] 113 年度上字第 479 號判決 [Judgment 113-Shang No. 479](雅比斯光電對臺南市政府,廢止許可 [Yabisi Solar v. Tainan City Government, revocation of approval]),2026-01-15Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPAA,113,%E4%B8%8A,479,20260115,1Retrieved2026-10-30Snapshot timestamp—Mirror: https://lawplayer.com/judgment/TPAA,113,%E4%B8%8A,479,20260115,1_0f1428d62c06d7d0532a366e37ab91f2420e0ce2.Official record
- 07-11 Conclusion of a Bureau of Energy consultation meeting: a consent form submitted by either the previous or the subsequent landowner would count as valid R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- 08-31 The Tainan City Government, in letter 府經能字第1110998678號, gave approval in principle to the Yabisi project, subject to conditions arising from the environmental and social review R018Source最高行政法院 [Supreme Administrative Court] 113 年度上字第 479 號判決 [Judgment 113-Shang No. 479](雅比斯光電對臺南市政府,廢止許可 [Yabisi Solar v. Tainan City Government, revocation of approval]),2026-01-15Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPAA,113,%E4%B8%8A,479,20260115,1Retrieved2026-10-30Snapshot timestamp—Mirror: https://lawplayer.com/judgment/TPAA,113,%E4%B8%8A,479,20260115,1_0f1428d62c06d7d0532a366e37ab91f2420e0ce2.Official record
- 09-07 The Control Yuan deliberated investigation report 111財調0034 (announced 09-13): Hexun No. 1 (禾迅一號) set up a solar farm on 23 parcels including the Sanliaowan subsection of the Xidiliao (溪底寮) section at Luzhugou (蘆竹溝), Beimen District, obtained an electricity business preparation permit in 2019-02 and completed and commissioned it in 2021-08, holding 4 briefing sessions along the way; the Control Yuan found that 「業者相關說明仍未臻周延詳盡,難謂妥適」 ("the developer's explanations were still not thorough or detailed enough and can hardly be considered appropriate") R019Source監察院調查報告 [Control Yuan investigation report] 111財調0034(北門蘆竹溝禾迅一號光電場 [Hexun No. 1 solar farm at Luzhugou, Beimen];2022-09-07 審議、09-13 公告 [deliberated 2022-09-07, announced 09-13])Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28027Retrieved2026-10-30Snapshot timestamp—.Official record
- 09-12, 09-13 Young people from Qigu formed an alliance, calling on the city government to cap the total amount of solar R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 10-07 Report: a hundred hectares of sea fields at Dachaogou (大潮溝) face a solar crisis R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 10-12 Citing 「地方民眾發起抗爭」 ("protests launched by local residents"), the Tainan City Government asked the Energy Administration to return the Yabisi application first; the Ministry of Economic Affairs returned it on 10-18 R018Source最高行政法院 [Supreme Administrative Court] 113 年度上字第 479 號判決 [Judgment 113-Shang No. 479](雅比斯光電對臺南市政府,廢止許可 [Yabisi Solar v. Tainan City Government, revocation of approval]),2026-01-15Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPAA,113,%E4%B8%8A,479,20260115,1Retrieved2026-10-30Snapshot timestamp—Mirror: https://lawplayer.com/judgment/TPAA,113,%E4%B8%8A,479,20260115,1_0f1428d62c06d7d0532a366e37ab91f2420e0ce2.Official record
- 10-27 The Save Qigu Alliance (搶救七股大地聯盟) was founded; Chen Chi-chung said at the Legislative Yuan that he would 「一定站在青蛙裝那邊」 ("definitely stand on the side of the frog suits," i.e. the fishers in their chest waders) R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 11-03 The Save Qigu Alliance (composed of more than 20 groups, including the Qigu District Village Chiefs' Association, the Qigu Coastal Land Resources Protection Association, the Qigu Youth Alliance for Solar Oversight, and the Qigu Residents' Self-Help Association) called about 200 people to go north and petition in front of the Office of the President and the Executive Yuan, demanding a cap on total solar development R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu.R020Source環境資訊中心 [Taiwan Environmental Information Center],〈七股一成土地將蓋光電民怨搶地 經濟部承諾設總量管制〉["Solar to Cover a Tenth of Qigu's Land as Residents Protest Land Grabs; Ministry of Economic Affairs Pledges a Total Cap"] (Lee Su-chun (李蘇竣), 2022-11-04) and 8 other articles (9 in all)Original URLhttps://e-info.org.tw/node/235393Retrieved2026-11-06Snapshot timestamp—News reports (each article opened and read: China Times, NOWnews, Liberty Times, PTS, Taiwan Environmental Information Center, and others, 9 articles)..Secondhand account Wording in the reports: China Times, NOWnews, and the Liberty Times say the alliance 「號召」 or 「發起」 (called or launched) the trip; Legislators Kuo Kuo-wen and Hung Shen-han (洪申翰) convened the joint public hearing at the Legislative Yuan that afternoon, and the Liberty Times says the hearing was chaired by Council of Agriculture Deputy Minister Chen Tien-shou, a Vice Minister of Economic Affairs, and others; at the hearing, Vice Minister of Economic Affairs Tseng Wen-sheng (曾文生) said that the Ministry has no plan to promote solar facilities in the area west of Provincial Highway 61 and that the earlier "Dachaogou case" (大潮溝案) application had been returned. In a check of 9 reports, wording such as 「郭國文帶隊」 ("led by Kuo Kuo-wen") or 「黃仙立率隊」 ("led by Huang Hsien-li") was not found R020Source環境資訊中心 [Taiwan Environmental Information Center],〈七股一成土地將蓋光電民怨搶地 經濟部承諾設總量管制〉["Solar to Cover a Tenth of Qigu's Land as Residents Protest Land Grabs; Ministry of Economic Affairs Pledges a Total Cap"] (Lee Su-chun (李蘇竣), 2022-11-04) and 8 other articles (9 in all)Original URLhttps://e-info.org.tw/node/235393Retrieved2026-11-06Snapshot timestamp—News reports (each article opened and read: China Times, NOWnews, Liberty Times, PTS, Taiwan Environmental Information Center, and others, 9 articles)..Secondhand account
- 11 The Reporter (報導者) visited Qigu: Shen Hsuan-yu (沈軒宇), a member of the Qigu Youth Alliance for Solar Oversight (七股監督光電青年聯盟), said that 1,148 hectares of solar sites had been registered in Qigu, about one tenth of the district, with another 1,000-plus hectares already consolidated by developers; Sangu (三股) village chief Huang Hsien-li (黃仙立) relayed residents' complaints that construction closed off roads: 「有人回家才要出門,門口就被封住」 ("someone gets home and is about to go out again, and their doorway has been sealed off") R021Source報導者 [The Reporter],〈當光電包圍漁村:七股漁電共生風波再起,居民在抗議什麼?〉["When Solar Surrounds a Fishing Village: The Qigu Fishery–Solar Controversy Flares Again. What Are Residents Protesting?"](文字林雨佑 [text by Lin Yu-yu (林雨佑)]),2022-11-10Original URLhttps://www.twreporter.org/a/qigu-fishery-electricity-symbiosisRetrieved2026-10-30Snapshot timestamp—Share of land: The Reporter in 2022 relayed Shen Hsuan-yu as saying that 1,148 hectares of solar sites had been registered in Qigu, about one tenth of the district..Secondhand account
- 11-04 The Ministry of Economic Affairs pledged a cap on total solar development in Qigu, with no solar anywhere west of Provincial Highway 61 (台61線) R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 12-02 The Ministry of Economic Affairs and the Council of Agriculture announced the areas in Qigu District where combining fishery operations with green energy may be prioritized (another account gives 12-01 and 236.94 hectares; see "Differing accounts") R005Source行政院公報 [Executive Yuan Gazette]:第 024 卷第 093 期 [vol. 24, no. 93](2018-05-21 漁電共生試驗專案計畫作業原則)[(2018-05-21, Operating Principles for Fishery–Solar Co-location Pilot Projects)]、第 028 卷第 230 期 [vol. 28, no. 230](2022-12-02 七股區可優先推動漁業經營結合綠能之區位範圍)[(2022-12-02, areas in Qigu District where combining fishery operations with green energy may be prioritized)]、第 029 卷第 182 期 [vol. 29, no. 182](2023-09-25 廢止作業原則)[(2023-09-25, repeal of the operating principles)]Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—R014Source農業部農村發展及水土保持署農村規劃組 [Ministry of Agriculture, Agency of Rural Development and Soil and Water Conservation, Rural Planning Division],〈農業綠能法規及近期函釋說明〉簡報 [presentation, "Explanation of Agricultural Green Energy Regulations and Recent Interpretive Letters"],2024-07,頁 20 [p. 20]Original URLhttps://isdistorages.blob.core.windows.net/materials/240711-0902_11307-%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD%E6%B3%95%E8%A6%8F%E5%8F%8A%E8%BF%91%E6%9C%9F%E5%87%BD%E9%87%8B%E8%AA%AA%E6%98%8E(%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD).pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- 12-15 The Tainan City Government, in letter 府經能字第1111622807號, revoked its letter of approval for the Yabisi project; the original administrative decision states that the site 「位於七股大潮溝,主要區域位於台61以西……現況多為設置蚵棚使用面積達90公頃以上,且當地居民極力反對設置太陽能光電」 ("is located at Dachaogou in Qigu, with its main area west of Provincial Highway 61 … currently mostly used for oyster racks over an area of more than 90 hectares, and local residents strongly oppose the installation of solar photovoltaics") R018Source最高行政法院 [Supreme Administrative Court] 113 年度上字第 479 號判決 [Judgment 113-Shang No. 479](雅比斯光電對臺南市政府,廢止許可 [Yabisi Solar v. Tainan City Government, revocation of approval]),2026-01-15Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPAA,113,%E4%B8%8A,479,20260115,1Retrieved2026-10-30Snapshot timestamp—Mirror: https://lawplayer.com/judgment/TPAA,113,%E4%B8%8A,479,20260115,1_0f1428d62c06d7d0532a366e37ab91f2420e0ce2.Official record
- 12-21 Announcement under 經能字第11104605080號 and 農漁字第1110728710號 adding priority areas of 173.26 hectares in Jiangjun District and Madou District, Tainan City R022Source行政院公報 [Executive Yuan Gazette],經濟部、農委會公告新增臺南市將軍區及麻豆區可優先推動漁業經營結合綠能之區位範圍 [joint announcement of the MOEA and the Council of Agriculture adding areas in Jiangjun District and Madou District, Tainan City, where combining fishery operations with green energy may be prioritized](經能字第11104605080號、農漁字第1110728710號),2022-12-21Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg028243/ch04/type3/gov31/num15/Eg.pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- 12-22 The mayor of Tainan stated that during his term he would 「絕不再審議臺61線以西之太陽能光電案」 ("absolutely not review any further solar photovoltaic cases west of Provincial Highway 61") (as recorded in Kaohsiung District Court judgment 113年度訴字第217號, a dispute over the deposit for a 250-hectare solar development on the Xinsheng section of Qigu District; plaintiff Yinglü Investment and Development Co., Ltd. (穎律投資開發有限公司, representative Chou Chen-ying 周宸穎), defendant Shifu Energy Co., Ltd. (始復能源股份有限公司, representative Joseph Michael Lara); on 2024-07-31 the operative part read 「原告之訴駁回。」 ("The plaintiff's action is dismissed.")) R023Source臺灣高雄地方法院 [Taiwan Kaohsiung District Court] 113年度訴字第217號民事判決 [civil judgment, case 113年度訴字第217號](債務人異議之訴,七股區新生段光電開發定金)[(debtor's action of objection; deposit for solar development on the Xinsheng land section, Qigu District)],2024-07-31(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/KSDV,113,%E8%A8%B4,217,20240731,1_5fc211ed6ecdb3d3b01ca49576861bc605363448Retrieved2026-10-30Snapshot timestamp—.Official record
- 2023
- 06-07 The Control Yuan approved corrective measure 112財正0007 proposed by Lin Wen-cheng (林文程) and Wang Yu-ling (王幼玲) (announced 06-14), censuring Taisugar for converting afforested land on its Qigu Farm to solar use in support of the solar program, for imprecise estimation of timber volume and felling, and for poor contract management R024Source監察院 [Control Yuan],糾正案文 [corrective measure] 112財正0007(林文程、王幼玲提案;2023-06-07 審議、06-14 公告)[(proposed by Lin Wen-cheng (林文程) and Wang Yu-ling (王幼玲); deliberated 2023-06-07, announced 06-14)]:台灣糖業公司配合太陽光電計畫將七股農場造林地改作光電用地 [Taiwan Sugar Corporation converted afforested land on its Qigu Farm to solar use in support of the solar photovoltaic program]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=134&s=28317Retrieved2026-10-30Snapshot timestamp—.Official record
- 06-07 Investigation report 112財調0019 of the same day states: 「林木公告贈與期間僅 7 日、公開標售之等標期亦僅 4 日」 ("the period for the public notice of the gift of the trees was only 7 days, and the tender period for the public sale was only 4 days"); 146 hectares of lowland afforestation had to be deregistered and more than NT$52.64 million in afforestation compensation returned; the city government imposed 12 fines totaling NT$1.68 million R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—.Official record
- 06-08 In his general interpellation, Councilor Chiu Chao-sheng (邱昭勝) asked whether the mayor still stood by his promise that there would be no solar west of Provincial Highway 61 during his term; Huang Wei-che answered 「這個承諾不變」 ("this promise has not changed") and said 「太陽能光電是綠色能源,本身無罪,更不是黑金」 ("solar photovoltaics is green energy; it is not guilty in itself, and still less is it black gold") R025Source臺南市議會議員快訊 [Tainan City Council, Councilor News Flash],〈議員邱昭勝市政總質詢-市長強調光電無罪 藉此牟不法利益的政商才是黑金〉["Councilor Chiu Chao-sheng's (邱昭勝) General Interpellation: Mayor Stresses Solar Power Is Not the Crime; the Politicians and Businesspeople Who Profit Illegally from It Are the Real Black Gold"],2023-06-08Original URLhttps://www.tncc.gov.tw/page.asp?mainid=8DB14D98-EF2D-4B15-8501-A5B4DB264123Retrieved2026-10-30Snapshot timestamp—.Official record
- 07-30 Hsiao Fu-jen (蕭富仁), deputy director of the Tainan City Economic Development Bureau, explained: 「民國112年7月30日正式停止受理兩公頃以下的太陽光電申請案。」 ("On July 30, ROC year 112 [2023], we formally stopped accepting solar photovoltaic applications for plots under two hectares.") (interviewed 2024-01-04) R026Source公視新聞網 [PTS News Network](陳奐宇、陳顯坤 [Chen Huan-yu (陳奐宇), Chen Hsien-kun (陳顯坤)]),〈七股開發光電農地魚塭破碎化 萬人連署反對不當種電〉["Solar Development Fragments Qigu's Farmland and Fish Ponds; Ten Thousand Sign Petition Against Improper Solar"],2024-01-04Original URLhttps://news.pts.org.tw/article/674801Retrieved2026-10-30Snapshot timestamp—Share of land: PTS in 2024 wrote that Qigu is about "1萬1公頃" ("10,001 hectares", sic), and that according to Economic Development Bureau statistics solar sites take up a little over 10%..Secondhand account
- 09-25 The Ministry of Agriculture (農業部) repealed the operating principles for fishery–solar co-location pilot projects R005Source行政院公報 [Executive Yuan Gazette]:第 024 卷第 093 期 [vol. 24, no. 93](2018-05-21 漁電共生試驗專案計畫作業原則)[(2018-05-21, Operating Principles for Fishery–Solar Co-location Pilot Projects)]、第 028 卷第 230 期 [vol. 28, no. 230](2022-12-02 七股區可優先推動漁業經營結合綠能之區位範圍)[(2022-12-02, areas in Qigu District where combining fishery operations with green energy may be prioritized)]、第 029 卷第 182 期 [vol. 29, no. 182](2023-09-25 廢止作業原則)[(2023-09-25, repeal of the operating principles)]Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
