The Tainan Technology Industrial Park is an industrial park developed by the Industrial Development Bureau of the Ministry of Economic Affairs on filled-in land of the Sicao and Anshun salt fields in Annan District, Tainan; it is now called the Tainan Industrial Park.R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Current status
- Now called the Tainan Industrial Park, with development concentrated in the East Section of about 494 hectares; the Ministry of the Interior approved a site-specific urban plan change for Phase 4-2, the East Section's only undeveloped phase, in 2018, and the sixth environmental impact difference analysis completed review on 2021-12-22 R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.
- Key figures
- 1,146 hectaresOriginally planned areaR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- 706.87 / 457.87 hectaresDesignated / developed area in 2011R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.
- about 493.86 hectaresEast Section area (2018)R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp(None, or not applicable)
- 30 of 170 hectares availableLand actually leased or sold in 2001R007Source監察院 [Control Yuan], text of the corrective measure proposed by Control Yuan members Huang Huang-hsiung (黃煌雄), Chao Jung-yao (趙榮耀), and Yin Shih-hao (尹士豪) against the Executive Yuan (lack of overall planning in the supply of industrial land), 2001-11-30Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/23428Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Vertical-text edition of the same document: https://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/54457
- Evidence mix
Why it matters
The Sicao Wildlife Reserve grew out of this industrial park's environmental impact assessment: in 1993 the Environmental Protection Administration's review conclusion found that "the Sicao area within the project area is one of the four great waterbird sites on the main island" and required a wildlife refuge to be designated before construction R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.{{官方文獻}} Today's black-winged stilt breeding area (A1) lies at the northern end of the park's East Section R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—, and the Anshun salt fields stopped producing salt when the park began construction and were later taken into Taijiang National Park R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—.
Main actors
Developers 2
- Industrial Development Bureau, Ministry of Economic AffairsDeveloperR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- RSEA Engineering CorporationHandled land-lease payments under the 006688 schemeR009Source監察院 [Control Yuan], investigation report by Control Yuan members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒), and Wang Mei-yu (王美玉) (on the liquidation of RSEA Engineering Corporation listed in the 審計部 [National Audit Office] audit report on the 2015 (ROC year 104) central government final accounts)Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/44652Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
Central government 2
- Environmental Protection Administration1993 review conclusion; in 2018 its preliminary review agreed to drop the effluent conductivity limitR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Ministry of the InteriorApproved the site-specific change to Area A12 for Phase 4-2 in 2018R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp(None, or not applicable)
Local government 2
- Tainan City GovernmentProclaimed the Sicao Wildlife Reserve on 1994-11-30 (another account names the Council of Agriculture)R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL(None, or not applicable)Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Hsu Tain-tsair, Chen Chi-sungTainan mayor and Construction Bureau director; in 2006 helped Anping Industrial Park firms move to the technology parkR013Source環境資訊中心 [Taiwan Environmental Information Center] (excerpting a 聯合報 [United Daily News] Tainan report), 〈安平工業區轉型 市長扮推手〉[Anping Industrial Park in Transition, with the Mayor as Driving Force], 2006-09-07Original URLhttps://www.e-info.org.tw/node/14035Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
Control Yuan 3
- Huang Huang-hsiung, Chao Jung-yao, Yin Shih-hao2001 corrective measure against the Executive Yuan for lacking an overall plan for industrial land supplyR007Source監察院 [Control Yuan], text of the corrective measure proposed by Control Yuan members Huang Huang-hsiung (黃煌雄), Chao Jung-yao (趙榮耀), and Yin Shih-hao (尹士豪) against the Executive Yuan (lack of overall planning in the supply of industrial land), 2001-11-30Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/23428Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Vertical-text edition of the same document: https://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/54457
- Chou Yang-shan, Lee Ping-nan, Ma Yi-kung2012 investigation report on idle industrial parksR008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.
- Yang Mei-ling, Lin Ya-feng, Wang Mei-yuInvestigation of the liquidation of RSEA Engineering CorporationR009Source監察院 [Control Yuan], investigation report by Control Yuan members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒), and Wang Mei-yu (王美玉) (on the liquidation of RSEA Engineering Corporation listed in the 審計部 [National Audit Office] audit report on the 2015 (ROC year 104) central government final accounts)Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/44652Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
Environmental groups 1
- Wetlands TaiwanManages Sicao Area A1R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL(None, or not applicable)Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
National park 1
- Taijiang National Park HeadquartersRecorded how the Anshun salt fields stopped production because of the parkR011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp(None, or not applicable)
Points of contention
These are the questions people have argued over. Each side's account is set out as stated; this site does not rule on them.
1Should the Sicao salt fields be filled in for industry, or left to the waterbirds?2
- Industrial Development Bureau
Reclaim the Sicao and Anshun salt fields to develop a 1,146-hectare industrial parkR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- EPA review conclusion (1993)
Sicao is "one of the four great waterbird sites on the main island"; non-priority areas were not to be designated for now, black-faced spoonbill foraging and roosting habitat could not be used as a borrow area, and a refuge had to be designated before constructionR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- Industrial Development Bureau
2Once built, did anyone use the park?3
- Control Yuan (2001 corrective measure)
Of 170 hectares available for lease or sale, only 30 hectares were taken up, "not yet reaching 20%"R007Source監察院 [Control Yuan], text of the corrective measure proposed by Control Yuan members Huang Huang-hsiung (黃煌雄), Chao Jung-yao (趙榮耀), and Yin Shih-hao (尹士豪) against the Executive Yuan (lack of overall planning in the supply of industrial land), 2001-11-30Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/23428Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Vertical-text edition of the same document: https://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/54457
- Control Yuan (2012 investigation report)
706.87 hectares designated and 457.87 hectares developed; the 213-hectare West Section was expected to have its designation revokedR008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp(None, or not applicable)Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.
