Wang Mei-yu

Official recordSecondhand account
222

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Wang Mei-yu is a member of the Control Yuan from the fifth term, who with Yang Mei-ling and Lin Ya-feng investigated the liquidation of RSEA Engineering (land payments for the Tainan Technology Industrial Park) and with Yeh Ta-hua the Taiyen Green Energy case.R001Source監察院 [Control Yuan], investigation report by members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒) and Wang Mei-yu (王美玉) (on the liquidation of RSEA Engineering Corporation listed in the National Audit Office's audit report on the central government general final accounts for ROC year 104)Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/44652Retrieved2026-10-30Snapshot timestamp(None, or not applicable)

Wang Mei-yu (王美玉) is a member of the Control Yuan, listed in 2014 among the new nominees for its fifth term [R003] and described in a 2026 report as a "former Control Yuan member" [R004].

Wang Mei-yu (王美玉) is a member of the Control Yuan, listed in 2014 among the new nominees for its fifth term R003Source風傳媒 [Storm Media], report listing the nominees for President, Vice President and members of the 5th Control Yuan, 2014Original URLhttps://www.storm.mg/article/30856Retrieved2026-10-30Snapshot timestamp— and described in a 2026 report as a "former Control Yuan member" R004Source聯合報 [United Daily News] (reporter Tsai Chin-yu, 蔡晉宇),〈調查報導/第六屆監委績效不佳 「跟陳菊作風有關」〉[Investigative Report: Poor Performance by the 6th Control Yuan "Linked to Chen Chu's Style"], 2026-09-28Original URLhttps://udn.com/news/story/6656/9780571Retrieved2026-10-30Snapshot timestamp—. Secondhand account With Yang Mei-ling and Lin Ya-feng, Wang Mei-yu investigated the liquidation of RSEA Engineering; the report records that NT$2.358 billion in lease payments for land in the Tainan Technology Industrial Park were paid out or settled by termination agreements in May 2017 after the investigation R001Source監察院 [Control Yuan], investigation report by members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒) and Wang Mei-yu (王美玉) (on the liquidation of RSEA Engineering Corporation listed in the National Audit Office's audit report on the central government general final accounts for ROC year 104)Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/44652Retrieved2026-10-30Snapshot timestamp—; with Yeh Ta-hua, Wang Mei-yu also investigated the case of Chen Chi-yu, former chairman of Taiyen Green Energy R002Source監察院 [Control Yuan] investigations: 114司調0019 (2025-07-09, case of former Taiyen Green Energy chairman Chen Chi-yu), 115財調0026 (2026-07-23, solar damage from Typhoon Danas), 111財調0034 (2022-09-07, Luzhugou solar farm in Beimen)Original URLhttps://www.cy.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record

Life

  1. Listed as a new nominee in the roster of nominees for the 5th Control Yuan R003Source風傳媒 [Storm Media], report listing the nominees for President, Vice President and members of the 5th Control Yuan, 2014Original URLhttps://www.storm.mg/article/30856Retrieved2026-10-30Snapshot timestamp—. Secondhand account

Activities

  1. Tainan Technology Industrial Park: with Yang Mei-ling (楊美鈴) and Lin Ya-feng (林雅鋒) Wang Mei-yu investigated the liquidation of RSEA Engineering Corporation (榮民工程公司). The report records that by the end of 2014 RSEA had completed collection of NT$2.358 billion in land rental proceeds under the 006688 measures at the Tainan Technology Industrial Park (臺南科技工業區), which the Industrial Development Bureau had not paid over; after the investigation, the transfer or a mutual termination agreement was completed in 2017-05 R001Source監察院 [Control Yuan], investigation report by members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒) and Wang Mei-yu (王美玉) (on the liquidation of RSEA Engineering Corporation listed in the National Audit Office's audit report on the central government general final accounts for ROC year 104)Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/44652Retrieved2026-10-30Snapshot timestamp—. Official record
  2. Qigu solar: with Yeh Ta-hua (葉大華) Wang Mei-yu investigated the Taiyen Green Energy case (114司調0019, 2025-07-09, the case of former Taiyen Green Energy chairman Chen Chi-yu (陳啟昱)) R002Source監察院 [Control Yuan] investigations: 114司調0019 (2025-07-09, case of former Taiyen Green Energy chairman Chen Chi-yu), 115財調0026 (2026-07-23, solar damage from Typhoon Danas), 111財調0034 (2022-09-07, Luzhugou solar farm in Beimen)Original URLhttps://www.cy.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
  3. In a 2026 United Daily News investigative report Wang Mei-yu said that 「專注在特定領域的監委」 ("Control Yuan members who focus on a particular field") generally achieve a certain level of investigative performance R004Source聯合報 [United Daily News] (reporter Tsai Chin-yu, 蔡晉宇),〈調查報導/第六屆監委績效不佳 「跟陳菊作風有關」〉[Investigative Report: Poor Performance by the 6th Control Yuan "Linked to Chen Chu's Style"], 2026-09-28Original URLhttps://udn.com/news/story/6656/9780571Retrieved2026-10-30Snapshot timestamp—. Secondhand account

See also

Reports that mention it

Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution

The Chengxi Landfill and Incinerator

Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.

26116

Hall of the Present6.4Present conditions and institutions / Industrial parks and pollution

Fishery–Solar Co-location and Solar Power

Milkfish farming area has shrunk by a third in ten years, 330 hectares of fish farm ponds sit on illegal land-use categories, and no solar panels are to go west of Provincial Highway 61. Yet not one of the fishery–solar and ground-mounted solar projects in this area has an EIA case number — not because environmental impact assessment failed to do its job, but because the law at the time did not require one.

19174

Continue from here

Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.