- 11-14 The Control Yuan approved the impeachment of Chen Kai-ling proposed by Tsai Chung-yi (蔡崇義), Lin Kuo-ming (林國明) and Wang Li-chen (王麗珍) (a separate case, for corruption); the press release states that the Tainan District Court, in case 112年度訴字第374號, sentenced Chen Kai-ling on 5 counts to a combined 8 years' imprisonment and 5 years' deprivation of civil rights R027Source監察院新聞稿 [Control Yuan press release],蔡崇義、林國明、王麗珍提案彈劾臺南市經發局前局長陳凱凌 [Tsai Chung-yi (蔡崇義), Lin Kuo-ming (林國明) and Wang Li-chen (王麗珍) propose the impeachment of Chen Kai-ling, former director of the Tainan City Economic Development Bureau],2023-11-15Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=27323Retrieved2026-10-30Snapshot timestamp—.Official record
- 11-24 Legislative candidate Chen Kun-ho (陳昆和), together with Qigu village chiefs Huang Hsien-li, Chen Chung-cheng (陳中正) and Huang Chin-shih (黃進士), Qigu residents' self-help association head Huang Yen-kuo (黃嚴國) and others, launched a ten-thousand-signature petition, 「反不當種電救七股」 ("Oppose Improper Solar, Save Qigu"), and scheduled a 「七股人反種電大團結宣示活動」 ("Qigu People United Against Solar Declaration Rally") at the Longshan Temple (龍山宮) in Qigu on 11-26; the report relays Chen Kun-ho as saying that Qigu has the largest total amount of solar in the country and that locals firmly oppose solar west of Provincial Highway 61. The same report relays Legislator Kuo Kuo-wen (郭國文) as saying that the Dachaogou solar project was withdrawn entirely within 3 months of his intervention R028SourceNOWnews(記者張振興 [reporter Chang Chen-hsing (張振興)]),〈陳昆和與七股里長宣布發起「反不當種電救七股」萬人聯署活動〉["Chen Kun-ho and Qigu Village Chiefs Announce a Ten-Thousand-Signature Petition, 'Oppose Improper Solar, Save Qigu'"],2023-11-24Original URLhttps://www.nownews.com/news/6308025Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 2024
- 01-04 Qigu village chiefs and the residents' self-help association brought the petition to the Tainan City Government; the report says that 「短短1個多月,連署人數達到11,505人」 ("in just over a month, the number of signatories reached 11,505") R026Source公視新聞網 [PTS News Network](陳奐宇、陳顯坤 [Chen Huan-yu (陳奐宇), Chen Hsien-kun (陳顯坤)]),〈七股開發光電農地魚塭破碎化 萬人連署反對不當種電〉["Solar Development Fragments Qigu's Farmland and Fish Ponds; Ten Thousand Sign Petition Against Improper Solar"],2024-01-04Original URLhttps://news.pts.org.tw/article/674801Retrieved2026-10-30Snapshot timestamp—Share of land: PTS in 2024 wrote that Qigu is about "1萬1公頃" ("10,001 hectares", sic), and that according to Economic Development Bureau statistics solar sites take up a little over 10%..Secondhand account
- 01-09 Report: solar on 30% of Qigu's area, making it the nation's 「最大苦主」 ("biggest victim") R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 01-31 Second instance in Chen Kai-ling's separate case (fraud, excessive loans and money laundering in the name of the Qigu Technology Industrial Zone, 七股科技工業區): the Taiwan High Court Tainan Branch (臺南高分院), in 112 年度上訴字第 1571 號 (112-Shang-Su No. 1571), set aside the original combined sentence and fixed a new combined sentence of 6 years and 5 months' imprisonment and 5 years' deprivation of civil rights, and reversed the conviction for unexplained sources of assets to an acquittal R029Source臺灣高等法院臺南分院 [Taiwan High Court Tainan Branch] 112 年度上訴字第 1571 號刑事判決 [Criminal Judgment, 112-Shang-Su No. 1571](陳凱凌另案 [separate case of Chen Kai-ling (陳凱凌)]),2024-01-31(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/TNHM,112,%E4%B8%8A%E8%A8%B4,1571,20240131,1Retrieved2026-10-30Snapshot timestamp—.Official record Whether the judgment is final: Unverified.Unverified
- 04-25 Report: the Chinese Wild Bird Federation suggested that a decline in black-faced spoonbill numbers is related to fishery–solar co-location R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- 04-26 The Tainan District Prosecutors Office indicted 15 defendants in the Xiao Erjia case under 112年度偵字第17457、21785、26421、30667、35599號 and 113年度偵字第7197、7198號 (consolidated with 113年度偵字第18829號) R008Source臺灣臺南地方法院 [Taiwan Tainan District Court] 113年度訴字第349號刑事裁定(參與沒收程序)[criminal ruling, case 113年度訴字第349號 (third-party confiscation proceedings)],2026-03-20(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/TNDM,115,%E8%81%B7%E5%8F%83,1,20260320,1_de6ca2ddc76a0f712747d2ffe42dca985baa5744Retrieved2026-10-30Snapshot timestamp—.Official record The press release states: Chen Kai-ling and 3 other public servants of the Economic Development Bureau, together with Bureau of Energy division director Lin Wen-hsin, were charged with conferring unlawful benefits under Article 6, Paragraph 1, Subparagraph 4 of the Anti-Corruption Act (貪污治罪條例), and 10 people of the Liyang group were indicted as non-public-servant accomplices; investigators conducted 6 rounds of searches at 68 locations, seized 550 notarized contracts and NT$37.8 million in cash, and questioned people 246 times R030Source臺灣臺南地方檢察署新聞稿 [Taiwan Tainan District Prosecutors Office press release],〈南檢偵辦轄內太陽光電業者力 O 集團與公務員共謀圖利等案提起公訴〉["Tainan Prosecutors Indict Solar Developer Li-O Group and Public Servants for Conspiring to Confer Unlawful Benefits"](發稿人襄閱主任檢察官蔡宗聖 [issued by Assisting Chief Prosecutor Tsai Tsung-sheng (蔡宗聖)]),2024-04-26Original URLhttps://www.tnc.moj.gov.tw/media/357057/1130426%E5%8D%97%E6%AA%A2%E5%81%B5%E8%BE%A6%E5%8A%9Bo%E9%9B%86%E5%9C%98%E5%A4%AA%E9%99%BD%E5%85%89%E9%9B%BB%E6%A1%88%E5%81%B5%E6%9F%A5%E7%B5%82%E7%B5%90%E4%B8%A6%E6%8F%90%E8%B5%B7%E5%85%AC%E8%A8%B4%E6%96%B0%E8%81%9E%E7%A8%BF.pdf?mediaDL=trueRetrieved2026-10-30Snapshot timestamp—.Official record News reports state: the illicit benefits, such as the fees Liyang (力暘) saved by evading review, came to about NT$8.3 million, and prosecutors separately applied for confiscation of NT$9,126.01 million-plus in expected electricity sales revenue over 20 years R031Source環境資訊中心 [Taiwan Environmental Information Center],〈規避「小二甲」光電禁令不法利益估91億 前台南市經發局長等15人遭起訴〉["Illegal Gains from Evading the 'Xiao Erjia' Solar Ban Estimated at NT$9.1 Billion; Former Tainan Economic Development Bureau Director and 14 Others Indicted"](記者 [reporter] Lee Su-chun (李蘇竣)),2024-04-30Original URLhttps://www.e-info.org.tw/node/238999Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 07-01 Press release of the MOEA Energy Administration (經濟部能源署): none of Liyang's Qigu sites had obtained an electricity business license or had any electricity sales revenue, and Taipower had been instructed by letter not to pay for any electricity purchases until a court judgment confirmed their legality and they obtained an electricity business license (spokesperson: Deputy Director-General of the Energy Administration Lee Chun-li (李君禮)) R032Source經濟部新聞 [MOEA news],〈力暘七股案件已與地方政府合作調查 釐清疑慮前一塊錢都不會給〉["The Liyang Qigu Case Is Being Investigated Together with the Local Government; Not a Single Dollar Will Be Paid Until the Doubts Are Cleared"],2024-07-01Original URLhttps://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=115296Retrieved2026-10-30Snapshot timestamp—.Official record
- 10-22 The Tainan District Prosecutors Office searched 32 locations including Taiyen Green Energy; on 10-23 it applied to the court to detain 5 people, including a former chairman surnamed Chen, a former general manager surnamed Su and a former deputy general manager surnamed Kuo (on suspicion of special breach of trust under the Securities and Exchange Act and of Article 214 of the Criminal Code) R033Source臺灣臺南地方檢察署新聞稿 [Taiwan Tainan District Prosecutors Office press release],〈搜索某國營事業綠能公司等 32 處〉["Search of 32 Locations Including a Green Energy Company of a State-Owned Enterprise"](發稿人襄閱主任檢察官 [issued by Assisting Chief Prosecutor] Tsai Tsung-sheng (蔡宗聖)),2024-10-23Original URLhttps://www.tnc.moj.gov.tw/297028/297162/297166/1223750/Retrieved2026-10-30Snapshot timestamp—.Official record
- 11-06 The Tainan District Court, in 113 年度聲羈更二字第 6 號 (113-Sheng-Ji-Geng-Er No. 6), ordered the detention incommunicado of the defendants surnamed Tai and Kuo in the Taiyen Green Energy case (Tai Yu-chien and Kuo Cheng-wei); the press release also states 「本案陳姓共犯現經通緝在案」 ("the accomplice surnamed Chen in this case is currently wanted") R034Source司法院司法新聞 [Judicial Yuan judicial news],〈臺灣臺南地方法院113年度聲羈更二字第6號戴姓被告等二人違反證券交易法等案件新聞稿〉["Taiwan Tainan District Court Press Release on Case 113-Sheng-Ji-Geng-Er No. 6, Two Defendants Including One Surnamed Tai, for Violations of the Securities and Exchange Act and Other Offenses"],2024-11-06Original URLhttps://www.judicial.gov.tw/tw/cp-1888-1194629-8b223-1.htmlRetrieved2026-10-30Snapshot timestamp—R035Source天地傳媒 [Tiandi Media](記者林夢龍 [reporter Lin Meng-lung (林夢龍)])轉載臺灣臺南地方法院 114 年度金重訴字第 2 號裁定說明與臺灣臺南地方檢察署臺鹽綠能案起訴新聞稿 [reprint of the Taiwan Tainan District Court's explanation of its ruling in 114-Jin-Chong-Su No. 2 and the Taiwan Tainan District Prosecutors Office press release on the Taiyen Green Energy indictment],2025-02-27Original URLhttps://www.tdns.net.tw/news_view.php?new_sn=76910Retrieved2026-10-30Snapshot timestamp—.Official record
- 11-25 Chen Chi-yu turned himself in, and the Tainan District Court ordered his detention R036Source三立新聞網 [SET News],〈涉台鹽綠能光電弊案 南院裁定陳啓昱「1200萬交保」〉["Implicated in Taiyen Green Energy Solar Scandal, Chen Chi-yu Released on 'NT$12 Million Bail' by Tainan District Court"],2026-01-26Original URLhttps://www.setn.com/news/1786698Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 11-25 The documentary "Revelations of the Qigu Solar Project" (《七股光電啟示錄》) won the Chi Po-lin Award R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 2025
- 02-20 The Control Yuan approved impeachment no. 114年劾字第1號 proposed by Lin Wen-cheng, Pasuya Poiconx (浦忠成) and Chao Yung-ching (趙永清): the impeached were Yu Chen-wei (Director-General of the Energy Administration), Lin Wen-hsin (林文信) (former division director) and Chen Kai-ling (former director of the Tainan City Economic Development Bureau), referred to the Disciplinary Court; reviewing member Kao Yung-cheng (高涌誠) attached his reasons for finding the case against Yu Chen-wei 「決定不成立」 ("not established") R037Source監察院新聞稿 [Control Yuan press release],〈林文程、浦忠成、趙永清提案彈劾游振偉、林文信、陳凱凌〉["Lin Wen-cheng, Pasuya Poiconx (浦忠成) and Chao Yung-ching (趙永清) Propose the Impeachment of Yu Chen-wei (游振偉), Lin Wen-hsin (林文信) and Chen Kai-ling (陳凱凌)"](114年劾字第1號)[(impeachment no. 114年劾字第1號)],2025-02-26Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=640&s=32628Retrieved2026-10-30Snapshot timestamp—.Official record
- 02-26 The Control Yuan issued a press release on the above impeachment R037Source監察院新聞稿 [Control Yuan press release],〈林文程、浦忠成、趙永清提案彈劾游振偉、林文信、陳凱凌〉["Lin Wen-cheng, Pasuya Poiconx (浦忠成) and Chao Yung-ching (趙永清) Propose the Impeachment of Yu Chen-wei (游振偉), Lin Wen-hsin (林文信) and Chen Kai-ling (陳凱凌)"](114年劾字第1號)[(impeachment no. 114年劾字第1號)],2025-02-26Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=640&s=32628Retrieved2026-10-30Snapshot timestamp—.Official record
- 02-27 The Tainan District Prosecutors Office indicted 5 people in the Taiyen Green Energy case: Chen Chi-yu (陳啟昱) (sentence sought: 12 years), Su Kun-huang (蘇坤煌) (sentence sought: 10 years), Kuo Cheng-wei (郭政瑋), Su Chun-jen (蘇俊仁) (head of Honghui International, 鴻暉國際) and Tai Yu-chien (戴妤倩) (head of Chaoyang Development, 晁暘開發, and Weicheng Development, 偉珵開發). The indictment calculates the loss in two ways: NT$390 million-plus based on service fees already paid, or NT$860 million-plus based on the total contract value; Chen Chi-yu profited by NT$58 million-plus and Su Kun-huang by NT$74.61 million R038Source中華日報 [China Daily News],臺鹽綠能案起訴 5 人報導 [report on the indictment of 5 people in the Taiyen Green Energy case],2025-02-27Original URLhttps://www.cdns.com.tw/articles/1175314Retrieved2026-10-30Snapshot timestamp—.Secondhand account The full text of the prosecutors' press release further states: 58 locations searched, 8 defendants detained at various times, people summoned 217 times, and an indictment of 544 pages; the loss based on service fees already paid is calculated as NT$396,363,486 R035Source天地傳媒 [Tiandi Media](記者林夢龍 [reporter Lin Meng-lung (林夢龍)])轉載臺灣臺南地方法院 114 年度金重訴字第 2 號裁定說明與臺灣臺南地方檢察署臺鹽綠能案起訴新聞稿 [reprint of the Taiwan Tainan District Court's explanation of its ruling in 114-Jin-Chong-Su No. 2 and the Taiwan Tainan District Prosecutors Office press release on the Taiyen Green Energy indictment],2025-02-27Original URLhttps://www.tdns.net.tw/news_view.php?new_sn=76910Retrieved2026-10-30Snapshot timestamp—.Secondhand account On the same day the Tainan District Court, in 114 年度金重訴字第 2 號 (114-Jin-Chong-Su No. 2), ordered Chen Chi-yu, Su Kun-huang and Su Chun-jen detained incommunicado, and released Tai Yu-chien and Kuo Cheng-wei on bail of NT$3 million each R035Source天地傳媒 [Tiandi Media](記者林夢龍 [reporter Lin Meng-lung (林夢龍)])轉載臺灣臺南地方法院 114 年度金重訴字第 2 號裁定說明與臺灣臺南地方檢察署臺鹽綠能案起訴新聞稿 [reprint of the Taiwan Tainan District Court's explanation of its ruling in 114-Jin-Chong-Su No. 2 and the Taiwan Tainan District Prosecutors Office press release on the Taiyen Green Energy indictment],2025-02-27Original URLhttps://www.tdns.net.tw/news_view.php?new_sn=76910Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 03-05 The Control Yuan approved corrective measure 114財正0003 proposed by Lin Wen-cheng, Pasuya Poiconx and Chao Yung-ching, censuring the MOEA Energy Administration and the Tainan City Government: by fixing review criteria for 3 categories at meetings, they had circumvented the Xiao Erjia ban, and the city government did not announce until 2023-03-30 that all applications filed after 2023-07-31 would be rejected R039Source監察院糾正案 [Control Yuan corrective measure] 114財正0003(林文程、浦忠成、趙永清提案,糾正經濟部能源署與臺南市政府 [proposed by Lin Wen-cheng, Pasuya Poiconx and Chao Yung-ching, censuring the MOEA Energy Administration and the Tainan City Government]),2025-03-05Original URLhttps://www.cy.gov.tw/CyBsBox.aspx?n=134&CSN=2&page=7&PageSize=20Retrieved2026-10-30Snapshot timestamp—.Official record
- 03-05 The Control Yuan deliberated investigation report 114財調0012: the proportion of applications filed with backdated documents was 「高達 96.15%」 ("as high as 96.15%"), covering 124 sites and 92.8 MW, with expected generation revenue of NT$9.1 billion-plus over 20 years R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- 05-01 The Disciplinary Court ruled to suspend proceedings in impeachment case 114年劾字第1號 (Yu Chen-wei, Lin Wen-hsin, Chen Kai-ling) pending the criminal judgment R040Source監察院 [Control Yuan],〈監察院彈劾案件懲戒法院裁定停止審理一覽表〉["List of Control Yuan Impeachment Cases in Which the Disciplinary Court Has Ruled to Suspend Proceedings"](115 年 9 月 30 日版 [version of 2026-09-30 (ROC year 115)],項次 6:114 年劾字第 1 號 [item 6: impeachment 114-He No. 1])Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/77205Retrieved2026-10-30Snapshot timestamp—.Official record
