Provincial Highway 61

Official recordLocal oral accountSecondhand account
721

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Provincial Highway 61 (the West Coast Expressway) is an expressway along Taiwan's west coast whose Tainan section currently ends at the Shifen Interchange in Qigu District; the Zengwen River Bridge, which will cross the river to meet Taijiang Boulevard in Annan District, broke ground in December 2022 and is expected to be finished by the end of 2029.R001Source維基百科 [Chinese Wikipedia] 〈西部濱海快速公路〉 [West Coast Expressway] (opening dates of each section in Tainan)Original URLhttps://zh.wikipedia.org/zh-tw/%E5%8F%B061%E7%B7%9ARetrieved2026-10-26Snapshot timestamp(None, or not applicable)Database, secondary source; used only as a secondhand source for opening dates.

Category
Places
Related reports
4 reports
Also known as
西濱快速公路、台61線曾文溪橋、曾文溪景觀大橋、West Coast Expressway、Provincial Highway 61 Zengwen River Bridge、Zengwen River Landmark Bridge

Within Tainan City, Provincial Highway 61 (the West Coast Expressway) currently runs as far as the Shifen Interchange in Qigu District: the frontage roads from Qigu to Shifen opened first on 2007-11-22, and the elevated main line opened on 2017-11-11 (R001) (R002). South of Shifen, the Zengwen River Bridge construction project, which crosses the Zengwen River to connect with Taijiang Boulevard in Annan District, broke ground in December 2022 and is about 3.38 km long in total (R003) (R004); because of Typhoon Gaemi in 2024 and labor shortages, completion is now expected at the end of 2029 (R005) (R006). Until it opens, traffic from Qigu to Annan still has to exit at Shifen and detour via the Guoxing Bridge (R007).

Route

  1. In Tainan its southern end is currently the Shifen Interchange (十份交流道) in Qigu District (七股區). South of Shifen, City Road 173 (市道 173 號) and Provincial Highway 17 (台 17 線) serve as substitutes for now (R001).
  2. Zengwen River Bridge (曾文溪橋; under construction) (R003, R004):
    1. Endpoints: from the Shifen Interchange in Qigu across the Zengwen River (曾文溪), connecting with Taijiang Boulevard (台江大道) in Annan District.
    2. Scale: about 3.38 km in total (bridge 3,150 m, embankment 230 m).
    3. Budget: revised from NT$6.636 billion to NT$9.627 billion.
  3. The western section of Taijiang Boulevard opened in full on 2017-03-12, and its western end has already been built up to the south embankment of the Zengwen River precisely so that it can connect with the Zengwen River Bridge in the future (R003).

History

2 itemsFirst items: Qigu section (R001, R002):Key events:MoreLess
  1. Qigu section (R001, R002):
    1. 2007-11-22: the main line from the Beimen Interchange (北門交流道) to the Qigu Interchange (七股交流道), and the frontage roads from the Qigu Interchange to the Shifen Interchange, opened.
    2. Construction began 2013-06 and was completed 2017-09: the elevated main line from the Qigu Interchange to the Shifen Interchange, 7.14 km, costing NT$3.9 billion, 「兩側還有高架橋下的平面道路」 ("with surface roads beneath the viaduct on both sides").
    3. 2017-11-11: the main line from Qigu to Shifen opened.
  2. Key events:
    1. 2007-11-22: the frontage roads from the Qigu Interchange to the Shifen Interchange open (R001).
    2. 2011-05-10: the Control Yuan issues a corrective measure against the Directorate General of Highways over the slag backfill of the Qigu-section roadbed (R009).
    3. 2017-11-11: the elevated main line from Qigu to Shifen opens (R001, R002).
    4. 2022-07: the Zengwen River Bridge construction project is approved by the Executive Yuan (行政院) (R003).
    5. 2022-12: the Zengwen River Bridge breaks ground; the groundbreaking date is given as either 12-04 or 12-20 (R004, R001).
    6. 2024: reservoir discharges during Typhoon Gaemi (凱米颱風) wash away the temporary construction bridge and fencing (R005).
    7. 2026-06: progress at 56.70%, aiming for completion by the end of ROC year 118 (2029) (R006).

Transport

  1. Until the Zengwen River Bridge opens, traffic from Qigu to Annan must exit at Shifen, take City Road 173, and then cross the Guoxing Bridge (國姓大橋) (R007).
  2. Local resident's oral account: the "Taijiang section of Provincial Highway 61" as locals describe it is very new, has a surface road beneath it, and fishers often drive through carrying fish and oysters (R008). Local oral account According to online sources, Provincial Highway 61 has not yet entered Annan District, so this road may be the viaduct and frontage roads of the Qigu–Shifen section, or the western section of Taijiang Boulevard; which section is meant is awaiting confirmation.

Controversies

The roadbed fill of the Qigu section was found to contain furnace slag and dust-collector ash; the case came to light in 2010, and on 2011-05-10 the Control Yuan issued a corrective measure (100交正0009) against the Directorate General of Highways, Ministry of Transportation and Communications; see 〈Provincial Highway 61 Qigu Section Slag Backfill Case〉 (R009).

See also

Reports that mention it

Hall of Ecology5.3bEcology / Habitats

The Two Faces of the Qingcaolun Seawall

Behind the seawall lie land crabs and the windbreak forest; outside it lies the southernmost limit of the Formosan fiddler crab's range in Taiwan — a mudflat being squeezed between illegal fish farm ponds and a bridge pier about to go under construction.

1964

Hall of Ecology5.6Ecology / Protected areas and disputes

Climate Change and the Legal Framework

Sea level is rising 3.4 mm per year, and under a 2℃ scenario 3.29 percent of Tainan would be flooded. The Provincial Highway 61 controversy now has an added layer: its bridge piers land on the southernmost habitat of the Formosan fiddler crab in Taiwan.

2042

Hall of the Present6.4Present conditions and institutions / Industrial parks and pollution

Fishery–Solar Co-location and Solar Power

Milkfish farming area has shrunk by a third in ten years, 330 hectares of fish farm ponds sit on illegal land-use categories, and no solar panels are to go west of Provincial Highway 61. Yet not one of the fishery–solar and ground-mounted solar projects in this area has an EIA case number — not because environmental impact assessment failed to do its job, but because the law at the time did not require one.