- Tainan Mayor Hsu Tain-tsair (2006)
Would help some Anping Industrial Park firms move to the technology park, where land cost about NT$50,000 per ping, cheaper than AnpingR013Source環境資訊中心 [Taiwan Environmental Information Center] (excerpting a 聯合報 [United Daily News] Tainan report), 〈安平工業區轉型 市長扮推手〉[Anping Industrial Park in Transition, with the Mayor as Driving Force], 2006-09-07Original URLhttps://www.e-info.org.tw/node/14035Retrieved2026-10-30Snapshot timestamp(None, or not applicable)
- Control Yuan (2001 corrective measure)
Turning points
- 1993-01-13EPA review conclusion: Sicao is one of the four great waterbird sites on the main islandR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- 1994-11-30Sicao Wildlife Reserve proclaimedR003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL(None, or not applicable)Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- 1997Construction began and the Anshun salt fields stopped producing salt (per Taijiang National Park Headquarters)R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp(None, or not applicable)
- 2003Development area reducedR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
- 2018-10-17The Ministry of the Interior approved the urban plan change for Phase 4-2R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp(None, or not applicable)
Where to start reading
- EntrySicao Wildlife ReserveThe Sicao Wildlife Reserve is a wildlife reserve around Sicao in Annan District, first announced in 1994; its current area is 543.1860 ha in three zones, A1, A2 and A3, and its conservation plan was approved in 2025.
- EntryBlack-winged stilt (Himantopus himantopus)The black-winged stilt (Himantopus himantopus) is a wader of the family Recurvirostridae with long bright-red legs, seen year-round in Taijiang; area A1 of the Sicao Wildlife Refuge is also called the "Stilt Breeding Area".
- EntryAnshun Salt FieldThe Anshun Salt Field is a Japanese-era salt field in Yantian Village, Annan District, Tainan, opened in 1919 by the Taiwan Salt Manufacturing Co. on the north shore of Sicao Lake and first called the "Anping Salt Field"; the salt workers' village was relocated in 2002, and the salt-shipping wharf and office were designated a municipal monument in 2003.
- Reports 6.1The Chengxi Landfill and IncineratorFive generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
Full recordBelow is the item-by-item record; every item cites its source.
Relationship map
People involved11
The Tainan Technology Industrial Park (臺南科技工業區), now called the Tainan Industrial Park (台南產業園區), is an industrial park developed by the Industrial Development Bureau of the Ministry of Economic Affairs (經濟部工業局) on land created by filling in the Sicao (四草) and Anshun (安順) salt fields in western Annan District (安南區), Tainan R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—R005Source台南科技工業區概況(面積、用地、廠商與產值)[Overview of the Tainan Technology Industrial Park (area, land use, firms, and output value)]Original URL—Retrieved2026-10-19Snapshot timestamp—R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—. Official record Planning began in the early 1990s (1990 by one account, 1992 by another). In 1993 the Environmental Protection Administration's EIA review conclusion found that "the Sicao area within this plan area is one of the four major waterbird sites on the main island" and required that a wildlife refuge be designated before construction; the Sicao Wildlife Reserve (四草野生動物保護區) was accordingly proclaimed in 1994 R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—. The original plan covered 1,146 hectares; the area was reduced in 2003, a 2012 Control Yuan report lists a designated area of 706.87 hectares, and the East Section covers about 494 hectares R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—.