- From 07-06 Typhoon Danas (丹娜絲颱風): roads and power in Qigu and Beimen were cut for 7 days, and the dike of the Qigu sandbar was breached R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 07-09 The Control Yuan investigated former Taiyen Green Energy Chairman Chen Chi-yu for asset-stripping and breach of trust R041Source監察院調查 [Control Yuan investigations]:114司調0019(2025-07-09,臺鹽綠能前董事長陳啟昱案)[(2025-07-09, the case of Chen Chi-yu (陳啟昱), former chairman of Taiyen Green Energy)]、115財調0026(2026-07-23,丹娜絲颱風光電災損)[(2026-07-23, solar installations damaged by Typhoon Danas)]、111財調0034(2022-09-07,北門蘆竹溝光電場)[(2022-09-07, the Luzhugou solar farm in Beimen)]Original URLhttps://www.cy.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
- 10-08 The Control Yuan deliberated investigation report 114財調0035 by Chi Hui-jung (紀惠容), Tien Chiu-chin (田秋堇) and Fan Sun-lu (范巽綠) (announced 10-20); the report uses Taipower's Qigu salt-field solar farm as an example in discussing the payment of electricity cooperation funds directly to the Qigu District Office R042Source監察院調查報告 [Control Yuan investigation report] 114財調0035(紀惠容、田秋堇、范巽綠調查太陽能光電外商負責人控訴綠能政策案;2025-10-08 審議、10-20 公告)[(Chi Hui-jung (紀惠容), Tien Chiu-chin (田秋堇) and Fan Sun-lu (范巽綠) investigating complaints about green energy policy by the head of a foreign solar company; deliberated 2025-10-08, announced 10-20)]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49317Retrieved2026-10-30Snapshot timestamp—.Official record The press release also states: fishery–solar co-location had reached a cumulative 997.2 MW by the end of 2024 (ROC year 113), about 23% of the target; in 2023 (ROC year 112) fewer than one in ten fishery–solar co-location sites in Tainan City passed aquaculture inspections; and from 2021 to 2024 (ROC years 110–113) there were 71 cases of obstructing green energy, with 114 people indicted R043Source監察院新聞稿 [Control Yuan press release],紀惠容、田秋堇、范巽綠調查太陽光電申設疑義 [Chi Hui-jung, Tien Chiu-chin and Fan Sun-lu investigate doubts over solar installation applications],2025-10-20Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=125&s=35012Retrieved2026-10-30Snapshot timestamp—.Official record
- 09-22 The Tainan District Court granted bail to Chen Chi-yu and 2 others, and the three were released on bail on 09-24; the prosecutors appealed, the Taiwan High Court Tainan Branch set aside the ruling and remanded it, and on 09-26 the district court ruled afresh that the three would be detained for a further 2 months from 09-28 R044Source天地傳媒 [Tiandi Media] 轉載臺灣臺南地方法院 114 年度金重訴字第 2 號更為裁定新聞稿 [reprint of the Taiwan Tainan District Court press release on its fresh ruling in 114-Jin-Chong-Su No. 2](陳啟昱、蘇坤煌、蘇俊仁自 2025-09-28 延長羈押 [detention of Chen Chi-yu, Su Kun-huang and Su Chun-jen extended from 2025-09-28]),2025-09Original URLhttps://tdns.net.tw/news_view.php?new_sn=108586Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 10-03 The Ciaotou District Prosecutors Office's indictment in the Jiangjun District solar site bribery case was transferred to the court for trial, and is being heard by the Ciaotou District Court as 114 年度訴字第 778 號 (114-Su No. 778) R045Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 778 號刑事裁定 [Criminal Ruling, 114-Su No. 778](將軍區光電案場收賄案 [Jiangjun District solar site bribery case],朱更楠延長限制出境出海 [extension of the travel ban on Chu Keng-nan (朱更楠)]),2026-05-14(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/CTDM,114,%E8%A8%B4,778,20260514,2_d9e8daf86614ab1f9256767544a091997f42b344Retrieved2026-10-30Snapshot timestamp—.Official record
- 11-18 to 11-21 The solar regulations were amended, ending the era of EIA exemption R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 11-24 The Tainan District Court ruled that Chen Chi-yu and 2 others would be detained for a further 2 months from 11-28, no longer incommunicado R046Source天地傳媒 [Tiandi Media] 轉載臺灣高等法院臺南分院 115 年度抗字第 46 號裁定新聞稿 [reprint of the Taiwan High Court Tainan Branch press release on ruling 115-Kang No. 46](2026-01-28 裁定 [ruled 2026-01-28])Original URLhttps://tdns.net.tw/news_view.php?new_sn=119861Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 12-10 Ciaotou District Court judgment 114 年度重訴字第 94 號 (114-Chong-Su No. 94): Kenxin International Development Co., Ltd. (肯信國際開發股份有限公司) and Kuo Yu-ting (郭毓庭) prevailed, and Meiouya No. 7 Co., Ltd. (美歐亞七號股份有限公司) may not enforce a promissory-note ruling against them; the judgment records that the contract was signed 「係因於臺南市七股區建置容量160MWp之漁電共生太陽能案場」 ("for the purpose of building a 160 MWp fishery–solar co-location site in Qigu District, Tainan City") R047Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度重訴字第 94 號民事判決 [Civil Judgment 114-Chong-Su No. 94](肯信國際開發、郭毓庭對美歐亞七號 [Kenxin International Development and Kuo Yu-ting (郭毓庭) v. Meiouya No. 7]),2025-12-10(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/CTDV,114,%E9%87%8D%E8%A8%B4,94,20251210,1_1228d182d6c059a66d4ca8521c158723a08bf025Retrieved2026-10-30Snapshot timestamp—.Official record
- 2026
- 01-15 Supreme Administrative Court judgment 113 年度上字第 479 號 (113-Shang No. 479) in the Yabisi case: 「原判決廢棄,發回高雄高等行政法院高等行政訴訟庭。」 ("The original judgment is reversed and remanded to the High Administrative Litigation Division of the Kaohsiung High Administrative Court."). The reasons were that the lower court had not investigated whether Yabisi had 「確實完全未履行系爭負擔」 ("indeed entirely failed to fulfill the conditions at issue"), nor whether a performance period of less than 4 months was reasonable and whether the revocation complied with the principle of proportionality R018Source最高行政法院 [Supreme Administrative Court] 113 年度上字第 479 號判決 [Judgment 113-Shang No. 479](雅比斯光電對臺南市政府,廢止許可 [Yabisi Solar v. Tainan City Government, revocation of approval]),2026-01-15Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPAA,113,%E4%B8%8A,479,20260115,1Retrieved2026-10-30Snapshot timestamp—Mirror: https://lawplayer.com/judgment/TPAA,113,%E4%B8%8A,479,20260115,1_0f1428d62c06d7d0532a366e37ab91f2420e0ce2.Official record
- 01-26 The Tainan District Court released Chen Chi-yu on bail of NT$12 million and Su Kun-huang and Su Chun-jen on NT$7 million each, with electronic monitoring and a ban on leaving the country R036Source三立新聞網 [SET News],〈涉台鹽綠能光電弊案 南院裁定陳啓昱「1200萬交保」〉["Implicated in Taiyen Green Energy Solar Scandal, Chen Chi-yu Released on 'NT$12 Million Bail' by Tainan District Court"],2026-01-26Original URLhttps://www.setn.com/news/1786698Retrieved2026-10-30Snapshot timestamp—.Secondhand account The prosecutors appealed; on 01-28 the Taiwan High Court Tainan Branch, in 115 年度抗字第 46 號 (115-Kang No. 46), ruled 「抗告駁回。」 ("The appeal is dismissed."), with no further appeal allowed R046Source天地傳媒 [Tiandi Media] 轉載臺灣高等法院臺南分院 115 年度抗字第 46 號裁定新聞稿 [reprint of the Taiwan High Court Tainan Branch press release on ruling 115-Kang No. 46](2026-01-28 裁定 [ruled 2026-01-28])Original URLhttps://tdns.net.tw/news_view.php?new_sn=119861Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 02-12 Taipei District Court ruling 114 年度抗字第 590 號 (114-Kang No. 590) dismissed Taiyen Green Energy's appeal concerning the appointment of the presiding arbitrator in the arbitration over fishery–solar co-location in Qigu; on 06-11 the Taiwan High Court, in 115 年度非抗字第 44 號 (115-Fei-Kang No. 44), ruled 「再抗告駁回。」 ("The further appeal is dismissed.") R048Source臺灣臺北地方法院 [Taiwan Taipei District Court] 114 年度抗字第 590 號裁定 [Ruling 114-Kang No. 590](2026-02-12)、臺灣高等法院 [Taiwan High Court] 115 年度非抗字第 44 號裁定 [Ruling 115-Fei-Kang No. 44](2026-06-11):美歐亞七號與臺鹽綠能七股漁電共生仲裁之選任主任仲裁人 [appointment of the presiding arbitrator in the Meiouya No. 7–Taiyen Green Energy arbitration over fishery–solar co-location in Qigu]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPHV,115,%E9%9D%9E%E6%8A%97,44,20260611,1Retrieved2026-10-30Snapshot timestamp—Mirror of Taipei District Court ruling no. 590: https://lawplayer.com/judgment/TPDV,114,%E6%8A%97,590,20260212,1_ab7e49fe234030aaee61be52b8abc1699df588b8.Official record
- 03 A Ministry of Agriculture draft proposed "fishery for fishery, power for power" (漁歸漁、電歸電) R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- 03-20 In case 113年度訴字第349號 (the Xiao Erjia case), the Tainan District Court ruled that 5 companies, Tianxin Smart Green Energy, Tianren Energy, Tianrui Energy, Tianzhu Energy and Tianying Energy, would take part in the confiscation proceedings, with Chen Feng-lung (陳鳳龍) as their joint representative R008Source臺灣臺南地方法院 [Taiwan Tainan District Court] 113年度訴字第349號刑事裁定(參與沒收程序)[criminal ruling, case 113年度訴字第349號 (third-party confiscation proceedings)],2026-03-20(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/TNDM,115,%E8%81%B7%E5%8F%83,1,20260320,1_de6ca2ddc76a0f712747d2ffe42dca985baa5744Retrieved2026-10-30Snapshot timestamp—.Official record
- 03-26 The Tainan District Court heard the Liyang Group solar case (the Xiao Erjia case) and summoned 7 landowners who had signed contracts for cross-examination: the landowners mostly said it was long ago and they could not recall the details, and one said: 「我又不是犯罪的人,哪記得那麼清楚!」 ("I'm not a criminal, how would I remember it that clearly!"); the defense lawyer asked the judge to separate the witnesses to prevent collusion; prosecutors indicted 15 people, including Lin Wen-hsin (林文信), a former division chief of the Energy Administration, MOEA, Chen Kai-ling, former director of the Economic Development Bureau, and Ku Sheng-hui, president of the Liyang Group (an indictment is not a finding of guilt; no judgment yet) R049Source中時新聞網 [China Times],〈力暘光電弊案開庭 7地主作證嗆律師「我又不是犯罪的人」〉["Liyang Solar Scandal Goes to Trial; 7 Landowners Testify and Snap at Lawyer: 'I'm Not a Criminal'"] (Kuo Liang-chieh (郭良傑), 2026-03-27)Original URLhttps://www.chinatimes.com/realtimenews/20260326004799-260402Retrieved2026-11-06Snapshot timestamp—News report..Secondhand account
- 05-14 The Ciaotou District Court extended the ban on Jiangjun case defendant Chu Keng-nan (朱更楠) leaving the country by 8 months from 06-03, giving as its reason 「本案尚在審理中」 ("this case is still being heard") R045Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 778 號刑事裁定 [Criminal Ruling, 114-Su No. 778](將軍區光電案場收賄案 [Jiangjun District solar site bribery case],朱更楠延長限制出境出海 [extension of the travel ban on Chu Keng-nan (朱更楠)]),2026-05-14(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/CTDM,114,%E8%A8%B4,778,20260514,2_d9e8daf86614ab1f9256767544a091997f42b344Retrieved2026-10-30Snapshot timestamp—.Official record
- 05-20 The Xiao Erjia case was heard in the Tainan District Court, with Ku Sheng-hui, Chen Kai-ling and Lin Wen-hsin all present; a specialist of the Economic Development Bureau surnamed Chiu testified, relaying that Chen Kai-ling had once said 「如果我們擔心的話,簽上去他決行」 ("if we were worried, we could send it up and he would sign off on it"), and said 「不曾有長官特別指示或廠商關說,讓案件順利通過」 ("there was never any special instruction from superiors or lobbying by developers to get the cases through") R050Source聯合報 [United Daily News](記者邵心杰 [reporter Shao Hsin-chieh (邵心杰)]),〈台南光電弊案今下午開庭 同案被告經發局專員揭聯審秘辛〉["Tainan Solar Scandal in Court This Afternoon; Co-defendant Economic Development Bureau Specialist Reveals Inside Story of the Joint Review"],2026-05-20Original URLhttps://udn.com/news/story/7321/9515459Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- 06-22 Tainan District Court 115-Bu No. 578 civil ruling (115年度補字第 578 號民事裁定): plaintiff Taiyen Green Energy Co., Ltd. (臺鹽綠能股份有限公司; legal representative Lee Chieh-han [李杰翰]) and defendant Jinyang Electrical and Mechanical Engineering Co., Ltd. (金陽機電工程有限公司; legal representative Tai Hsiu-chu [戴秀珠]) sued to set aside arbitral award 114 Chung-hsiung Sheng-yi No. 001 (114 仲雄聲義字第 001 號) made by the Chinese Arbitration Association on 2026-05-05; operative part: 「一、本件訴訟標的價額核定為新臺幣54,200,985元。」 ("1. The value of the subject matter of this action is fixed at NT$54,200,985.") and 「二、原告應於收受本裁定後10日內補繳第一審裁判費新臺幣507,548元,如逾期未補繳,即駁回原告之訴。」 ("2. The plaintiff shall pay the additional first-instance court fee of NT$507,548 within 10 days of receiving this ruling; if it fails to do so by the deadline, the plaintiff's action shall be dismissed."). The ruling does not state the project location, so whether it is in Qigu remains to be verified; this is another arbitration case of Taiyen Green Energy and has nothing to do with Meiouya No. 7 R051Source臺灣臺南地方法院 [Taiwan Tainan District Court] 115-Bu No. 578 civil ruling (115年度補字第 578 號民事裁定) (2026-06-22, reposted from the judgment database)Original URLhttps://lawplayer.com/judgment/TNDV,115,%E8%A3%9C,578,20260622,1Retrieved2026-11-06Snapshot timestamp—Court ruling (reposting site)..Official record Unverified
- 07-23 The Control Yuan investigated solar damage from Typhoon Danas: 17,609 solar panels in Tainan City were severely damaged, and the wind-resistance design standard in Qigu District was 37.5 m/s R041Source監察院調查 [Control Yuan investigations]:114司調0019(2025-07-09,臺鹽綠能前董事長陳啟昱案)[(2025-07-09, the case of Chen Chi-yu (陳啟昱), former chairman of Taiyen Green Energy)]、115財調0026(2026-07-23,丹娜絲颱風光電災損)[(2026-07-23, solar installations damaged by Typhoon Danas)]、111財調0034(2022-09-07,北門蘆竹溝光電場)[(2022-09-07, the Luzhugou solar farm in Beimen)]Original URLhttps://www.cy.gov.tw/Retrieved2026-10-19Snapshot timestamp—; the case summary states 「累計全臺多達12萬片光電板遭重創」 ("a cumulative total of as many as 120,000 solar panels across Taiwan were badly damaged") R052Source監察院調查報告 [Control Yuan investigation report] 115財調0026(丹娜絲颱風光電災損 [solar damage from Typhoon Danas];2026-07-23 審議、07-27 公告 [deliberated 2026-07-23, announced 07-27])Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49722Retrieved2026-10-30Snapshot timestamp—.Official record
- 08-18 Yabisi case on remand: the Kaohsiung High Administrative Court, in 115 年度訴更一字第 2 號 (115-Su-Geng-Yi No. 2), ruled 「本件準備程序終結。」 ("The preparatory proceedings in this case are concluded."); no judgment yet R053Source高雄高等行政法院 [Kaohsiung High Administrative Court] 115 年度訴更一字第 2 號裁定 [Ruling 115-Su-Geng-Yi No. 2](雅比斯光電更審 [Yabisi Solar case on remand]),2026-08-18(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/KSBA,115,%E8%A8%B4%E6%9B%B4%E4%B8%80,2,20260818,1_15aeac7b85d47c8d6081b9e5b73e6d8986ce1487Retrieved2026-10-30Snapshot timestamp—.Official record
