Chiang Yi-fu

Secondhand account
211

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Chiang Yi-fu is chairman of Chung-Hsin Electric and Machinery, named as chairman in 2021 reports on the grid connection of the Taisugar Qigu solar farm built by the company.R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp(None, or not applicable)

Category
People
Area
Qigu
Related reports
1 reports
Also known as
江義福
Related subpages
6.4

Chiang Yi-fu (江義福) is chairman of Chung-Hsin Electric and Machinery Manufacturing Corp. (中興電工), according to a 2021 report; the company built the southern site of the Taisugar Qigu solar farm [R001].

Chiang Yi-fu (江義福) is chairman of Chung-Hsin Electric and Machinery Manufacturing Corp. (中興電工), according to a 2021 report. The Commercial Times reported in June 2021 that the southern site of the Taisugar Qigu solar farm built by Chung-Hsin Electric was connected to the grid that day, with a total capacity of 216 MW R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—. Secondhand account Taisugar's lease of its Qigu farm for solar development drew a corrective measure from the Control Yuan in 2023 R002Source監察院調查報告 112財調0019 [Control Yuan investigation report 112-Tsai-Tiao-0019] (deliberated 2023-06-07, corrective measures): Taisugar leasing farmland at the Qigu Farm for the solar program, converting afforested land to solarOriginal URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—. Official record

Life

  1. Position: chairman, Chung Hsin Electric R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—. Secondhand account

Activities

  1. 2021-06-24 The 67.85 MW south site of Chung Hsin Electric's Taisugar Qigu solar project was connected to the grid that day; the 113.16 MW north site was expected to connect on 06-30, for a total of 216 MW; Chung Hsin Electric chairman Chiang Yi-fu R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—. Secondhand account
  2. Companies involved in the Qigu Farm solar project: Taiwan Sugar Corporation (Qigu Farm), Chung Hsin Electric (chairman Chiang Yi-fu), Tianpeng Energy, Tianchong Energy, Tianqin Energy, and Xingwei Power R002Source監察院調查報告 112財調0019 [Control Yuan investigation report 112-Tsai-Tiao-0019] (deliberated 2023-06-07, corrective measures): Taisugar leasing farmland at the Qigu Farm for the solar program, converting afforested land to solarOriginal URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—R003Source經濟部能源署 [Energy Administration, Ministry of Economic Affairs], register of construction permits for renewable energy generation equipment (ROC years 109–111 [2020–2022])Original URLhttps://www.moeaea.gov.tw/ECW/populace/content/wHandMenuFile.ashx?file_id=14159Retrieved2026-10-30Snapshot timestamp—R001Source工商時報 [Commercial Times] (reporter Shen Mei-hsing (沈美幸)), report on the grid connection of Chung Hsin Electric's Taisugar Qigu solar south site, 2021-06-24 (reprinted on the Energy Administration's renewable energy website)Original URLhttps://ea02.moeaea.gov.tw/d0308/news/more.aspx?cid=198&id=4032Retrieved2026-10-30Snapshot timestamp—. Official record
  3. A 2023 Control Yuan investigation report moved corrective measures over Taisugar's leasing of Qigu Farm farmland for the solar program and the conversion of afforested land to solar R002Source監察院調查報告 112財調0019 [Control Yuan investigation report 112-Tsai-Tiao-0019] (deliberated 2023-06-07, corrective measures): Taisugar leasing farmland at the Qigu Farm for the solar program, converting afforested land to solarOriginal URLhttps://www.cy.gov.tw/CyBsBoxContent.aspx?n=133&s=28316Retrieved2026-10-19Snapshot timestamp—. Official record
  4. See Qigu solar development and 6.4.

See also

Reports that mention it

Hall of the Present6.4Present conditions and institutions / Industrial parks and pollution

Fishery–Solar Co-location and Solar Power

Milkfish farming area has shrunk by a third in ten years, 330 hectares of fish farm ponds sit on illegal land-use categories, and no solar panels are to go west of Provincial Highway 61. Yet not one of the fishery–solar and ground-mounted solar projects in this area has an EIA case number — not because environmental impact assessment failed to do its job, but because the law at the time did not require one.

19174

Continue from here

Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.