History
First items: Key eventsMoreLess
Construction began in the mid-1990s, and salt production at the Anshun Salt Fields ceased as a result R004Source〈十分鐘搞懂台南科技工業區〉[Understand the Tainan Technology Industrial Park in Ten Minutes], 混信不動產 [Hunhsin Real Estate]Original URLhttp://www.hunhsin.com.tw/page8.php?id=144Retrieved2026-10-18Snapshot timestamp—A timeline compiled by a private real estate company; the official approval document numbers are to be added. Accounts of the start of construction: this source records the preparatory office established in 1995-09 and construction of the eastern embankment begun on 1996-04-15; R010 says "since development began in ROC year 85 [1996]"; R011 says construction began in 1997.R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—. In 2001 the Control Yuan noted that less than 20 percent of the land available for lease or sale had been taken up R007Source監察院 [Control Yuan], text of the corrective measure proposed by Control Yuan members Huang Huang-hsiung (黃煌雄), Chao Jung-yao (趙榮耀), and Yin Shih-hao (尹士豪) against the Executive Yuan (lack of overall planning in the supply of industrial land), 2001-11-30Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/23428Retrieved2026-10-30Snapshot timestamp—Vertical-text edition of the same document: https://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/54457; the development area was reduced in 2003 R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—, and a 2012 Control Yuan report listed the 213-hectare West Section as expected to have its designation revoked R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.. In 2018 the Ministry of the Interior approved a case-specific urban-plan amendment for Phase 4-2, the only phase of the East Section not yet developed R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—. Official record
Key events
- 1919
- Taiwan Salt Manufacturing Company (臺灣製鹽株式會社) developed the Anshun Salt Fields (安順鹽田), with a total area of 353 jia (甲, a Taiwanese land unit of about 0.97 ha) R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—. Official record
- 1990
- The Ministry of Economic Affairs (經濟部) proposed developing the Anshun Salt Fields as the Tainan Technology Industrial Park (another account gives 1992 as the start of planning; see "Controversies") R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—. Official record
- 1992
- The government planned to turn the Sicao salt-field wetlands into the Tainan Technology Industrial Park, filling in the land to build factories R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—. Secondhand account
- 12 The Ministry of Economic Affairs sent the environmental impact statement to the Environmental Protection Administration (環保署) for review (經(81)工字第 092024 號) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- 1993
- 01-13 The Environmental Protection Administration sent its review conclusion ((81)環署綜字第 59129 號, 1,146 ha): 「本計畫區內之四草地區為本島四大水鳥地之一」 ("the Sicao area within this plan area is one of the four major waterbird sites on the main island"); non-priority development zones were not to be designated as industrial land for the time being; conservation measures for the black-winged stilt (高蹺鴴) breeding area had to be worked out with the Council of Agriculture (農委會); black-faced spoonbill (黑面琵鷺) foraging and roosting habitat was not to be used as a borrow area; and before construction the developer had to submit 「野生動物保護區劃設完成且無干擾保育動物之虞之評估」 ("an assessment showing that the wildlife refuge has been designated and that there is no risk of disturbing protected animals") R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- 1994
- 11-30 The Tainan City Government (臺南市政府) proclaimed the designation of the Sicao Wildlife Reserve R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- The Taijiang National Park Headquarters (台江國家公園管理處) writes instead that in 1994 most of the Anshun Salt Fields were included in the Sicao Wildlife Reserve 「依農委會公告」 ("under a proclamation of the Council of Agriculture") R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—. Unverified
- 1995–1996
- 1995-09, preparatory office established; 1996-04, approved by the Executive Yuan (行政院); 1996-04-15, construction of the eastern separation embankment began R004Source〈十分鐘搞懂台南科技工業區〉[Understand the Tainan Technology Industrial Park in Ten Minutes], 混信不動產 [Hunhsin Real Estate]Original URLhttp://www.hunhsin.com.tw/page8.php?id=144Retrieved2026-10-18Snapshot timestamp—A timeline compiled by a private real estate company; the official approval document numbers are to be added. Accounts of the start of construction: this source records the preparatory office established in 1995-09 and construction of the eastern embankment begun on 1996-04-15; R010 says "since development began in ROC year 85 [1996]"; R011 says construction began in 1997.. Unverified
- The 2018 materials of the Tainan City Urban Planning Commission (臺南市都市計畫委員會) say of the East Section 「自民國 85 年開發以來」 ("since development began in ROC year 85 [1996]") R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—. Official record
- 1997
- Construction of the Tainan Technology Industrial Park began, and salt production at the Anshun Salt Fields formally ceased; the economic life of the salt fields was about 75 years (account of the Taijiang National Park Headquarters) R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—. Official record
- 1999
- 02-24 The difference analysis for the change to the wastewater treatment plant works plan was approved with amendments (0870623A) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- 2000
- A Control Yuan (監察院) investigation report of that year singled out the Tainan Technology Industrial Park for lagging development and poor sales; in the same year the former Industrial Park Development and Management Fund bought 10.06 hectares of land in the park to lease out R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.. Official record
- 2001
- 11-30 The Control Yuan passed the corrective measure proposed by Control Yuan members Huang Huang-hsiung (黃煌雄), Chao Jung-yao (趙榮耀), and Yin Shih-hao (尹士豪), censuring the Executive Yuan for the lack of overall planning in the supply of industrial land: 「經濟部工業局編定開發之台南科技工業區,與國科會之台南科學工業園區……在其可供租售之一七0公頃用地中,僅實際租售出三十公頃,尚未達二十%」 ("the Tainan Technology Industrial Park designated and developed by the Industrial Development Bureau of the Ministry of Economic Affairs, and the National Science Council's Tainan Science Park ... of the 170 hectares of land available for lease or sale, only thirty hectares have actually been leased or sold, less than twenty percent") R007Source監察院 [Control Yuan], text of the corrective measure proposed by Control Yuan members Huang Huang-hsiung (黃煌雄), Chao Jung-yao (趙榮耀), and Yin Shih-hao (尹士豪) against the Executive Yuan (lack of overall planning in the supply of industrial land), 2001-11-30Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/23428Retrieved2026-10-30Snapshot timestamp—Vertical-text edition of the same document: https://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/54457. Official record