- 09-21 The Tainan District Court extended the travel ban and electronic ankle monitoring of Chen Chi-yu from 09-27, and of Su Kun-huang and Su Chun-jen from 09-26, by 8 months; the first-instance trial in the Taiyen Green Energy case is still ongoing R054Source天地傳媒 [Tiandi Media] 轉載臺灣臺南地方法院 114 年度金重訴字第 2 號裁定新聞稿 [reprint of the Taiwan Tainan District Court press release on its ruling in 114-Jin-Chong-Su No. 2](2026-09-21 延長限制出境出海與科技監控 [travel ban and electronic monitoring extended on 2026-09-21])Original URLhttps://tdns.net.tw/news_view.php?new_sn=143975Retrieved2026-10-30Snapshot timestamp—.Secondhand account
Announcements and sites in coastal counties and cities
First items: Priority-area announcements (Executive Yuan Gazette)SitesCoastal managementMoreLess
Priority-area announcements (Executive Yuan Gazette)
- 2020-11-16 Chiayi County and Tainan City (first batch), 2,626.29 hectares R011Source行政院公報 [Executive Yuan Gazette],經濟部、行政院農業委員會公告 [joint announcement of the Ministry of Economic Affairs and the Council of Agriculture, Executive Yuan]〈嘉義縣及臺南市可優先推動漁業經營結合綠能之區位範圍〉["Areas in Chiayi County and Tainan City Where Combining Fishery Operations with Green Energy May Be Prioritized"](經能字第10904605750號、農漁字第1091223634號),2020-11-16Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg026218/ch04/type3/gov31/num14/Eg.htmRetrieved2026-10-30Snapshot timestamp—.Official record
- 2021-06-16 Xuejia District, Tainan City, 358.16 hectares R014Source農業部農村發展及水土保持署農村規劃組 [Ministry of Agriculture, Agency of Rural Development and Soil and Water Conservation, Rural Planning Division],〈農業綠能法規及近期函釋說明〉簡報 [presentation, "Explanation of Agricultural Green Energy Regulations and Recent Interpretive Letters"],2024-07,頁 20 [p. 20]Original URLhttps://isdistorages.blob.core.windows.net/materials/240711-0902_11307-%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD%E6%B3%95%E8%A6%8F%E5%8F%8A%E8%BF%91%E6%9C%9F%E5%87%BD%E9%87%8B%E8%AA%AA%E6%98%8E(%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD).pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- 2021-11-11 Kouhu Township and Sihu Township, Yunlin County, 803.79 hectares (land buffer zone 515.87 hectares) R055Source行政院公報 [Executive Yuan Gazette],經濟部、農委會公告雲林縣口湖鄉及四湖鄉可優先推動漁業經營結合綠能之區位範圍 [joint announcement of the MOEA and the Council of Agriculture on areas in Kouhu and Sihu Townships, Yunlin County, where combining fishery operations with green energy may be prioritized](經能字第11004605530號、農漁字第1100725257號),2021-11-11Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg027215/ch04/type3/gov31/num10/Eg.pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- 2022-05-06 Added: Budai Township and Yizhu Township, Chiayi County, 13.41 hectares R056Source行政院公報 [Executive Yuan Gazette],經濟部、農委會公告新增嘉義縣布袋鎮及義竹鄉可優先推動漁業經營結合綠能之區位範圍 [joint announcement of the MOEA and the Council of Agriculture adding areas in Budai Township and Yizhu Township, Chiayi County, where combining fishery operations with green energy may be prioritized](經能字第11104601580號、農漁字第1110709472號),2022-05-06Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg028084/ch04/type3/gov31/num8/Eg.pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- 2022-08-24 Added: Dongshi Township, Chiayi County, 260.96 hectares (land buffer zone 37.79 hectares) R057Source行政院公報 [Executive Yuan Gazette],經濟部、農委會公告新增嘉義縣東石鄉可優先推動漁業經營結合綠能之區位範圍 [joint announcement of the MOEA and the Council of Agriculture adding areas in Dongshi Township, Chiayi County, where combining fishery operations with green energy may be prioritized](經能字第11104603200號、農漁字第1110719156號),2022-08-24Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg028160/ch04/type3/gov31/num7/Eg.htmRetrieved2026-10-30Snapshot timestamp—.Official record
- 2022-12-02 (another account: 12-01) Qigu District, Tainan City R005Source行政院公報 [Executive Yuan Gazette]:第 024 卷第 093 期 [vol. 24, no. 93](2018-05-21 漁電共生試驗專案計畫作業原則)[(2018-05-21, Operating Principles for Fishery–Solar Co-location Pilot Projects)]、第 028 卷第 230 期 [vol. 28, no. 230](2022-12-02 七股區可優先推動漁業經營結合綠能之區位範圍)[(2022-12-02, areas in Qigu District where combining fishery operations with green energy may be prioritized)]、第 029 卷第 182 期 [vol. 29, no. 182](2023-09-25 廢止作業原則)[(2023-09-25, repeal of the operating principles)]Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—R014Source農業部農村發展及水土保持署農村規劃組 [Ministry of Agriculture, Agency of Rural Development and Soil and Water Conservation, Rural Planning Division],〈農業綠能法規及近期函釋說明〉簡報 [presentation, "Explanation of Agricultural Green Energy Regulations and Recent Interpretive Letters"],2024-07,頁 20 [p. 20]Original URLhttps://isdistorages.blob.core.windows.net/materials/240711-0902_11307-%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD%E6%B3%95%E8%A6%8F%E5%8F%8A%E8%BF%91%E6%9C%9F%E5%87%BD%E9%87%8B%E8%AA%AA%E6%98%8E(%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD).pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- 2022-12-21 Added: Jiangjun District and Madou District, Tainan City, 173.26 hectares R022Source行政院公報 [Executive Yuan Gazette],經濟部、農委會公告新增臺南市將軍區及麻豆區可優先推動漁業經營結合綠能之區位範圍 [joint announcement of the MOEA and the Council of Agriculture adding areas in Jiangjun District and Madou District, Tainan City, where combining fishery operations with green energy may be prioritized](經能字第11104605080號、農漁字第1110728710號),2022-12-21Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg028243/ch04/type3/gov31/num15/Eg.pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- Statistics in a July 2024 Ministry of Agriculture presentation: the total area of priority areas announced by the Ministry of Economic Affairs together with the Ministry of Agriculture is 11,348.16 hectares R014Source農業部農村發展及水土保持署農村規劃組 [Ministry of Agriculture, Agency of Rural Development and Soil and Water Conservation, Rural Planning Division],〈農業綠能法規及近期函釋說明〉簡報 [presentation, "Explanation of Agricultural Green Energy Regulations and Recent Interpretive Letters"],2024-07,頁 20 [p. 20]Original URLhttps://isdistorages.blob.core.windows.net/materials/240711-0902_11307-%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD%E6%B3%95%E8%A6%8F%E5%8F%8A%E8%BF%91%E6%9C%9F%E5%87%BD%E9%87%8B%E8%AA%AA%E6%98%8E(%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD).pdfRetrieved2026-10-30Snapshot timestamp—.Official record
Sites
- Taipower's Tainan salt-field solar farm (Qigu and Jiangjun): see the entries for 2020 and 2021 R006Source台灣電力公司新聞稿 [Taiwan Power Company press release],〈台電台南太陽光電場150MW創全台最大! 今提前併網40MW試運轉〉["Taipower's 150 MW Tainan Solar Farm Is Taiwan's Largest! 40 MW Connected to the Grid Ahead of Schedule Today for Trial Operation"],2020-04-10Original URLhttps://www.taipower.com.tw/2289/2323/2324/7472/Retrieved2026-10-30Snapshot timestamp—R010Source環境資訊中心 [Taiwan Environmental Information Center](記者 [reporter] Sun Wen-lin (孫文臨)),台電台南鹽田光電場啟用報導 [report on the opening of Taipower's Tainan salt-field solar farm],2021-04-06(臺中市低碳城市網轉載)[(reposted on the Taichung City Low-Carbon City website)]Original URLhttps://lowcarbon.taichung.gov.tw/page/news/show.aspx?num=273Retrieved2026-10-30Snapshot timestamp—.Official record
- The Taisugar Qigu project of the Chung Hsin Electric group (Tianpeng, Tianchong, Tianqin) and Xingwei Qigu: see the entries for 2020–2021 R009Source經濟部能源署 [Energy Administration, MOEA],再生能源發電設備施工許可清冊(109–111 年度)[register of construction permits for renewable energy generating equipment (ROC years 109–111, i.e. 2020–2022)]Original URLhttps://www.moeaea.gov.tw/ECW/populace/content/wHandMenuFile.ashx?file_id=14159Retrieved2026-10-30Snapshot timestamp—R015Source工商時報 [Commercial Times](記者 [reporter] Shen Mei-hsing (沈美幸)),中興電台糖七股光電南案場併聯報導 [report on grid connection of the southern site of Chung Hsin Electric's Taisugar Qigu solar project],2021-06-24(經濟部能源署再生能源資訊網轉載)[(reposted on the MOEA Energy Administration's renewable energy information website)]Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—.Official record
- Xuejia
- Hsiao Chih Co., Ltd.'s (孝智股份有限公司) "Hsiao Chih Tainan Fishery–Solar Co-location Development Project": land of 1,036,448.23 square meters, planned capacity of 82,665.6 kW, establishment permit obtained; the largest village affected is Guanghua Village in Xuejia District, and the information session was held at the Huanchang Activity Center in Xuejia District R058Source孝智股份有限公司 [Hsiao Chih Co., Ltd.],〈孝智台南漁電共生開發案〉秀昌里說明會簡報 ["Hsiao Chih Tainan Fishery–Solar Co-location Development Project," presentation at the Xiuchang Village information session]Original URLhttps://www.hengs.com/pdf/4.%E7%A7%80%E6%98%8C%E9%87%8C.pdfRetrieved2026-10-30Snapshot timestamp—.Secondhand account
- Phase 3 of the Xuejia fishery–solar ground-mounted solar power plant of Taiwan Tianhe No. 1 Energy (台灣天和一號能源) (incorporation approved 2022-10-28): local information session on electricity enterprise establishment held 2026-07-16; 24 parcels totaling about 22 hectares in the Zhongzhou, Guanghua and Xuejia sections of Xuejia District, with an expected 18.325 MWp, grid connection point at the Hsiao Chih step-up substation, located in a fishery–solar co-location area of concern for mitigation and in a priority area R059Source台灣天和一號能源 [Taiwan Tianhe No. 1 Energy],〈學甲漁電地面型太陽光電廠(第三期)三慶里電業籌設說明會簡報〉["Xuejia Fishery–Solar Ground-Mounted Solar Power Plant (Phase 3): Presentation at the Sanqing Village Information Session on Electricity Enterprise Establishment"],2026-07-16Original URLhttps://lightsourcebp.com/app/uploads/2026/07/%E5%8F%B0%E7%81%A3%E5%A4%A9%E5%92%8C%E4%B8%80%E8%99%9F_20260716_%E4%B8%89%E6%85%B6%E9%87%8C%E9%9B%BB%E7%B1%8C%E8%AA%AA%E6%98%8E%E6%9C%83%E7%B0%A1%E5%A0%B1.pdfRetrieved2026-10-30Snapshot timestamp—.Secondhand account
- Budai, Chiayi
- The National Property Administration's (國產署) solar project on 153.17841 hectares of salt-industry land, comprising 67 parcels of state-owned land including parcel 8 of the Xinnan section, Budai Township: revenue split 60%/40% with the Bureau of Energy; contracts awarded to Aigui Solar (艾貴太陽能) and Yeheng Energy (瞱恆能源) for 30 years; partial operation from 2019-07-30; estimated annual rent of NT$74.8 million and investment of NT$13.8 billion R060Source財政部國有財產署 [National Property Administration, Ministry of Finance],〈嘉義縣布袋鎮國有土地改良利用案-鹽業用地設置太陽光電設施案〉["Improvement and Utilization of State-Owned Land in Budai Township, Chiayi County: Installation of Solar Facilities on Salt-Industry Land"]Original URLhttps://esvc.fnp.gov.tw/result/singlehtml/7ab38cef2892446fb7451888624bac4c?cntId=e71f5b5dddf2430d97f2f61b6c9633a8Retrieved2026-10-30Snapshot timestamp—.Official record
- The 20 MW Chiayi salt-land solar power plant of Yeheng Energy (曄恆能源), a subsidiary of Formosa Sun Energy: 23 hectares of abandoned salt flats in Budai Township, connected to the grid in September 2019, with 30% retained as an ecological reserve R061Source寶島陽光能源科技 [Formosa Sun Energy Technology],〈嘉義鹽地太陽光電廠20MW〉案例頁 [case page, "Chiayi Salt Land Solar Power Plant, 20 MW"]Original URLhttps://www.formosasolar.com.tw/zh-tw/work.php?act=view&id=4Retrieved2026-10-30Snapshot timestamp—.Secondhand account
Coastal management
- Explanation by the National Land Management Agency, Ministry of the Interior (內政部國土署): solar projects that had not obtained a construction permit before 2020-06-15 must first obtain a coastal special-zone permit; the Bureau of Energy's preliminary tally of relevant cases was about 34; in Tainan, only cases in Beimen and Qigu involve a first-tier coastal protection plan R062Source內政部國土管理署 [National Land Management Agency, Ministry of the Interior],太陽光電案件申請海岸特定區位許可說明會簡報 [presentation at an information session on applications for coastal special-zone permits for solar projects]Original URLhttps://www.nlma.gov.tw/uploads/files/9f5c4c8b1f0cd2f62ba36c109559a69b.pdfRetrieved2026-10-30Snapshot timestamp—.Official record
Related cases in Annan District
First items: In the first batch of fishery–solar co-l…On 2025-10-02 the Taiwan Ciaotou Distric…On 2025-12-15 the Ciaotou District Prose…MoreLess
- In the first batch of fishery–solar co-location priority areas announced on 2020-11-16, Tainan City's 1,750.13 hectares included 「安南區部分地區」 ("parts of Annan District") R011Source行政院公報 [Executive Yuan Gazette],經濟部、行政院農業委員會公告 [joint announcement of the Ministry of Economic Affairs and the Council of Agriculture, Executive Yuan]〈嘉義縣及臺南市可優先推動漁業經營結合綠能之區位範圍〉["Areas in Chiayi County and Tainan City Where Combining Fishery Operations with Green Energy May Be Prioritized"](經能字第10904605750號、農漁字第1091223634號),2020-11-16Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg026218/ch04/type3/gov31/num14/Eg.htmRetrieved2026-10-30Snapshot timestamp—.Official record
- On 2025-10-02 the Taiwan Ciaotou District Prosecutors Office (臺灣橋頭地方檢察署) issued a press release on the conclusion of its investigation and its indictment of Kuo Hsin-liang (郭信良) (described in the press release as former council speaker and current councilor; accepting bribes under Article 5, Paragraph 1, Subparagraph 3 of the Anti-Corruption Act), Chung Chia-tsun (鍾嘉村), Chu Keng-nan and Lee Yen-feng (李彥鋒), over the 「臺南市將軍區室內養殖場暨太陽光電工程10,520KW工程」 ("Indoor Aquaculture Facility and Solar Photovoltaic Project, 10,520 kW, Jiangjun District, Tainan City") R063Source臺灣橋頭地方檢察署新聞稿 [Taiwan Ciaotou District Prosecutors Office press release],將軍區室內養殖場暨太陽光電工程收賄案偵結起訴 [investigation concluded and indictment filed in the bribery case over an indoor aquaculture facility and solar project in Jiangjun District],2025-10-02Original URLhttps://www.qtc.moj.gov.tw/10181/10255/10257/1333290/postRetrieved2026-10-30Snapshot timestamp—.Official record
- The press release states: on 2024-03-14, at the Annan works office of Gangshan Construction (岡山營造), NT$4 million was handed over and signed for by Lee Yi-chang (李宜璋), and on 03-15 NT$5 million was handed over and signed for by Kuo Hsin-liang in person R063Source臺灣橋頭地方檢察署新聞稿 [Taiwan Ciaotou District Prosecutors Office press release],將軍區室內養殖場暨太陽光電工程收賄案偵結起訴 [investigation concluded and indictment filed in the bribery case over an indoor aquaculture facility and solar project in Jiangjun District],2025-10-02Original URLhttps://www.qtc.moj.gov.tw/10181/10255/10257/1333290/postRetrieved2026-10-30Snapshot timestamp—.Official record
- The full names come from the indictment as summarized in the reasoning of Ciaotou District Court judgment 114 年度訴字第 1474 號 (114-Su No. 1474) (the original press release used masked names) R064Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 1474 號刑事判決 [Criminal Judgment, 114-Su No. 1474](2026-06-29, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=CTDM%2C114%2C%E8%A8%B4%2C1474%2C20260629%2C1Retrieved2026-10-30Snapshot timestamp—:Official record
- Chung Chia-tsun: head of Sandi Energy Co., Ltd. (三地能源股份有限公司), Sandi Development Industrial Co., Ltd. (三地開發實業股份有限公司), and the Sandi Group subsidiaries Hongtu Energy Co., Ltd. (鴻圖能源股份有限公司) and Woyang Energy Co., Ltd. (沃陽能源股份有限公司).
