Chiang Yi-fu (江義福) is chairman of Chung-Hsin Electric and Machinery Manufacturing Corp. (中興電工), according to a 2021 report; the company built the southern site of the Taisugar Qigu solar farm [R001].
Chiang Yi-fu (江義福) is chairman of Chung-Hsin Electric and Machinery Manufacturing Corp. (中興電工), according to a 2021 report. The Commercial Times reported in June 2021 that the southern site of the Taisugar Qigu solar farm built by Chung-Hsin Electric was connected to the grid that day, with a total capacity of 216 MW R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—. Secondhand account Taisugar's lease of its Qigu farm for solar development drew a corrective measure from the Control Yuan in 2023 R002Source監察院調查報告 112財調0019 [Control Yuan investigation report 112-Tsai-Tiao-0019] (deliberated 2023-06-07, corrective measures): Taisugar leasing farmland at the Qigu Farm for the solar program, converting afforested land to solarOriginal URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—. Official record
Life
- Position: chairman, Chung Hsin Electric R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—. Secondhand account
Activities
- 2021-06-24 The 67.85 MW south site of Chung Hsin Electric's Taisugar Qigu solar project was connected to the grid that day; the 113.16 MW north site was expected to connect on 06-30, for a total of 216 MW; Chung Hsin Electric chairman Chiang Yi-fu R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—. Secondhand account
- Companies involved in the Qigu Farm solar project: Taiwan Sugar Corporation (Qigu Farm), Chung Hsin Electric (chairman Chiang Yi-fu), Tianpeng Energy, Tianchong Energy, Tianqin Energy, and Xingwei Power R002Source監察院調查報告 112財調0019 [Control Yuan investigation report 112-Tsai-Tiao-0019] (deliberated 2023-06-07, corrective measures): Taisugar leasing farmland at the Qigu Farm for the solar program, converting afforested land to solarOriginal URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—R003Source經濟部能源署 [Energy Administration, Ministry of Economic Affairs], register of construction permits for renewable energy generation equipment (ROC years 109–111 [2020–2022])Original URLhttps://www.moeaea.gov.tw/ECW/populace/content/wHandMenuFile.ashx?file_id=14159Retrieved2026-10-30Snapshot timestamp—R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—. Official record
- A 2023 Control Yuan investigation report moved corrective measures over Taisugar's leasing of Qigu Farm farmland for the solar program and the conversion of afforested land to solar R002Source監察院調查報告 112財調0019 [Control Yuan investigation report 112-Tsai-Tiao-0019] (deliberated 2023-06-07, corrective measures): Taisugar leasing farmland at the Qigu Farm for the solar program, converting afforested land to solarOriginal URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—. Official record
- See Qigu solar development and 6.4.
See also
Reports that mention it
Hall of the Present6.4Present conditions and institutions / Industrial parks and pollution
Fishery–Solar Co-location and Solar Power
Milkfish farming area has shrunk by a third in ten years, 330 hectares of fish farm ponds sit on illegal land-use categories, and no solar panels are to go west of Provincial Highway 61. Yet not one of the fishery–solar and ground-mounted solar projects in this area has an EIA case number — not because environmental impact assessment failed to do its job, but because the law at the time did not require one.
Continue from here
- Qigu: other PeopleChiu Yu-wenMalacologist and aquatic ecologist
- Related entriesQigu Solar Development⚖︎Disputes over solar on Qigu's salt fields, fish ponds and plantationsContains 12 items
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.