- 2002
- 04-23 Report: 〈四草科工區--奇怪的土〉 ("The Sicao Technology Industrial Park: Strange Soil") R006Source環境資訊中心 [Taiwan Environmental Information Center], reports on Sicao and Annan DistrictOriginal URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—. Secondhand account
- 05-01 The "006688" preferential land-lease scheme for industrial-park land took effect R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.. Official record
- 2003
- The comparison table of changes reducing the development area was approved with amendments (0922064A) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- Completed R004Source〈十分鐘搞懂台南科技工業區〉[Understand the Tainan Technology Industrial Park in Ten Minutes], 混信不動產 [Hunhsin Real Estate]Original URLhttp://www.hunhsin.com.tw/page8.php?id=144Retrieved2026-10-18Snapshot timestamp—A timeline compiled by a private real estate company; the official approval document numbers are to be added. Accounts of the start of construction: this source records the preparatory office established in 1995-09 and construction of the eastern embankment begun on 1996-04-15; R010 says "since development began in ROC year 85 [1996]"; R011 says construction began in 1997.. Unverified
- 2004
- An environmental impact investigation report was submitted (0932147A) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- 2006
- 09-06 Tainan Mayor Hsu Tain-tsair (許添財) said the city would help some firms in the Anping Industrial Park (安平工業區) move to the Tainan Technology Industrial Park; Construction Bureau Director Chen Chi-sung (陳啟松) said land in the Anping Industrial Park cost about NT$60,000 to 70,000 per ping, against about NT$50,000 in the technology park R013Source環境資訊中心 [Taiwan Environmental Information Center] (excerpting a 聯合報 [United Daily News] Tainan report), 〈安平工業區轉型 市長扮推手〉[Anping Industrial Park in Transition, with the Mayor as Driving Force], 2006-09-07Original URLhttps://www.e-info.org.tw/node/14035Retrieved2026-10-30Snapshot timestamp—. Secondhand account
- 2010
- At year's end, 1.81 hectares of the technology-park land bought by the former Industrial Park Development and Management Fund still awaited lease or sale R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.. Official record
- 2011
- 05-03 The second comparison table of changes was approved with amendments (0991474A) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- End of 08 The designated area of the Tainan Technology Industrial Park was 706.87 hectares, of which 457.87 hectares had been developed; the 213-hectare West Section was expected to have its designation revoked, and public facilities in the 36-hectare Phase 4 Zone 2 had not been built R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.. Official record
- 2012
- 03-20 Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) issued an investigation report on idle or abandoned industrial parks under the Industrial Development Bureau; the figures above come from this report R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.. Official record
- 2014
- 04-18 The Ministry of Economic Affairs announced that it would accept applications for land-use change planning R002Source行政院公報 [Executive Yuan Gazette], Vol. 020, No. 071 (2014-04-18); Vol. 021, Nos. 069 / 088 / 098 (2015)Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- A Control Yuan report records that by the end of 2014 RSEA Engineering Corporation (榮民工程公司) had collected NT$2.358 billion in land-lease payments under the Tainan Technology Industrial Park 006688 scheme, which the Industrial Development Bureau had not disbursed; after an investigation by Control Yuan members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒), and Wang Mei-yu (王美玉), the disbursement or an agreed termination was completed in 2017-05 R009Source監察院 [Control Yuan], investigation report by Control Yuan members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒), and Wang Mei-yu (王美玉) (on the liquidation of RSEA Engineering Corporation listed in the 審計部 [National Audit Office] audit report on the 2015 (ROC year 104) central government final accounts)Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/44652Retrieved2026-10-30Snapshot timestamp—. Official record
- 2015
- From 07-01 the Environmental Protection Administration ended its delegation to the Industrial Development Bureau of water pollution control, waste disposal, and stationary pollution source permit review within the park R002Source行政院公報 [Executive Yuan Gazette], Vol. 020, No. 071 (2014-04-18); Vol. 021, Nos. 069 / 088 / 098 (2015)Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- 2018
- 10-17 By letter 內授營都字第1070073125號, the Ministry of the Interior (內政部) approved a case-specific amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (the East Section of the Tainan Technology Industrial Park), in support of Phase 4-2 development R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—. Official record
- The East Section, about 493.86 hectares, was approved and designated under the former Statute for Upgrading Industries (《促進產業升級條例》) R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—. Official record
- Phase 4-2 lies between Section 1 of Luermen Boulevard (鹿耳門大道一段), Section 1 of Bentian Road (本田路一段), and Section 2 of Beishanwei Road (北汕尾二路). It is entirely state-owned land managed by the Ministry of Economic Affairs, covers about 39.3 hectares, and is the only phase of the East Section not yet developed R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—. Official record
- Public exhibition for 30 days from 10-22; a briefing was held at 3 p.m. on 11-09 on the 4th floor of the Annan District Office (安南區公所); comments submitted by the public or organizations: none R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—. Official record