- Chu Keng-nan: head of Gangshan Construction Co., Ltd. (岡山營造有限公司).
- Lee Yen-feng: de facto head of Xiangjin Environmental Protection Co., Ltd. (祥金環保有限公司) (indicted together with Chu Keng-nan for violating the Waste Disposal Act).
- Lee Yi-chang: an employee of Yufeng Energy Engineering Co., Ltd. (昱峰能源工程股份有限公司); Lee Tung-shen (李東燊): director of the councilor's service office.
- The indictment also states that Kuo Hsin-liang summoned Wu Jung-tsai (吳榮在), chief of the Fisheries Section of the Tainan City Government Agriculture Bureau, and case officer Chien Yu-ling (錢玉鈴) to press for progress on the site.
- Procedure: the indictment was transferred to the court for trial on 2025-10-03 and is being heard by the Ciaotou District Court as 114 年度訴字第 778 號 (114-Su No. 778); on 2026-05-14 the court extended the ban on Chu Keng-nan leaving the country by 8 months R045Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 778 號刑事裁定 [Criminal Ruling, 114-Su No. 778](將軍區光電案場收賄案 [Jiangjun District solar site bribery case],朱更楠延長限制出境出海 [extension of the travel ban on Chu Keng-nan (朱更楠)]),2026-05-14(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/CTDM,114,%E8%A8%B4,778,20260514,2_d9e8daf86614ab1f9256767544a091997f42b344Retrieved2026-10-30Snapshot timestamp—.Official record
- This is an indictment by prosecutors, not a court judgment.
- On 2025-12-15 the Ciaotou District Prosecutors Office filed a supplementary indictment under the 《廢棄物清理法》 (Waste Disposal Act) against former Tainan City Council Speaker Kuo Hsin-liang, seeking a sentence of 3 years and 6 months; in the same case it indicted 5 people, including a contractor surnamed Lee, and a company R065Source公視新聞網 [PTS News Network],郭信良涉安南區城西段土地回填營建廢土遭追加起訴報導 [report on the supplementary indictment of Kuo Hsin-liang (郭信良) over backfilling land on the Chengxi section of Annan District with construction waste soil],2025-12-15Original URLhttps://news.pts.org.tw/article/785996Retrieved2026-10-30Snapshot timestamp—.Secondhand account The co-defendants listed in the judgments: Dawan Construction Co., Ltd. (大灣營造股份有限公司, together with its representative Lee Nan-han 李南翰), Dawei Engineering Co., Ltd. (大崴工程有限公司, representative Lin Yen-ying 林彥穎), Hsu Che-pin (徐哲斌), Huang Chiu-tai (黃久泰) and Tsai Cheng-yuan (蔡政原) R066Source臺灣高等法院高雄分院 [Taiwan High Court Kaohsiung Branch Court] 115 年度上訴字第 2274 號刑事判決 [Criminal Judgment, 115-Shang-Su No. 2274](2026-10-15, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=KSHM%2C115%2C%E4%B8%8A%E8%A8%B4%2C2274%2C20261015%2C1Retrieved2026-10-30Snapshot timestamp—.Official record
- The report states: through his own company, Yufeng Energy (昱峰能源), Kuo Hsin-liang leased 13 parcels of land on the Chengxi (城西) section of Annan District, originally intending them as a solar site; they lay idle because no Taipower feeder capacity was obtained. Between August and October 2024, nearly 50,000 cubic meters of construction waste soil from the building site of the Heshun Anju social housing project in the same district was used to backfill the land without treatment R065Source公視新聞網 [PTS News Network],郭信良涉安南區城西段土地回填營建廢土遭追加起訴報導 [report on the supplementary indictment of Kuo Hsin-liang (郭信良) over backfilling land on the Chengxi section of Annan District with construction waste soil],2025-12-15Original URLhttps://news.pts.org.tw/article/785996Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Chen Nai-hsiung (陳迺雄), chief of the illegal dumping section of the Soil Pollution Management Division of the Tainan City Environmental Protection Bureau (臺南市環保局), said the bureau would obtain the records from the Ciaotou District Prosecutors Office and, once there was no longer a need to preserve evidence, require those responsible to clean up the site R065Source公視新聞網 [PTS News Network],郭信良涉安南區城西段土地回填營建廢土遭追加起訴報導 [report on the supplementary indictment of Kuo Hsin-liang (郭信良) over backfilling land on the Chengxi section of Annan District with construction waste soil],2025-12-15Original URLhttps://news.pts.org.tw/article/785996Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Kuo Hsin-liang said he would explain himself to the court and that his conscience was clear R065Source公視新聞網 [PTS News Network],郭信良涉安南區城西段土地回填營建廢土遭追加起訴報導 [report on the supplementary indictment of Kuo Hsin-liang (郭信良) over backfilling land on the Chengxi section of Annan District with construction waste soil],2025-12-15Original URLhttps://news.pts.org.tw/article/785996Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- This is an indictment by prosecutors, not a court judgment.
- Judgments: Taiwan Ciaotou District Court (臺灣橋頭地方法院) 114 年度訴字第 1474 號 (114-Su No. 1474) (2026-06-29), operative part 「本件公訴不受理。」 ("The prosecution in this case is not accepted."); on the prosecution's appeal, Taiwan High Court Kaohsiung Branch Court (臺灣高等法院高雄分院) 115 年度上訴字第 2274 號 (115-Shang-Su No. 2274) (2026-10-15), operative part 「上訴駁回。」 ("The appeal is dismissed."). The reason was that the supplementary indictment was unlawful; these are procedural judgments, and the courts did not decide whether an offense was committed R064Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 1474 號刑事判決 [Criminal Judgment, 114-Su No. 1474](2026-06-29, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=CTDM%2C114%2C%E8%A8%B4%2C1474%2C20260629%2C1Retrieved2026-10-30Snapshot timestamp—R066Source臺灣高等法院高雄分院 [Taiwan High Court Kaohsiung Branch Court] 115 年度上訴字第 2274 號刑事判決 [Criminal Judgment, 115-Shang-Su No. 2274](2026-10-15, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=KSHM%2C115%2C%E4%B8%8A%E8%A8%B4%2C2274%2C20261015%2C1Retrieved2026-10-30Snapshot timestamp—.Official record
- In 2026 the Annan District Office (安南區公所) published two rows on its handling of petitions about solar green energy R067Source臺南市安南區公所 [Annan District Office, Tainan City],〈陽光綠能(太陽能光電與漁電共生)115 年民眾陳情事項及反饋處理情形〉["Solar Green Energy (Solar Photovoltaics and Fishery–Solar Co-location): Public Petitions and Responses, ROC Year 115 (2026)"],2026Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMi9GUzAxLzM0L3JlbGZpbGUvMjc0MTMvODgxMDIzMC84OGZjNzhkMC1iNDdkLTRkZDgtODkwOS1iY2Y4M2ZjZDA2MjQucGRm&n=6Ie65Y2X5biC5a6J5Y2X5Y2A5YWs5omA6Zm95YWJ57ag6IO96Zmz5oOF5Y%2BN5pig5LqL6aCFLnBkZg%3D%3DRetrieved2026-10-30Snapshot timestamp—:Official record
- On-site petition: a septic tank installed at a fishery–solar co-location site, with sewage overflowing into neighboring fish ponds → referred by letter to the Environmental Protection Bureau for investigation.
- Questionnaire survey: aging solar photovoltaic installations → on-site inspection, and the company notified to replace them.
- The Annan District Office's "Solar Green Energy" (陽光綠能專區) section has pages on fishery–solar co-location, solar photovoltaics, a green-energy dashboard, a green-energy petitions and feedback area, and a questionnaire on community benefit payments; the fishery–solar co-location page publishes the standard operating procedure (SOP) for review, an application quick guide and a dashboard of 「漁電共生審核案件與進度」 ("fishery–solar co-location review cases and progress") (updated 2026-05-21) R068Source臺南市安南區公所 [Annan District Office, Tainan City],「陽光綠能專區」["Solar Green Energy" section] 漁電共生頁 [fishery–solar co-location page](SOP 全攻略、申請懶人包、漁電共生審核案件與進度儀表板 [complete SOP guide, application quick guide, and dashboard of fishery–solar co-location review cases and progress])Original URLhttps://www.annan.gov.tw/News.aspx?n=47260&sms=27410Retrieved2026-10-30Snapshot timestamp—.Official record
- In 2021-04, Xiangyi'an Energy Technology's indoor aquaculture facility in Annan District combined with rooftop solar: about 1.6 hectares, 3 MW, raising whiteleg shrimp R013Source業者網站(surmount.com.tw)轉貼報導(署名邱家琳)[news report reposted on a company website (surmount.com.tw), bylined Chiu Chia-lin (邱家琳)],翔億安能源科技安南區室內養殖場結合太陽光電成果發表會 [launch event for Xiangyi'an Energy Technology's indoor aquaculture facility combined with solar photovoltaics in Annan District],2021-04-23Original URLhttps://www.surmount.com.tw/news-detail.php?id=131Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Solar on public sites in Chengxi (城西):
- Rooftop solar at the Chengxi Fly Ash Solidification Plant (城西飛灰固化廠): listed by the contractor as a 2016 project, with an installed capacity of 491.4 kWp; a reposted report says the roof is about half a hectare and generates about 1,900 kWh a day on average, and that 「這是全台第一個提供太陽能發電的廢棄物處理場」 ("this is the first waste treatment plant in Taiwan to provide solar power generation") R069Source聚恆科技案例頁 [Juheng Technology case-study pages]:2016 城西固化廠太陽能電廠、2017 城西掩埋場太陽能電廠(含轉貼報導)[2016 Chengxi Solidification Plant solar power plant; 2017 Chengxi Landfill solar power plant (including reposted news reports)]Original URLhttps://www.hengs.com/solar-power-plants2017-tnrip-sesc0.htmlRetrieved2026-10-30Snapshot timestamp—2016 case-study page: https://www.hengs.com/solar-power-plants2016-tnrip-sesc0.html.Secondhand account
- Solar at the Chengxi Phase 0 Landfill (城西零期垃圾掩埋場): construction began in 2016-12 and was completed on 2017-08-08; the first phase covers 2 hectares and 1.48 MW, with estimated annual generation of 2 million kWh R069Source聚恆科技案例頁 [Juheng Technology case-study pages]:2016 城西固化廠太陽能電廠、2017 城西掩埋場太陽能電廠(含轉貼報導)[2016 Chengxi Solidification Plant solar power plant; 2017 Chengxi Landfill solar power plant (including reposted news reports)]Original URLhttps://www.hengs.com/solar-power-plants2017-tnrip-sesc0.htmlRetrieved2026-10-30Snapshot timestamp—2016 case-study page: https://www.hengs.com/solar-power-plants2016-tnrip-sesc0.html.Secondhand account
- Community benefit payments: the city government's guidelines provide that 30% of the previous year's solar incentive payment is set aside; if it is under NT$50,000 it all goes to the village (里) where the site is located, and any amount above that is divided equally between that village and the adjacent villages R070Source臺南市政府 [Tainan City Government],《臺南市政府已封閉垃圾掩埋場及廢棄物處理設施場所設置太陽光電發電系統回饋金實施要點》[Tainan City Government Implementation Guidelines on Community Benefit Payments for Solar Photovoltaic Systems Installed at Closed Landfills and Waste Treatment Facility Sites](2021-01-15 發布,2026-02-12 修正 [issued 2021-01-15, amended 2026-02-12])Original URLhttps://law01.tainan.gov.tw/glrsnewsout/LawContent.aspx?id=GL001399Retrieved2026-10-30Snapshot timestamp—.Official record The benefit area for the rooftop solar at the Chengxi Solidification Plant is Chengxi Village (城西里) in Annan District (the host village) plus Qingcao (青草), Chengnan (城南), Luer (鹿耳) and Sicao (四草) Villages (the adjacent villages), 28.8249 square kilometers in total; for 2026 an estimated NT$50,069 is available, all of it allocated to the Chengxi Village activity center R071Source臺南市環保局 [Tainan City Environmental Protection Bureau],115 年度城西固化廠屋頂太陽光電回饋金計畫書 [Community Benefit Payment Plan for the Rooftop Solar Photovoltaics at the Chengxi Solidification Plant, ROC Year 115 (2026)]Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMi9GUzAxLzM0L3JlbGZpbGUvMjIyNjQvODgxNTg3Mi83YTBiMDk0MS1jYzBmLTQyMzktOWE1My04NzUwMzE1N2VmMzYucGRm&n=MTE15aSq6Zm95YWJ6Zu7KOWbuuWMluW7oOWxi%2BmggikgLnBkZg%3D%3DRetrieved2026-10-30Snapshot timestamp—.Official record
- For the application process and review points for fishery–solar co-location announced in the Annan District Office's "Solar Green Energy" (陽光綠能專區) section, see 〈Annan District Fishery–Solar Co-location Application and Review Process〉.