- 12-03 The Environmental Protection Administration reviewed the environmental impact difference analysis for the "Tainan Tech Park" (南科工); the preliminary review panel agreed to lift the conductivity limit on effluent and asked that the effects on nearby aquaculture be clarified. Development is concentrated in the East Section of nearly 500 hectares, with effluent of 40,000 CMD and 2,000 CMD recycled R012Source環境資訊中心 [Taiwan Environmental Information Center], Lai Pin-yu (賴品瑀), 〈直接排入海、不影響灌溉取水 南科工放流水將取消電導度限值〉[Discharged Directly to the Sea, Not Affecting Irrigation Intake: Conductivity Limit on Tainan Technology Industrial Park Effluent to Be Lifted], 2018-12-03Original URLhttps://www.e-info.org.tw/node/215312Retrieved2026-10-30Snapshot timestamp—. Secondhand account
- 10-17 By letter 內授營都字第1070073125號, the Ministry of the Interior (內政部) approved a case-specific amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (the East Section of the Tainan Technology Industrial Park), in support of Phase 4-2 development R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—. Official record
- 2019
- 04-10 The fifth environmental impact difference analysis was approved with amendments (1070513A) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- 2021
- 12-22 Review of the sixth environmental impact difference analysis was completed (1100583A) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
People and bodies involved
- Industrial Development Bureau, MOEA: the developer R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- Environmental Protection Administration: the 1993 review conclusion R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment Environmental Impact Assessment Document Query System]: review conclusion on the 臺南科技工業區開發計畫環境影響評估報告書 [Environmental Impact Statement for the Tainan Technology Industrial Park Development Plan] (0810082A, 經濟部工業局 [Industrial Development Bureau, MOEA], 1,146 ha); 0870623A, 0922064A, 0932147A, 0991474A, 1070513A, 1100583AOriginal URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Official record
- Tainan City Government: proclaimed the refuge in 1994 R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—. Official record
- Wetlands Taiwan (中華民國濕地保護聯盟): management of Sicao Area A1 R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—. Secondhand account
- RSEA Engineering Corporation: handled the land-lease payments under the Tainan Technology Industrial Park 006688 scheme; disbursement or an agreed termination was completed in 2017 R009Source監察院 [Control Yuan], investigation report by Control Yuan members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒), and Wang Mei-yu (王美玉) (on the liquidation of RSEA Engineering Corporation listed in the 審計部 [National Audit Office] audit report on the 2015 (ROC year 104) central government final accounts)Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/44652Retrieved2026-10-30Snapshot timestamp—. Official record
- Control Yuan members: Huang Huang-hsiung, Chao Jung-yao, and Yin Shih-hao (2001 corrective measure against the Executive Yuan); Chou Yang-shan, Lee Ping-nan, and Ma Yi-kung (2012 investigation report); Yang Mei-ling, Lin Ya-feng, and Wang Mei-yu (investigation into the RSEA Engineering Corporation liquidation) R007Source監察院 [Control Yuan], text of the corrective measure proposed by Control Yuan members Huang Huang-hsiung (黃煌雄), Chao Jung-yao (趙榮耀), and Yin Shih-hao (尹士豪) against the Executive Yuan (lack of overall planning in the supply of industrial land), 2001-11-30Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/23428Retrieved2026-10-30Snapshot timestamp—Vertical-text edition of the same document: https://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/54457R008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.R009Source監察院 [Control Yuan], investigation report by Control Yuan members Yang Mei-ling (楊美鈴), Lin Ya-feng (林雅鋒), and Wang Mei-yu (王美玉) (on the liquidation of RSEA Engineering Corporation listed in the 審計部 [National Audit Office] audit report on the 2015 (ROC year 104) central government final accounts)Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/44652Retrieved2026-10-30Snapshot timestamp—. Official record
- Tainan Mayor Hsu Tain-tsair and Construction Bureau Director Chen Chi-sung: spoke in 2006 about moving Anping Industrial Park firms to the technology park R013Source環境資訊中心 [Taiwan Environmental Information Center] (excerpting a 聯合報 [United Daily News] Tainan report), 〈安平工業區轉型 市長扮推手〉[Anping Industrial Park in Transition, with the Mayor as Driving Force], 2006-09-07Original URLhttps://www.e-info.org.tw/node/14035Retrieved2026-10-30Snapshot timestamp—. Secondhand account
- Ministry of the Interior: approved the case-specific amendment of Zone A12 in 2018 R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—. Official record
Impact on the surrounding environment
- The black-winged stilt breeding area (A1) of the Sicao Wildlife Reserve lies at the northern end of the industrial park's East Section R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—. Secondhand account
- Salt production at the Anshun Salt Fields ceased when construction of the industrial park began; later, with a subsidy from the Council for Cultural Affairs (文建會), the "Yantian Ecological Culture Village" (鹽田生態文化村) was established, and in 2009 it was incorporated into Taijiang National Park (台江國家公園) R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—. Official record
- North of the industrial park lie two urban-planning industrial zones, the Tucheng Industrial Zone (土城工業區, Ind. 8) and Ind. 9 (Conditional) (工9(附)) R014Source臺南市政府 [Tainan City Government] press release (issued by the Urban Development Bureau, 2025-01-30)〈安南區『工9』工業區擬定細部計畫案啟動,挹注產業發展新動能〉["Detailed Plan for Annan District's 'Ind. 9' Industrial Zone Launched, Adding New Momentum to Industrial Development"]: 「其中擬定臺南市安南區土城工業區(工8)細部計畫案已發布實施,與本計畫皆位於「台南產業園區」(原科工區)北側」 ("of these, the detailed plan for the Tucheng Industrial Zone (Ind. 8), Annan District, Tainan City, has been promulgated and put into effect; it and this plan both lie north of the Tainan Industrial Park (formerly the Technology Industrial Park)")Original URLhttps://www.tainan.gov.tw/News_Content.aspx?n=13370&sms=9748&s=8719280Retrieved2026-10-30Snapshot timestamp—Official press release.. Official record
Controversies
Year planning began for the Tainan Technology Industrial Park
- Account 1In 1990 the Ministry of Economic Affairs proposed developing the Anshun Salt Fields as the Tainan Technology Industrial ParkR011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—
- Account 2Planned in 1992; in 1992-12 the Ministry of Economic Affairs sent the environmental impact statement for reviewR003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—
A third account gives 1991 (ROC year 80), but the source website has been redesigned and it can no longer be checked. The original document of the initial designation proclamation is still to be located.