People and bodies involved
Officials
9 items
- Chen Chi-chung: Minister of the Council of Agriculture, who announced the Xiao Erjia ban on 2020-07-07 R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- Huang Wei-che: Mayor of Tainan, who received the developers and agreed to joint review on 2021-02-05 R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—; stated on 2022-12-22 that no solar cases west of Provincial Highway 61 would be reviewed during his term R023Source臺灣高雄地方法院 [Taiwan Kaohsiung District Court] 113年度訴字第217號民事判決 [civil judgment, case 113年度訴字第217號](債務人異議之訴,七股區新生段光電開發定金)[(debtor's action of objection; deposit for solar development on the Xinsheng land section, Qigu District)],2024-07-31(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/KSDV,113,%E8%A8%B4,217,20240731,1_5fc211ed6ecdb3d3b01ca49576861bc605363448Retrieved2026-10-30Snapshot timestamp—; and answered the council on 2023-06-08 that "this promise has not changed" R025Source臺南市議會議員快訊 [Tainan City Council, Councilor News Flash],〈議員邱昭勝市政總質詢-市長強調光電無罪 藉此牟不法利益的政商才是黑金〉["Councilor Chiu Chao-sheng's (邱昭勝) General Interpellation: Mayor Stresses Solar Power Is Not the Crime; the Politicians and Businesspeople Who Profit Illegally from It Are the Real Black Gold"],2023-06-08Original URLhttps://www.tncc.gov.tw/page.asp?mainid=8DB14D98-EF2D-4B15-8501-A5B4DB264123Retrieved2026-10-30Snapshot timestamp—.Official record
- Chen Kai-ling: former director of the Tainan City Economic Development Bureau, impeached twice, in 2023 (a separate case) and in 2025 (the Xiao Erjia case); one of the defendants in the Xiao Erjia case R027Source監察院新聞稿 [Control Yuan press release],蔡崇義、林國明、王麗珍提案彈劾臺南市經發局前局長陳凱凌 [Tsai Chung-yi (蔡崇義), Lin Kuo-ming (林國明) and Wang Li-chen (王麗珍) propose the impeachment of Chen Kai-ling, former director of the Tainan City Economic Development Bureau],2023-11-15Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=27323Retrieved2026-10-30Snapshot timestamp—R037Source監察院新聞稿 [Control Yuan press release],〈林文程、浦忠成、趙永清提案彈劾游振偉、林文信、陳凱凌〉["Lin Wen-cheng, Pasuya Poiconx (浦忠成) and Chao Yung-ching (趙永清) Propose the Impeachment of Yu Chen-wei (游振偉), Lin Wen-hsin (林文信) and Chen Kai-ling (陳凱凌)"](114年劾字第1號)[(impeachment no. 114年劾字第1號)],2025-02-26Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=640&s=32628Retrieved2026-10-30Snapshot timestamp—R008Source臺灣臺南地方法院 [Taiwan Tainan District Court] 113年度訴字第349號刑事裁定(參與沒收程序)[criminal ruling, case 113年度訴字第349號 (third-party confiscation proceedings)],2026-03-20(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/TNDM,115,%E8%81%B7%E5%8F%83,1,20260320,1_de6ca2ddc76a0f712747d2ffe42dca985baa5744Retrieved2026-10-30Snapshot timestamp—.Official record
- Lin Wen-hsin: division director at the MOEA Bureau of Energy (later a senior specialist at the Energy Administration), impeached; one of the defendants in the Xiao Erjia case R037Source監察院新聞稿 [Control Yuan press release],〈林文程、浦忠成、趙永清提案彈劾游振偉、林文信、陳凱凌〉["Lin Wen-cheng, Pasuya Poiconx (浦忠成) and Chao Yung-ching (趙永清) Propose the Impeachment of Yu Chen-wei (游振偉), Lin Wen-hsin (林文信) and Chen Kai-ling (陳凱凌)"](114年劾字第1號)[(impeachment no. 114年劾字第1號)],2025-02-26Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=640&s=32628Retrieved2026-10-30Snapshot timestamp—R008Source臺灣臺南地方法院 [Taiwan Tainan District Court] 113年度訴字第349號刑事裁定(參與沒收程序)[criminal ruling, case 113年度訴字第349號 (third-party confiscation proceedings)],2026-03-20(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/TNDM,115,%E8%81%B7%E5%8F%83,1,20260320,1_de6ca2ddc76a0f712747d2ffe42dca985baa5744Retrieved2026-10-30Snapshot timestamp—.Official record
- Yu Chen-wei: Director-General of the Bureau of Energy (later Director-General of the Energy Administration), impeached R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—R037Source監察院新聞稿 [Control Yuan press release],〈林文程、浦忠成、趙永清提案彈劾游振偉、林文信、陳凱凌〉["Lin Wen-cheng, Pasuya Poiconx (浦忠成) and Chao Yung-ching (趙永清) Propose the Impeachment of Yu Chen-wei (游振偉), Lin Wen-hsin (林文信) and Chen Kai-ling (陳凱凌)"](114年劾字第1號)[(impeachment no. 114年劾字第1號)],2025-02-26Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=640&s=32628Retrieved2026-10-30Snapshot timestamp—.Official record
- 傅○涵 (surname Fu): representative of the Tainan City Agriculture Bureau, who issued a dissenting opinion at a joint review meeting (the Control Yuan report omits the full name) R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- 郭○欽 (surname Kuo): then an adviser to the Tainan City Government (the report omits the full name) R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—.Official record
- Lee Chun-li: Deputy Director-General of the Energy Administration, spokesperson for the 2024-07-01 press release R032Source經濟部新聞 [MOEA news],〈力暘七股案件已與地方政府合作調查 釐清疑慮前一塊錢都不會給〉["The Liyang Qigu Case Is Being Investigated Together with the Local Government; Not a Single Dollar Will Be Paid Until the Doubts Are Cleared"],2024-07-01Original URLhttps://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=115296Retrieved2026-10-30Snapshot timestamp—.Official record
- Chen Nai-hsiung: chief of the illegal dumping section of the Soil Pollution Management Division, Tainan City Environmental Protection Bureau (the Chengxi section backfill case) R065Source公視新聞網 [PTS News Network],郭信良涉安南區城西段土地回填營建廢土遭追加起訴報導 [report on the supplementary indictment of Kuo Hsin-liang (郭信良) over backfilling land on the Chengxi section of Annan District with construction waste soil],2025-12-15Original URLhttps://news.pts.org.tw/article/785996Retrieved2026-10-30Snapshot timestamp—.Secondhand account
Companies
8 items
- Taiwan Sugar Corporation (台灣糖業公司) (Qigu Farm), Chung Hsin Electric (chairman Chiang Yi-fu), Tianpeng Energy, Tianchong Energy, Tianqin Energy; Xingwei Power R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—R009Source經濟部能源署 [Energy Administration, MOEA],再生能源發電設備施工許可清冊(109–111 年度)[register of construction permits for renewable energy generating equipment (ROC years 109–111, i.e. 2020–2022)]Original URLhttps://www.moeaea.gov.tw/ECW/populace/content/wHandMenuFile.ashx?file_id=14159Retrieved2026-10-30Snapshot timestamp—R015Source工商時報 [Commercial Times](記者 [reporter] Shen Mei-hsing (沈美幸)),中興電台糖七股光電南案場併聯報導 [report on grid connection of the southern site of Chung Hsin Electric's Taisugar Qigu solar project],2021-06-24(經濟部能源署再生能源資訊網轉載)[(reposted on the MOEA Energy Administration's renewable energy information website)]Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—.Official record
- The Liyang Group and the "Five Tian Companies" (Tianxin Smart Green Energy, Tianren Energy, Tianrui Energy, Tianzhu Energy, Tianying Energy; joint representative Chen Feng-lung), whose president is 古○煇 (surname Ku; the Control Yuan report omits the full name) R007Source監察院調查報告 [Control Yuan investigation report] 114財調0012(2025-03-05 審議)[(deliberated 2025-03-05)]:臺南市政府審查地面型太陽光電設施案件 [the Tainan City Government's review of ground-mounted solar facility applications];同案彈劾見 114年劾字第1號 [for the impeachment in the same case, see impeachment no. 114年劾字第1號]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49074Retrieved2026-10-19Snapshot timestamp—R008Source臺灣臺南地方法院 [Taiwan Tainan District Court] 113年度訴字第349號刑事裁定(參與沒收程序)[criminal ruling, case 113年度訴字第349號 (third-party confiscation proceedings)],2026-03-20(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/TNDM,115,%E8%81%B7%E5%8F%83,1,20260320,1_de6ca2ddc76a0f712747d2ffe42dca985baa5744Retrieved2026-10-30Snapshot timestamp—.Official record
- Taiyen Green Energy Co., Ltd., former chairman Chen Chi-yu R041Source監察院調查 [Control Yuan investigations]:114司調0019(2025-07-09,臺鹽綠能前董事長陳啟昱案)[(2025-07-09, the case of Chen Chi-yu (陳啟昱), former chairman of Taiyen Green Energy)]、115財調0026(2026-07-23,丹娜絲颱風光電災損)[(2026-07-23, solar installations damaged by Typhoon Danas)]、111財調0034(2022-09-07,北門蘆竹溝光電場)[(2022-09-07, the Luzhugou solar farm in Beimen)]Original URLhttps://www.cy.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
- Taiwan Power Company (台灣電力公司) (Tainan salt-field solar farm; chairman Yang Wei-fu) R006Source台灣電力公司新聞稿 [Taiwan Power Company press release],〈台電台南太陽光電場150MW創全台最大! 今提前併網40MW試運轉〉["Taipower's 150 MW Tainan Solar Farm Is Taiwan's Largest! 40 MW Connected to the Grid Ahead of Schedule Today for Trial Operation"],2020-04-10Original URLhttps://www.taipower.com.tw/2289/2323/2324/7472/Retrieved2026-10-30Snapshot timestamp—R010Source環境資訊中心 [Taiwan Environmental Information Center](記者 [reporter] Sun Wen-lin (孫文臨)),台電台南鹽田光電場啟用報導 [report on the opening of Taipower's Tainan salt-field solar farm],2021-04-06(臺中市低碳城市網轉載)[(reposted on the Taichung City Low-Carbon City website)]Original URLhttps://lowcarbon.taichung.gov.tw/page/news/show.aspx?num=273Retrieved2026-10-30Snapshot timestamp—.Official record
- Yufeng Energy Engineering Co., Ltd. (of which Kuo Hsin-liang is the de facto head; it leased land on the Chengxi section of Annan District and helped handle the electricity business preparation for the Jiangjun site) R065Source公視新聞網 [PTS News Network],郭信良涉安南區城西段土地回填營建廢土遭追加起訴報導 [report on the supplementary indictment of Kuo Hsin-liang (郭信良) over backfilling land on the Chengxi section of Annan District with construction waste soil],2025-12-15Original URLhttps://news.pts.org.tw/article/785996Retrieved2026-10-30Snapshot timestamp—R064Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 1474 號刑事判決 [Criminal Judgment, 114-Su No. 1474](2026-06-29, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=CTDM%2C114%2C%E8%A8%B4%2C1474%2C20260629%2C1Retrieved2026-10-30Snapshot timestamp—.Official record
- Sandi Energy, Sandi Development and their subsidiaries Hongtu Energy and Woyang Energy (head: Chung Chia-tsun; the Jiangjun site); Gangshan Construction Co., Ltd. (Chu Keng-nan); Xiangjin Environmental Protection Co., Ltd. (Lee Yen-feng) R064Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 1474 號刑事判決 [Criminal Judgment, 114-Su No. 1474](2026-06-29, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=CTDM%2C114%2C%E8%A8%B4%2C1474%2C20260629%2C1Retrieved2026-10-30Snapshot timestamp—.Official record
- Yabisi Solar Co., Ltd. (the Dachaogou case in Qigu; in administrative litigation with the Tainan City Government and the Southern Branch of the National Property Administration, 國產署南區分署) R016Source臺南市政府函 [Tainan City Government letter](府經能字第1101066383號,2021-08-31)復臺南市議會 [in reply to the Tainan City Council],雅比斯光電七股大潮溝案與新平能源將軍北門案 [on the Yabisi Solar Dachaogou case in Qigu and the Xinping Energy case in Jiangjun and Beimen](議會議事附件 [council meeting attachment])Original URLhttps://bill.tncc.gov.tw/NoPaperMeeting_TNCC/Upload/OutlineItemFile/4db4a77b-0b3d-498f-9435-83dccce33d5c.pdfRetrieved2026-10-30Snapshot timestamp—R018Source最高行政法院 [Supreme Administrative Court] 113 年度上字第 479 號判決 [Judgment 113-Shang No. 479](雅比斯光電對臺南市政府,廢止許可 [Yabisi Solar v. Tainan City Government, revocation of approval]),2026-01-15Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPAA,113,%E4%B8%8A,479,20260115,1Retrieved2026-10-30Snapshot timestamp—Mirror: https://lawplayer.com/judgment/TPAA,113,%E4%B8%8A,479,20260115,1_0f1428d62c06d7d0532a366e37ab91f2420e0ce2.Official record
- Meiouya No. 7 Co., Ltd. and Honghui International Technology Co., Ltd. (鴻暉國際科技股份有限公司) (in arbitration with Taiyen Green Energy over fishery–solar co-location in Qigu); Kenxin International Development Co., Ltd. (the 160 MWp fishery–solar co-location contract in Qigu) R048Source臺灣臺北地方法院 [Taiwan Taipei District Court] 114 年度抗字第 590 號裁定 [Ruling 114-Kang No. 590](2026-02-12)、臺灣高等法院 [Taiwan High Court] 115 年度非抗字第 44 號裁定 [Ruling 115-Fei-Kang No. 44](2026-06-11):美歐亞七號與臺鹽綠能七股漁電共生仲裁之選任主任仲裁人 [appointment of the presiding arbitrator in the Meiouya No. 7–Taiyen Green Energy arbitration over fishery–solar co-location in Qigu]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPHV,115,%E9%9D%9E%E6%8A%97,44,20260611,1Retrieved2026-10-30Snapshot timestamp—Mirror of Taipei District Court ruling no. 590: https://lawplayer.com/judgment/TPDV,114,%E6%8A%97,590,20260212,1_ab7e49fe234030aaee61be52b8abc1699df588b8R047Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度重訴字第 94 號民事判決 [Civil Judgment 114-Chong-Su No. 94](肯信國際開發、郭毓庭對美歐亞七號 [Kenxin International Development and Kuo Yu-ting (郭毓庭) v. Meiouya No. 7]),2025-12-10(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/CTDV,114,%E9%87%8D%E8%A8%B4,94,20251210,1_1228d182d6c059a66d4ca8521c158723a08bf025Retrieved2026-10-30Snapshot timestamp—.Official record
Defendants in judicial proceedings
6 items
- Xiao Erjia case (indicted 2024-04-26), 15 defendants: Lin Wen-hsin, Chen Kai-ling, Wang Chun-po (王俊博), Chiu Hsin-yi (邱馨誼), Chang Ting-ming (張庭銘), Ku Sheng-hui (古盛煇), Hsu Shuo-ting (徐碩廷), Ting Hsin-chih (丁馨芝), Lin Kuo-hui (林國輝), Hsieh Chia-yu (謝佳諭), Tu Chieh-an (杜婕安), Chu Chien-sen (朱建森), Lee Che-yu (李哲宇), Chiu Chi-hsiang (邱繼祥), Chang Chun-hao (張峻豪) R008Source臺灣臺南地方法院 [Taiwan Tainan District Court] 113年度訴字第349號刑事裁定(參與沒收程序)[criminal ruling, case 113年度訴字第349號 (third-party confiscation proceedings)],2026-03-20(司法院裁判書鏡像)[(mirror of Judicial Yuan judgments)]Original URLhttps://lawplayer.com/judgment/TNDM,115,%E8%81%B7%E5%8F%83,1,20260320,1_de6ca2ddc76a0f712747d2ffe42dca985baa5744Retrieved2026-10-30Snapshot timestamp—.Official record Being heard by the Tainan District Court as 113 年度訴字第 349 號 (113-Su No. 349); witnesses were still being examined on 2026-05-20 R050Source聯合報 [United Daily News](記者邵心杰 [reporter Shao Hsin-chieh (邵心杰)]),〈台南光電弊案今下午開庭 同案被告經發局專員揭聯審秘辛〉["Tainan Solar Scandal in Court This Afternoon; Co-defendant Economic Development Bureau Specialist Reveals Inside Story of the Joint Review"],2026-05-20Original URLhttps://udn.com/news/story/7321/9515459Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Taiyen Green Energy case (indicted 2025-02-27), 5 defendants: Chen Chi-yu, Su Kun-huang, Kuo Cheng-wei, Su Chun-jen, Tai Yu-chien R038Source中華日報 [China Daily News],臺鹽綠能案起訴 5 人報導 [report on the indictment of 5 people in the Taiyen Green Energy case],2025-02-27Original URLhttps://www.cdns.com.tw/articles/1175314Retrieved2026-10-30Snapshot timestamp—.Secondhand account Being heard by the Tainan District Court as 114 年度金重訴字第 2 號 (114-Jin-Chong-Su No. 2); Chen Chi-yu, Su Kun-huang and Su Chun-jen were released on bail in 2026-01, with their travel ban and electronic ankle monitors extended to May 2027 R054Source天地傳媒 [Tiandi Media] 轉載臺灣臺南地方法院 114 年度金重訴字第 2 號裁定新聞稿 [reprint of the Taiwan Tainan District Court press release on its ruling in 114-Jin-Chong-Su No. 2](2026-09-21 延長限制出境出海與科技監控 [travel ban and electronic monitoring extended on 2026-09-21])Original URLhttps://tdns.net.tw/news_view.php?new_sn=143975Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Jiangjun District solar site bribery case (indictment transferred for trial 2025-10-03): Kuo Hsin-liang, Chung Chia-tsun, Chu Keng-nan, Lee Yen-feng; being heard by the Ciaotou District Court as 114 年度訴字第 778 號 (114-Su No. 778) R064Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 1474 號刑事判決 [Criminal Judgment, 114-Su No. 1474](2026-06-29, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=CTDM%2C114%2C%E8%A8%B4%2C1474%2C20260629%2C1Retrieved2026-10-30Snapshot timestamp—R045Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 778 號刑事裁定 [Criminal Ruling, 114-Su No. 778](將軍區光電案場收賄案 [Jiangjun District solar site bribery case],朱更楠延長限制出境出海 [extension of the travel ban on Chu Keng-nan (朱更楠)]),2026-05-14(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/CTDM,114,%E8%A8%B4,778,20260514,2_d9e8daf86614ab1f9256767544a091997f42b344Retrieved2026-10-30Snapshot timestamp—.Official record
- Chengxi section backfill case (supplementary indictment 2025-12-15): Kuo Hsin-liang, plus Dawan Construction Co., Ltd. (together with its representative Lee Nan-han), Dawei Engineering Co., Ltd. (representative Lin Yen-ying), Hsu Che-pin, Huang Chiu-tai and Tsai Cheng-yuan R065Source公視新聞網 [PTS News Network],郭信良涉安南區城西段土地回填營建廢土遭追加起訴報導 [report on the supplementary indictment of Kuo Hsin-liang (郭信良) over backfilling land on the Chengxi section of Annan District with construction waste soil],2025-12-15Original URLhttps://news.pts.org.tw/article/785996Retrieved2026-10-30Snapshot timestamp—R066Source臺灣高等法院高雄分院 [Taiwan High Court Kaohsiung Branch Court] 115 年度上訴字第 2274 號刑事判決 [Criminal Judgment, 115-Shang-Su No. 2274](2026-10-15, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=KSHM%2C115%2C%E4%B8%8A%E8%A8%B4%2C2274%2C20261015%2C1Retrieved2026-10-30Snapshot timestamp—.Official record At first instance the prosecution was not accepted, and at second instance the appeal was dismissed (procedural judgments; the courts did not decide whether a crime was committed) R064Source臺灣橋頭地方法院 [Taiwan Ciaotou District Court] 114 年度訴字第 1474 號刑事判決 [Criminal Judgment, 114-Su No. 1474](2026-06-29, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=CTDM%2C114%2C%E8%A8%B4%2C1474%2C20260629%2C1Retrieved2026-10-30Snapshot timestamp—R066Source臺灣高等法院高雄分院 [Taiwan High Court Kaohsiung Branch Court] 115 年度上訴字第 2274 號刑事判決 [Criminal Judgment, 115-Shang-Su No. 2274](2026-10-15, violation of the Waste Disposal Act),司法院裁判書查詢系統 [Judicial Yuan Law and Regulations Retrieval System (judgments)]Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=KSHM%2C115%2C%E4%B8%8A%E8%A8%B4%2C2274%2C20261015%2C1Retrieved2026-10-30Snapshot timestamp—.Official record
- Chen Kai-ling's separate case (not a solar case): combined sentence at second instance of 6 years and 5 months' imprisonment and 5 years' deprivation of civil rights R029Source臺灣高等法院臺南分院 [Taiwan High Court Tainan Branch] 112 年度上訴字第 1571 號刑事判決 [Criminal Judgment, 112-Shang-Su No. 1571](陳凱凌另案 [separate case of Chen Kai-ling (陳凱凌)]),2024-01-31(司法院裁判書鏡像 [mirror of the Judicial Yuan judgment database])Original URLhttps://lawplayer.com/judgment/TNHM,112,%E4%B8%8A%E8%A8%B4,1571,20240131,1Retrieved2026-10-30Snapshot timestamp—.Official record
- An indictment does not mean guilt; apart from the Chengxi section case, none of the criminal cases above has yet received a first-instance judgment.
Control Yuan members
1 items
- Lin Wen-cheng and Wang Yu-ling (Taisugar case); Lin Wen-cheng, Pasuya Poiconx and Chao Yung-ching (Xiao Erjia case; reviewing member Kao Yung-cheng); Tsai Chung-yi, Lin Kuo-ming and Wang Li-chen (the separate Chen Kai-ling case); Wang Mei-yu (王美玉) and Yeh Ta-hua (葉大華) (Taiyen Green Energy case); Chi Hui-jung, Tien Chiu-chin and Fan Sun-lu (114財調0035); Yeh Yi-jin (葉宜津) (Typhoon Danas case) R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—R024Source監察院 [Control Yuan],糾正案文 [corrective measure] 112財正0007(林文程、王幼玲提案;2023-06-07 審議、06-14 公告)[(proposed by Lin Wen-cheng (林文程) and Wang Yu-ling (王幼玲); deliberated 2023-06-07, announced 06-14)]:台灣糖業公司配合太陽光電計畫將七股農場造林地改作光電用地 [Taiwan Sugar Corporation converted afforested land on its Qigu Farm to solar use in support of the solar photovoltaic program]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=134&s=28317Retrieved2026-10-30Snapshot timestamp—R037Source監察院新聞稿 [Control Yuan press release],〈林文程、浦忠成、趙永清提案彈劾游振偉、林文信、陳凱凌〉["Lin Wen-cheng, Pasuya Poiconx (浦忠成) and Chao Yung-ching (趙永清) Propose the Impeachment of Yu Chen-wei (游振偉), Lin Wen-hsin (林文信) and Chen Kai-ling (陳凱凌)"](114年劾字第1號)[(impeachment no. 114年劾字第1號)],2025-02-26Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=640&s=32628Retrieved2026-10-30Snapshot timestamp—R027Source監察院新聞稿 [Control Yuan press release],蔡崇義、林國明、王麗珍提案彈劾臺南市經發局前局長陳凱凌 [Tsai Chung-yi (蔡崇義), Lin Kuo-ming (林國明) and Wang Li-chen (王麗珍) propose the impeachment of Chen Kai-ling, former director of the Tainan City Economic Development Bureau],2023-11-15Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=27323Retrieved2026-10-30Snapshot timestamp—R041Source監察院調查 [Control Yuan investigations]:114司調0019(2025-07-09,臺鹽綠能前董事長陳啟昱案)[(2025-07-09, the case of Chen Chi-yu (陳啟昱), former chairman of Taiyen Green Energy)]、115財調0026(2026-07-23,丹娜絲颱風光電災損)[(2026-07-23, solar installations damaged by Typhoon Danas)]、111財調0034(2022-09-07,北門蘆竹溝光電場)[(2022-09-07, the Luzhugou solar farm in Beimen)]Original URLhttps://www.cy.gov.tw/Retrieved2026-10-19Snapshot timestamp—R042Source監察院調查報告 [Control Yuan investigation report] 114財調0035(紀惠容、田秋堇、范巽綠調查太陽能光電外商負責人控訴綠能政策案;2025-10-08 審議、10-20 公告)[(Chi Hui-jung (紀惠容), Tien Chiu-chin (田秋堇) and Fan Sun-lu (范巽綠) investigating complaints about green energy policy by the head of a foreign solar company; deliberated 2025-10-08, announced 10-20)]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=49317Retrieved2026-10-30Snapshot timestamp—.Official record
Elected representatives
4 items
- Chiu Chao-sheng: Tainan City councilor, who pressed the mayor on his Provincial Highway 61 promise in his general interpellation of 2023-06-08 R025Source臺南市議會議員快訊 [Tainan City Council, Councilor News Flash],〈議員邱昭勝市政總質詢-市長強調光電無罪 藉此牟不法利益的政商才是黑金〉["Councilor Chiu Chao-sheng's (邱昭勝) General Interpellation: Mayor Stresses Solar Power Is Not the Crime; the Politicians and Businesspeople Who Profit Illegally from It Are the Real Black Gold"],2023-06-08Original URLhttps://www.tncc.gov.tw/page.asp?mainid=8DB14D98-EF2D-4B15-8501-A5B4DB264123Retrieved2026-10-30Snapshot timestamp—.Official record
- Kuo Hsin-liang: former speaker of the Tainan City Council; the Jiangjun case (indicted 2025) and the Chengxi section case (supplementary indictment 2025-12-15) R063Source臺灣橋頭地方檢察署新聞稿 [Taiwan Ciaotou District Prosecutors Office press release],將軍區室內養殖場暨太陽光電工程收賄案偵結起訴 [investigation concluded and indictment filed in the bribery case over an indoor aquaculture facility and solar project in Jiangjun District],2025-10-02Original URLhttps://www.qtc.moj.gov.tw/10181/10255/10257/1333290/postRetrieved2026-10-30Snapshot timestamp—R065Source公視新聞網 [PTS News Network],郭信良涉安南區城西段土地回填營建廢土遭追加起訴報導 [report on the supplementary indictment of Kuo Hsin-liang (郭信良) over backfilling land on the Chengxi section of Annan District with construction waste soil],2025-12-15Original URLhttps://news.pts.org.tw/article/785996Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Chen Kun-ho: on 2023-11-24, as a legislative candidate, launched the "Oppose Improper Solar, Save Qigu" petition together with Qigu village chiefs R028SourceNOWnews(記者張振興 [reporter Chang Chen-hsing (張振興)]),〈陳昆和與七股里長宣布發起「反不當種電救七股」萬人聯署活動〉["Chen Kun-ho and Qigu Village Chiefs Announce a Ten-Thousand-Signature Petition, 'Oppose Improper Solar, Save Qigu'"],2023-11-24Original URLhttps://www.nownews.com/news/6308025Retrieved2026-10-30Snapshot timestamp—.Secondhand account
- Kuo Kuo-wen: legislator; a 2023-11 report relays him as saying that the Dachaogou solar project was withdrawn entirely within 3 months of his intervention R028SourceNOWnews(記者張振興 [reporter Chang Chen-hsing (張振興)]),〈陳昆和與七股里長宣布發起「反不當種電救七股」萬人聯署活動〉["Chen Kun-ho and Qigu Village Chiefs Announce a Ten-Thousand-Signature Petition, 'Oppose Improper Solar, Save Qigu'"],2023-11-24Original URLhttps://www.nownews.com/news/6308025Retrieved2026-10-30Snapshot timestamp—.Secondhand account
Local residents and groups
4 items
- The Qigu local youth alliance and the Save Qigu Alliance R001Source環境資訊中心 [Taiwan Environmental Information Center] 光電、漁電共生與綠能相關報導(2011–2026)[reporting on solar power, fishery–solar co-location and green energy (2011–2026)]Original URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—.Secondhand account
- Qigu fishers and fish farmers R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
- Interviewed by The Reporter in 2022: Yang Hui-chin (楊惠欽), chair of the Qigu Coastal Land Resources Protection Association (七股沿海土地資源保護協會); Shen Hsuan-yu, member of the Qigu Youth Alliance for Solar Oversight; Huang Hsien-li, chief of Sangu Village; Wang Pi-chu (王弼主), youth community representative of Sangu Village; and Chiu Chuang-yi (邱創禕), a fish farmer in the Dujia (篤加) community R021Source報導者 [The Reporter],〈當光電包圍漁村:七股漁電共生風波再起,居民在抗議什麼?〉["When Solar Surrounds a Fishing Village: The Qigu Fishery–Solar Controversy Flares Again. What Are Residents Protesting?"](文字林雨佑 [text by Lin Yu-yu (林雨佑)]),2022-11-10Original URLhttps://www.twreporter.org/a/qigu-fishery-electricity-symbiosisRetrieved2026-10-30Snapshot timestamp—Share of land: The Reporter in 2022 relayed Shen Hsuan-yu as saying that 1,148 hectares of solar sites had been registered in Qigu, about one tenth of the district..Secondhand account
- The 2023–2024 "Oppose Improper Solar, Save Qigu" petition: Chen Chung-cheng, head of the Qigu District Village Chiefs' Association (七股區里長聯誼會); Huang Chin-shih, chief of Qigu Village; Huang Hsien-li, chief of Sangu Village; Huang Yen-kuo, head of the Qigu Residents' Self-Help Association (七股居民自救會); Ko Sheng-chiang (柯勝強), chief of Xiliao Village (西寮里); Huang Wen-chien (黃文乾), chief of Yihe Village (義合里); Su Te-chuan (蘇德川), former mayor of Qigu Township; Chen Fu-te (陳福得), chair of the Qigu Farmers' Association (七股農會); and others R028SourceNOWnews(記者張振興 [reporter Chang Chen-hsing (張振興)]),〈陳昆和與七股里長宣布發起「反不當種電救七股」萬人聯署活動〉["Chen Kun-ho and Qigu Village Chiefs Announce a Ten-Thousand-Signature Petition, 'Oppose Improper Solar, Save Qigu'"],2023-11-24Original URLhttps://www.nownews.com/news/6308025Retrieved2026-10-30Snapshot timestamp—R026Source公視新聞網 [PTS News Network](陳奐宇、陳顯坤 [Chen Huan-yu (陳奐宇), Chen Hsien-kun (陳顯坤)]),〈七股開發光電農地魚塭破碎化 萬人連署反對不當種電〉["Solar Development Fragments Qigu's Farmland and Fish Ponds; Ten Thousand Sign Petition Against Improper Solar"],2024-01-04Original URLhttps://news.pts.org.tw/article/674801Retrieved2026-10-30Snapshot timestamp—Share of land: PTS in 2024 wrote that Qigu is about "1萬1公頃" ("10,001 hectares", sic), and that according to Economic Development Bureau statistics solar sites take up a little over 10%..Secondhand account
Filmmakers
1 items
- Huang Shu-mei (黃淑梅): director of "Revelations of the Qigu Solar Project" R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account
Local voices
First items: Chen Chung-cheng, head of the Qigu Distr…Huang Chin-shih, chief of Qigu Village: …Yang Hui-chin, chair of the Qigu Coastal…MoreLess
The own words of Qigu residents, village chiefs and companies as reported:
- Chen Chung-cheng, head of the Qigu District Village Chiefs' Association: 「沒有總量管制一直種,是要把我們七股種多少,是要種8成還是9成,你要有一個限制,因為我們七股所種的量已經超過每1個縣市的總和。」 ("Without a cap, they just keep planting. How much of Qigu do they want to cover? Eighty percent, ninety percent? There has to be a limit, because the amount planted in Qigu already exceeds the total of any single county or city.") R026Source公視新聞網 [PTS News Network](陳奐宇、陳顯坤 [Chen Huan-yu (陳奐宇), Chen Hsien-kun (陳顯坤)]),〈七股開發光電農地魚塭破碎化 萬人連署反對不當種電〉["Solar Development Fragments Qigu's Farmland and Fish Ponds; Ten Thousand Sign Petition Against Improper Solar"],2024-01-04Original URLhttps://news.pts.org.tw/article/674801Retrieved2026-10-30Snapshot timestamp—Share of land: PTS in 2024 wrote that Qigu is about "1萬1公頃" ("10,001 hectares", sic), and that according to Economic Development Bureau statistics solar sites take up a little over 10%..Secondhand account
- Huang Chin-shih, chief of Qigu Village: 「政府說不可耕種的土地才可以種電,但是來我們七股看看,看那些好的田地上面被種電,拿得到的案場這邊1塊、那邊1塊,旁邊的田地現在要怎麼辦。」 ("The government says only land that can't be farmed can be used for solar, but come and look at Qigu, look at the good fields with solar on them. The sites they can get are one plot here, one plot there; what are the fields next to them supposed to do now?") R026Source公視新聞網 [PTS News Network](陳奐宇、陳顯坤 [Chen Huan-yu (陳奐宇), Chen Hsien-kun (陳顯坤)]),〈七股開發光電農地魚塭破碎化 萬人連署反對不當種電〉["Solar Development Fragments Qigu's Farmland and Fish Ponds; Ten Thousand Sign Petition Against Improper Solar"],2024-01-04Original URLhttps://news.pts.org.tw/article/674801Retrieved2026-10-30Snapshot timestamp—Share of land: PTS in 2024 wrote that Qigu is about "1萬1公頃" ("10,001 hectares", sic), and that according to Economic Development Bureau statistics solar sites take up a little over 10%..Secondhand account
- Yang Hui-chin, chair of the Qigu Coastal Land Resources Protection Association (on tenant fishers): 「一旦真的要開發了,地主改口叫你走,你就得走,不然可能就變成侵佔土地。」 ("Once development really comes, if the landowner changes his tune and tells you to leave, you have to leave, or else you may end up occupying land illegally.") R021Source報導者 [The Reporter],〈當光電包圍漁村:七股漁電共生風波再起,居民在抗議什麼?〉["When Solar Surrounds a Fishing Village: The Qigu Fishery–Solar Controversy Flares Again. What Are Residents Protesting?"](文字林雨佑 [text by Lin Yu-yu (林雨佑)]),2022-11-10Original URLhttps://www.twreporter.org/a/qigu-fishery-electricity-symbiosisRetrieved2026-10-30Snapshot timestamp—Share of land: The Reporter in 2022 relayed Shen Hsuan-yu as saying that 1,148 hectares of solar sites had been registered in Qigu, about one tenth of the district..Secondhand account
- Wang Pi-chu, youth community representative of Sangu Village: 「沒有(養殖)產業就不會有人住⋯⋯我好像可以預見20年後,這裡過年都沒有人煙,只有光電板。」 ("Without the [aquaculture] industry nobody will live here… I can almost foresee that in 20 years there won't be a soul here even at Lunar New Year, only solar panels.") R021Source報導者 [The Reporter],〈當光電包圍漁村:七股漁電共生風波再起,居民在抗議什麼?〉["When Solar Surrounds a Fishing Village: The Qigu Fishery–Solar Controversy Flares Again. What Are Residents Protesting?"](文字林雨佑 [text by Lin Yu-yu (林雨佑)]),2022-11-10Original URLhttps://www.twreporter.org/a/qigu-fishery-electricity-symbiosisRetrieved2026-10-30Snapshot timestamp—Share of land: The Reporter in 2022 relayed Shen Hsuan-yu as saying that 1,148 hectares of solar sites had been registered in Qigu, about one tenth of the district..Secondhand account
- On the scene of the 2022-11-03 trip north to petition (PTS News): Huang Yen-kuo (黃嚴國), former chief of Shifen Village: 「我們的漁民感到非常地憤怒,因為黃偉哲都在欺騙我們漁民。」 ("Our fishers are extremely angry, because Huang Wei-che has been deceiving our fishers all along.") Chiu Chuang-yi (邱創禕), a Qigu fisher: 「政府一直在鼓勵青年要返鄉,但是我們現在的租金一直漲,我們連魚塭都租不到。」 ("The government keeps encouraging young people to return home, but our rents keep rising and we can't even rent a fish pond.") Huang Hsien-li, chief of Sangu Village: 「對我們七股這片土地跟我們的居民,一直在霸凌。」 ("They have kept bullying this land of ours in Qigu and our residents.") R072Source公視新聞網 [PTS News Network],〈不滿光電無限制開發 七股居民北上總統府抗議〉["Unhappy with Unrestricted Solar Development, Qigu Residents Go North to Protest at the Presidential Office"] (2022-11-03)Original URLhttps://news.pts.org.tw/article/607604Retrieved2026-11-06Snapshot timestamp—News report..Secondhand account
- 2022-10-27, Taiwan Environmental Information Center report: city councilor candidate Chiang Chi-chun (蔣琦君) said 「難道七股民眾是次等公民嗎?」 ("Are the people of Qigu second-class citizens?") R020Source環境資訊中心 [Taiwan Environmental Information Center],〈七股一成土地將蓋光電民怨搶地 經濟部承諾設總量管制〉["Solar to Cover a Tenth of Qigu's Land as Residents Protest Land Grabs; Ministry of Economic Affairs Pledges a Total Cap"] (Lee Su-chun (李蘇竣), 2022-11-04) and 8 other articles (9 in all)Original URLhttps://e-info.org.tw/node/235393Retrieved2026-11-06Snapshot timestamp—News reports (each article opened and read: China Times, NOWnews, Liberty Times, PTS, Taiwan Environmental Information Center, and others, 9 articles)..Secondhand account
- Lee Shu-wei (李書緯), senior manager of the business department of the developer HD Renewable Energy (泓德能源): 「主要是他們(指佔有戶)沒有意願回來(養殖),不是公司拒絕。」 ("Mainly it's that they [the occupants] have no wish to come back [to aquaculture]; it's not that the company refused.") R021Source報導者 [The Reporter],〈當光電包圍漁村:七股漁電共生風波再起,居民在抗議什麼?〉["When Solar Surrounds a Fishing Village: The Qigu Fishery–Solar Controversy Flares Again. What Are Residents Protesting?"](文字林雨佑 [text by Lin Yu-yu (林雨佑)]),2022-11-10Original URLhttps://www.twreporter.org/a/qigu-fishery-electricity-symbiosisRetrieved2026-10-30Snapshot timestamp—Share of land: The Reporter in 2022 relayed Shen Hsuan-yu as saying that 1,148 hectares of solar sites had been registered in Qigu, about one tenth of the district..Account by an involved party
Discrepancies in the records
First items: Three figures for the compensation value…Land area of the Taisugar Qigu project: …Announcement date of the first batch of …MoreLess
- Three figures for the compensation value of Taisugar's trees; see the comparison of accounts on the Qigu Solar Development page R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—.Official record
- Land area of the Taisugar Qigu project: the Control Yuan writes that 146 hectares of lowland afforestation had to be deregistered R002Source監察院調查報告 [Control Yuan investigation report] 112財調0019(2023-06-07 審議,糾正)[(deliberated 2023-06-07; corrective measure)]:台糖公司配合太陽光電計畫出租七股農場農地,造林地改光電 [Taisugar leased farmland on its Qigu Farm in support of the solar photovoltaic program, converting afforested land to solar]Original URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—Official record; the Commercial Times writes that Taisugar publicly tendered 206.99 hectares of non-arable land in Qigu in 2019 R015Source工商時報 [Commercial Times](記者 [reporter] Shen Mei-hsing (沈美幸)),中興電台糖七股光電南案場併聯報導 [report on grid connection of the southern site of Chung Hsin Electric's Taisugar Qigu solar project],2021-06-24(經濟部能源署再生能源資訊網轉載)[(reposted on the MOEA Energy Administration's renewable energy information website)]Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—Secondhand account. The two use different bases of calculation.