Year construction began
- Account 1Preparatory office established 1995-09; construction of the eastern separation embankment began 1996-04-15R004Source〈十分鐘搞懂台南科技工業區〉[Understand the Tainan Technology Industrial Park in Ten Minutes], 混信不動產 [Hunhsin Real Estate]Original URLhttp://www.hunhsin.com.tw/page8.php?id=144Retrieved2026-10-18Snapshot timestamp—A timeline compiled by a private real estate company; the official approval document numbers are to be added. Accounts of the start of construction: this source records the preparatory office established in 1995-09 and construction of the eastern embankment begun on 1996-04-15; R010 says "since development began in ROC year 85 [1996]"; R011 says construction began in 1997.
- Account 2Tainan City Urban Planning Commission materials: "since development began in ROC year 85 [1996]" (自民國 85 年開發以來)R010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—
- Account 3Taijiang National Park Headquarters: construction began in 1997, and salt production at the Anshun Salt Fields ceasedR011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—
Authority that proclaimed the Sicao Wildlife Reserve
- Account 1Proclaimed by the Tainan City Government on 1994-11-30R003Source四草野生動物保護區經營史與濕盟紀錄 [Management history of the Sicao Wildlife Reserve and records of Wetlands Taiwan]Original URL—Retrieved2026-10-19Snapshot timestamp—
- Account 2In 1994 most of the Anshun Salt Fields were included in the Sicao Wildlife Reserve "under a proclamation of the Council of Agriculture" (依農委會公告)R011Source台江國家公園管理處 [Taijiang National Park Headquarters], 《安順鹽田》[The Anshun Salt Fields]Original URLhttps://ws.moi.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvT2xkRmlsZV9USk5QL0VuY3ljbG9wZWRpYXMvMjAxMzExMjkxNjQ2MjA5NjEyNzkucGRm&n=MjAxMzExMjkxNjQ2MjA5NjEyNzkucGRmRetrieved2026-10-30Snapshot timestamp—
Should be checked against the original proclamation.
Area of Phase 4-2
- Account 1Table in the 2012 Control Yuan report (data as of the end of 2011-08): Phase 4 Zone 2, 36.00 haR008Source監察院 [Control Yuan], investigation report by Control Yuan members Chou Yang-shan (周陽山), Lee Ping-nan (李炳南), and Ma Yi-kung (馬以工) (idle or abandoned industrial parks under the Industrial Development Bureau, MOEA), 2012-03-20Original URLhttps://cybsbox.cy.gov.tw/CYBSBoxSSL/edoc/download/50150Retrieved2026-10-30Snapshot timestamp—Phase 4-2 area: this report gives 36 hectares (data as of the end of 2011-08); R010 gives about 39.3 hectares.
- Account 2Tainan City Urban Planning Commission review materials, 2018: about 39.3 haR010Source臺南市都市計畫委員會 [Tainan City Urban Planning Commission], review materials for Case 6, 「變更臺南市安南區細部計畫A12區(臺南科技工業區(東區部分))(配合臺南科技工業區4-2期開發工程)案」[Amendment of Zone A12 of the Detailed Plan for Annan District, Tainan City (Tainan Technology Industrial Park (East Section)) (in support of the Phase 4-2 development works of the Tainan Technology Industrial Park)], 2018Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTY2L3JlbGZpbGUvMTgwMzgvNzY2NzcxMy81NGZiZjFmNi0wZjg5LTQ3NGQtYWQzZi03NWVlNDU0MTRkY2EucGRm&n=5a%2BpNuahiC5wZGY%3DRetrieved2026-10-30Snapshot timestamp—
Development data in Huang Chin-fang's thesis (2009)
- Extent: located on both sides of the Luermen River mouth and bordered on the east by Provincial Highway 17, with a site of 709 ha; the East Zone (Yantian and Luer villages) is 495.84 ha and the West Zone (Chengxi Village, Tucheng) 213 ha; by around 2008 the West Zone land had been released from its industrial designation and was being replanned R015SourceHuang Chin-fang (黃晉芳),《台南市安南區北線尾社會經濟之變遷》[Socioeconomic Change in Beixianwei, Annan District, Tainan City],長榮大學臺灣研究所碩士論文 [Master's thesis, Graduate Institute of Taiwan Studies, Chang Jung Christian University],2009,印頁 130、145–149Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《Socioeconomic Change in Beixianwei, Annan District, Tainan City (台南市安南區北線尾社會經濟之變遷)》p. 130、145–149Data supplied by Chang Hsu-sheng (張旭昇), director of the Tainan Technology Industrial Park Service Center, Industrial Development Bureau, Ministry of Economic Affairs.. Scholarly view
- Timeline: in 1990 (ROC year 79) the Ministry of Economic Affairs decided to establish it; from 1991 (ROC year 80) the feasibility planning, environmental impact assessment, outline plan, industrial-zone designation and urban-plan amendment were completed; construction formally began on 15 April 1996 (ROC year 85); the Industrial Development Bureau agreed to set aside 515 ha within the industrial park as a protected area R015SourceHuang Chin-fang (黃晉芳),《台南市安南區北線尾社會經濟之變遷》[Socioeconomic Change in Beixianwei, Annan District, Tainan City],長榮大學臺灣研究所碩士論文 [Master's thesis, Graduate Institute of Taiwan Studies, Chang Jung Christian University],2009,印頁 130、145–149Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《Socioeconomic Change in Beixianwei, Annan District, Tainan City (台南市安南區北線尾社會經濟之變遷)》p. 130、145–149Data supplied by Chang Hsu-sheng (張旭昇), director of the Tainan Technology Industrial Park Service Center, Industrial Development Bureau, Ministry of Economic Affairs..