- Announcement date of the first batch of fishery–solar co-location priority areas: the Executive Yuan Gazette gives 2020-11-16 R011Source行政院公報 [Executive Yuan Gazette],經濟部、行政院農業委員會公告 [joint announcement of the Ministry of Economic Affairs and the Council of Agriculture, Executive Yuan]〈嘉義縣及臺南市可優先推動漁業經營結合綠能之區位範圍〉["Areas in Chiayi County and Tainan City Where Combining Fishery Operations with Green Energy May Be Prioritized"](經能字第10904605750號、農漁字第1091223634號),2020-11-16Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg026218/ch04/type3/gov31/num14/Eg.htmRetrieved2026-10-30Snapshot timestamp—Official record; the Taiwan Environmental Information Center reported it on 2020-11-19 (the text says it was announced on "the 16th") R012Source環境資訊中心 [Taiwan Environmental Information Center],〈全國魚塭劃「漁電共生先行區」 首波公告嘉義、台南2626公頃 環社檢核過第一關〉["Fish Ponds Nationwide Zoned as 'Fishery–Solar Co-location Priority Areas'; First Batch of 2,626 Hectares in Chiayi and Tainan Announced After Passing the First Environmental and Social Review"](記者 [reporter] Hsu Tsu-ling (許祖菱)),2020-11-19Original URLhttps://e-info.org.tw/node/228071Retrieved2026-10-30Snapshot timestamp—Secondhand account; a 2024 Ministry of Agriculture presentation lists it as 2020-11-26 R014Source農業部農村發展及水土保持署農村規劃組 [Ministry of Agriculture, Agency of Rural Development and Soil and Water Conservation, Rural Planning Division],〈農業綠能法規及近期函釋說明〉簡報 [presentation, "Explanation of Agricultural Green Energy Regulations and Recent Interpretive Letters"],2024-07,頁 20 [p. 20]Original URLhttps://isdistorages.blob.core.windows.net/materials/240711-0902_11307-%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD%E6%B3%95%E8%A6%8F%E5%8F%8A%E8%BF%91%E6%9C%9F%E5%87%BD%E9%87%8B%E8%AA%AA%E6%98%8E(%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD).pdfRetrieved2026-10-30Snapshot timestamp—Official record.
- Announcement date of the Qigu District priority area: Executive Yuan Gazette vol. 28, no. 230 gives 2022-12-02 R005Source行政院公報 [Executive Yuan Gazette]:第 024 卷第 093 期 [vol. 24, no. 93](2018-05-21 漁電共生試驗專案計畫作業原則)[(2018-05-21, Operating Principles for Fishery–Solar Co-location Pilot Projects)]、第 028 卷第 230 期 [vol. 28, no. 230](2022-12-02 七股區可優先推動漁業經營結合綠能之區位範圍)[(2022-12-02, areas in Qigu District where combining fishery operations with green energy may be prioritized)]、第 029 卷第 182 期 [vol. 29, no. 182](2023-09-25 廢止作業原則)[(2023-09-25, repeal of the operating principles)]Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—; a 2024 Ministry of Agriculture presentation lists it as 2022-12-01 R014Source農業部農村發展及水土保持署農村規劃組 [Ministry of Agriculture, Agency of Rural Development and Soil and Water Conservation, Rural Planning Division],〈農業綠能法規及近期函釋說明〉簡報 [presentation, "Explanation of Agricultural Green Energy Regulations and Recent Interpretive Letters"],2024-07,頁 20 [p. 20]Original URLhttps://isdistorages.blob.core.windows.net/materials/240711-0902_11307-%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD%E6%B3%95%E8%A6%8F%E5%8F%8A%E8%BF%91%E6%9C%9F%E5%87%BD%E9%87%8B%E8%AA%AA%E6%98%8E(%E8%BE%B2%E6%A5%AD%E7%B6%A0%E8%83%BD).pdfRetrieved2026-10-30Snapshot timestamp—.Official record
- Chen Chi-yu's title: the Control Yuan writes 「臺鹽綠能前董事長」 ("former chairman of Taiyen Green Energy") R041Source監察院調查 [Control Yuan investigations]:114司調0019(2025-07-09,臺鹽綠能前董事長陳啟昱案)[(2025-07-09, the case of Chen Chi-yu (陳啟昱), former chairman of Taiyen Green Energy)]、115財調0026(2026-07-23,丹娜絲颱風光電災損)[(2026-07-23, solar installations damaged by Typhoon Danas)]、111財調0034(2022-09-07,北門蘆竹溝光電場)[(2022-09-07, the Luzhugou solar farm in Beimen)]Original URLhttps://www.cy.gov.tw/Retrieved2026-10-19Snapshot timestamp—Official record; the China Daily News writes 「前台鹽董事長」 ("former chairman of Taiyen") R038Source中華日報 [China Daily News],臺鹽綠能案起訴 5 人報導 [report on the indictment of 5 people in the Taiyen Green Energy case],2025-02-27Original URLhttps://www.cdns.com.tw/articles/1175314Retrieved2026-10-30Snapshot timestamp—Secondhand account.
- There are two sets of figures for the scale of the Yabisi Dachaogou project in Qigu: the 2021-08-04 application was for 58.22 hectares and 76.517 MW R016Source臺南市政府函 [Tainan City Government letter](府經能字第1101066383號,2021-08-31)復臺南市議會 [in reply to the Tainan City Council],雅比斯光電七股大潮溝案與新平能源將軍北門案 [on the Yabisi Solar Dachaogou case in Qigu and the Xinping Energy case in Jiangjun and Beimen](議會議事附件 [council meeting attachment])Original URLhttps://bill.tncc.gov.tw/NoPaperMeeting_TNCC/Upload/OutlineItemFile/4db4a77b-0b3d-498f-9435-83dccce33d5c.pdfRetrieved2026-10-30Snapshot timestamp—; the 2022 application was for 7 parcels of state-owned land and 98.89 MW R018Source最高行政法院 [Supreme Administrative Court] 113 年度上字第 479 號判決 [Judgment 113-Shang No. 479](雅比斯光電對臺南市政府,廢止許可 [Yabisi Solar v. Tainan City Government, revocation of approval]),2026-01-15Original URLhttps://judgment.judicial.gov.tw/FJUD/data.aspx?ty=JD&id=TPAA,113,%E4%B8%8A,479,20260115,1Retrieved2026-10-30Snapshot timestamp—Mirror: https://lawplayer.com/judgment/TPAA,113,%E4%B8%8A,479,20260115,1_0f1428d62c06d7d0532a366e37ab91f2420e0ce2.Official record These may be two successive applications.
- The share of Qigu's land taken by solar: The Reporter in 2022 relayed Shen Hsuan-yu as saying that 1,148 hectares had been registered, about one tenth R021Source報導者 [The Reporter],〈當光電包圍漁村:七股漁電共生風波再起,居民在抗議什麼?〉["When Solar Surrounds a Fishing Village: The Qigu Fishery–Solar Controversy Flares Again. What Are Residents Protesting?"](文字林雨佑 [text by Lin Yu-yu (林雨佑)]),2022-11-10Original URLhttps://www.twreporter.org/a/qigu-fishery-electricity-symbiosisRetrieved2026-10-30Snapshot timestamp—Share of land: The Reporter in 2022 relayed Shen Hsuan-yu as saying that 1,148 hectares of solar sites had been registered in Qigu, about one tenth of the district.; PTS in 2024 wrote that Qigu is about 「1萬1公頃」 ("10,001 hectares") (sic in the original) and that, according to Economic Development Bureau statistics, solar sites take up a little over 10% R026Source公視新聞網 [PTS News Network](陳奐宇、陳顯坤 [Chen Huan-yu (陳奐宇), Chen Hsien-kun (陳顯坤)]),〈七股開發光電農地魚塭破碎化 萬人連署反對不當種電〉["Solar Development Fragments Qigu's Farmland and Fish Ponds; Ten Thousand Sign Petition Against Improper Solar"],2024-01-04Original URLhttps://news.pts.org.tw/article/674801Retrieved2026-10-30Snapshot timestamp—Share of land: PTS in 2024 wrote that Qigu is about "1萬1公頃" ("10,001 hectares", sic), and that according to Economic Development Bureau statistics solar sites take up a little over 10%.; a 2024 News&Market report wrote 30% R004Source上下游 News&Market 七股漁電共生與光電報導(2018–2026)[reporting on fishery–solar co-location and solar power in Qigu (2018–2026)]Original URLhttps://www.newsmarket.com.tw/Retrieved2026-10-19Snapshot timestamp—Share of land: a 2024 News&Market report wrote that solar covers 30% of Qigu..Secondhand account The bases of calculation differ.
- The roles of Chen Chung-cheng and Huang Chin-shih: China Times on 2022-10-27 called Huang Chin-shih head of the Qigu District Village Chiefs' Association and Huang Hsien-li its deputy head R020Source環境資訊中心 [Taiwan Environmental Information Center],〈七股一成土地將蓋光電民怨搶地 經濟部承諾設總量管制〉["Solar to Cover a Tenth of Qigu's Land as Residents Protest Land Grabs; Ministry of Economic Affairs Pledges a Total Cap"] (Lee Su-chun (李蘇竣), 2022-11-04) and 8 other articles (9 in all)Original URLhttps://e-info.org.tw/node/235393Retrieved2026-11-06Snapshot timestamp—News reports (each article opened and read: China Times, NOWnews, Liberty Times, PTS, Taiwan Environmental Information Center, and others, 9 articles).; PTS on 2024-01-04 called Chen Chung-cheng head of the Qigu District Village Chiefs' Association R026Source公視新聞網 [PTS News Network](陳奐宇、陳顯坤 [Chen Huan-yu (陳奐宇), Chen Hsien-kun (陳顯坤)]),〈七股開發光電農地魚塭破碎化 萬人連署反對不當種電〉["Solar Development Fragments Qigu's Farmland and Fish Ponds; Ten Thousand Sign Petition Against Improper Solar"],2024-01-04Original URLhttps://news.pts.org.tw/article/674801Retrieved2026-10-30Snapshot timestamp—Share of land: PTS in 2024 wrote that Qigu is about "1萬1公頃" ("10,001 hectares", sic), and that according to Economic Development Bureau statistics solar sites take up a little over 10%.; the description of a 2020-06-24 video on this site calls Huang Chin-shih head of the village chiefs' association. This may reflect a change of term; the dates of the change and the terms of office are not found in public records and are Unverified.Unverified
- How the 2022-11-03 trip north to petition was convened: the reports' wording differs; China Times, NOWnews, and the Liberty Times say the alliance 「號召」 or 「發起」 (called or launched) it, and the public hearing was convened by Legislators Kuo Kuo-wen and Hung Shen-han; in a check of 9 reports, wording such as 「郭國文帶隊」 ("led by Kuo Kuo-wen") or 「黃仙立率隊」 ("led by Huang Hsien-li") was not found R020Source環境資訊中心 [Taiwan Environmental Information Center],〈七股一成土地將蓋光電民怨搶地 經濟部承諾設總量管制〉["Solar to Cover a Tenth of Qigu's Land as Residents Protest Land Grabs; Ministry of Economic Affairs Pledges a Total Cap"] (Lee Su-chun (李蘇竣), 2022-11-04) and 8 other articles (9 in all)Original URLhttps://e-info.org.tw/node/235393Retrieved2026-11-06Snapshot timestamp—News reports (each article opened and read: China Times, NOWnews, Liberty Times, PTS, Taiwan Environmental Information Center, and others, 9 articles)..Secondhand account
See also
- Qigu Solar Development⚖︎Disputes over solar on Qigu's salt fields, fish ponds and plantationsContains 12 items
- QiguDistrict of Tainan, spoonbill wintering ground
- Annan District Fishery–Solar Co-location Application and Review ProcessThe fishery–solar procedure announced by the Annan District Office
Reports that mention it
Hall of the Present6.4Present conditions and institutions / Industrial parks and pollution
Fishery–Solar Co-location and Solar Power
Milkfish farming area has shrunk by a third in ten years, 330 hectares of fish farm ponds sit on illegal land-use categories, and no solar panels are to go west of Provincial Highway 61. Yet not one of the fishery–solar and ground-mounted solar projects in this area has an EIA case number — not because environmental impact assessment failed to do its job, but because the law at the time did not require one.
Continue from here
- Qigu: other TermsSeasonal Shellfish Harvesting in the Black-faced Spoonbill Ecological Protection Area⚖︎Seasonal harvest openings in the Shifen Black-faced Spoonbill reserve
- Took place atQigu Solar Development⚖︎Disputes over solar on Qigu's salt fields, fish ponds and plantationsContains 12 items
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items