- Land use in the East Zone (Table 43): industrial land 451.66 ha (of which special manufacturing zone 226.33, special research and testing zone 47.38, and public facilities 147.99 ha), and industrial community land 44.19 ha (residential land 31.34 ha) R015SourceHuang Chin-fang (黃晉芳),《台南市安南區北線尾社會經濟之變遷》[Socioeconomic Change in Beixianwei, Annan District, Tainan City],長榮大學臺灣研究所碩士論文 [Master's thesis, Graduate Institute of Taiwan Studies, Chang Jung Christian University],2009,印頁 130、145–149Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《Socioeconomic Change in Beixianwei, Annan District, Tainan City (台南市安南區北線尾社會經濟之變遷)》p. 130、145–149Data supplied by Chang Hsu-sheng (張旭昇), director of the Tainan Technology Industrial Park Service Center, Industrial Development Bureau, Ministry of Economic Affairs..
- Investment promotion: sales to investors began in 1998 with poor results; in 2000 and 2001 lease schemes of NT$3 billion and NT$10 billion were proposed, and land was offered for lease or sale; over four years only 16.63 ha were sold and 23.5 ha leased, with 30 firms approved R015SourceHuang Chin-fang (黃晉芳),《台南市安南區北線尾社會經濟之變遷》[Socioeconomic Change in Beixianwei, Annan District, Tainan City],長榮大學臺灣研究所碩士論文 [Master's thesis, Graduate Institute of Taiwan Studies, Chang Jung Christian University],2009,印頁 130、145–149Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《Socioeconomic Change in Beixianwei, Annan District, Tainan City (台南市安南區北線尾社會經濟之變遷)》p. 130、145–149Data supplied by Chang Hsu-sheng (張旭昇), director of the Tainan Technology Industrial Park Service Center, Industrial Development Bureau, Ministry of Economic Affairs..
- The "006688" scheme (no rent for the first 2 years, 60% of rent in years 3 and 4, and 80% in years 5 and 6): 21 firms were approved in 2002, 49 in 2003 and 72 in 2004; after the scheme was expanded in 2005 only 23 firms were approved, and 10 in 2006 R015SourceHuang Chin-fang (黃晉芳),《台南市安南區北線尾社會經濟之變遷》[Socioeconomic Change in Beixianwei, Annan District, Tainan City],長榮大學臺灣研究所碩士論文 [Master's thesis, Graduate Institute of Taiwan Studies, Chang Jung Christian University],2009,印頁 130、145–149Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《Socioeconomic Change in Beixianwei, Annan District, Tainan City (台南市安南區北線尾社會經濟之變遷)》p. 130、145–149Data supplied by Chang Hsu-sheng (張旭昇), director of the Tainan Technology Industrial Park Service Center, Industrial Development Bureau, Ministry of Economic Affairs..
- September 2007: 166 firms had formally moved in and 102 were in production, with 136.0285 ha developed and in use, less than half the usable industrial land; the three main industry groups were LCD, auto parts and biotechnology, and the thesis cites the service center's estimate that the park could provide 10,000 jobs and NT$120 billion in annual output R015SourceHuang Chin-fang (黃晉芳),《台南市安南區北線尾社會經濟之變遷》[Socioeconomic Change in Beixianwei, Annan District, Tainan City],長榮大學臺灣研究所碩士論文 [Master's thesis, Graduate Institute of Taiwan Studies, Chang Jung Christian University],2009,印頁 130、145–149Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《Socioeconomic Change in Beixianwei, Annan District, Tainan City (台南市安南區北線尾社會經濟之變遷)》p. 130、145–149Data supplied by Chang Hsu-sheng (張旭昇), director of the Tainan Technology Industrial Park Service Center, Industrial Development Bureau, Ministry of Economic Affairs..
Further reading
- Taiwan Environmental Information Center (環境資訊中心), 〈四草科工區--奇怪的土〉 ("The Sicao Technology Industrial Park: Strange Soil"), 2002-04-23, https://e-info.org.tw/node/11665 R006Source環境資訊中心 [Taiwan Environmental Information Center], reports on Sicao and Annan DistrictOriginal URLhttps://e-info.org.tw/Retrieved2026-10-19Snapshot timestamp—. Secondhand account
- Taiwan Environmental Information Center, 〈安平工業區轉型 市長扮推手〉 ("Anping Industrial Park in Transition, with the Mayor as Driving Force"), 2006-09-07 R013Source環境資訊中心 [Taiwan Environmental Information Center] (excerpting a 聯合報 [United Daily News] Tainan report), 〈安平工業區轉型 市長扮推手〉[Anping Industrial Park in Transition, with the Mayor as Driving Force], 2006-09-07Original URLhttps://www.e-info.org.tw/node/14035Retrieved2026-10-30Snapshot timestamp—. Secondhand account
- Taiwan Environmental Information Center, 〈直接排入海、不影響灌溉取水 南科工放流水將取消電導度限值〉 ("Discharged Directly to the Sea, Not Affecting Irrigation Intake: Conductivity Limit on Tainan Technology Industrial Park Effluent to Be Lifted"), Lai Pin-yu (賴品瑀), 2018-12-03 R012Source環境資訊中心 [Taiwan Environmental Information Center], Lai Pin-yu (賴品瑀), 〈直接排入海、不影響灌溉取水 南科工放流水將取消電導度限值〉[Discharged Directly to the Sea, Not Affecting Irrigation Intake: Conductivity Limit on Tainan Technology Industrial Park Effluent to Be Lifted], 2018-12-03Original URLhttps://www.e-info.org.tw/node/215312Retrieved2026-10-30Snapshot timestamp—. Secondhand account
Impact on the space of Annan District (records in a 2014 thesis)
- Liu Sui-hsuan's (劉穗萱) 2014 master's thesis says that the third general review of the Tainan City main plan in 1996 positioned Annan District as a zone for science, technology and education development, in coordination with the "Industrial Zone 15" (「工 15」) technology industrial park; the thesis records that the Tainan Technology Industrial Park is divided into East and West zones, focused mainly on the production and manufacture of components, with an Industrial Innovation and R&D Demonstration Zone (East Phase 1) R016SourceLiu Sui-hsuan (劉穗萱),《都市邊緣區空間型態演變之研究-以台南市安南區為例》[A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City],國立成功大學都市計劃學系碩士論文 [Master's thesis, Department of Urban Planning, National Cheng Kung University],2014,頁 40、46Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City (都市邊緣區空間型態演變之研究-以台南市安南區為例)》p. 40、46.
- After the detailed plan for the East Zone of the Tainan Technology Industrial Park was drawn up in 1998, Yantian Village became the village with the greatest growth in built-up area in 2002; Xiangong Village had the highest growth in built-up area of any village from 1984 to 2011 (333.73%); the thesis attributes both to the technology industrial park R017SourceLiu Sui-hsuan (劉穗萱),《都市邊緣區空間型態演變之研究-以台南市安南區為例》[A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City],國立成功大學都市計劃學系碩士論文 [Master's thesis, Department of Urban Planning, National Cheng Kung University],2014,頁 59–65、77Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City (都市邊緣區空間型態演變之研究-以台南市安南區為例)》p. 59–65、77.
- Villages corresponding to the thesis's areas: the Tainan Technology Industrial Park (A12, Eastern Detailed Plan) covers Xiangong and Yantian villages; the Industrial Innovation and R&D Demonstration Zone covers Chengxi and Chengnan villages R017SourceLiu Sui-hsuan (劉穗萱),《都市邊緣區空間型態演變之研究-以台南市安南區為例》[A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City],國立成功大學都市計劃學系碩士論文 [Master's thesis, Department of Urban Planning, National Cheng Kung University],2014,頁 59–65、77Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《A Study on the Spatial Transformation of Urban Fringe in Annan District of Tainan City (都市邊緣區空間型態演變之研究-以台南市安南區為例)》p. 59–65、77.
Reports that mention it
Hall of Ecology5.4Ecology / Protected areas and disputes
Sicao and the Mouth of the Yanshui River
Four sets of official notices give the area of the Sicao Wildlife Reserve; the current figure is 543.186 hectares. The water system inside its Zone A3 lies within Chengxi Village.
Hall of the Present6.1Present conditions and institutions / Industrial parks and pollution
The Chengxi Landfill and Incinerator
Five generations of projects on the same plot of land, from the incinerator's 1989 EIA case number to the replacement furnace and the Chengxi Circular Economy Park of 2026. Residents protested from 1991 on and won compensation funds and compensation facilities; Phase 4 was suspended because of protests; the landfill caught fire four times within a year, and black water appeared in a tidal ditch in 2026. The wetland beside the landfill has four further stories: a two-year reversal on dioxin in sediment, the backfilling of fish farm ponds, poaching and enforcement, and a rejected ecotourism proposal.
Hall of Local Memory9.8Settlement / Roads and transportation
Tucheng Goes to Town: Haidian Road, Hewei, and Garden Night Market
When Tucheng people say they are "going into town," they mean a specific route: Anzhong Road, then Haidian Road, then across the Yanshui River Bridge. Until 2019 that bridge was only 18 meters wide, although the roads at both ends were 30 meters wide.
Continue from here
- Sicao: other Institutions and SchoolsTaijiang Wetland School⚖︎Environmental education brand of the Taijiang National Park Headquarters
- People involvedChou Yang-shanControl Yuan member who probed idle industrial parks
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items