Tucheng Goes to Town: Haidian Road, Hewei, and Garden Night Market

Official recordLocal oral accountSecondhand accountUnverified
832

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

When Tucheng people say they are "going into town," they mean a specific route: Anzhong Road, then Haidian Road, then across the Yanshui River Bridge. Until 2019 that bridge was only 18 meters wide, although the roads at both ends were 30 meters wide.R001Source臺南市政府工務局 [Public Works Bureau, Tainan City Government] press release〈和緯路最後一哩路完工通車 全面串聯安平生活路網〉[The Last Mile of Hewei Road Completed and Opened to Traffic, Fully Linking the Anping Road Network] (Hewei Road was built in more than 10 phases with a width of 30 meters; the Section 5 extension broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. on 2023-09-28)Original URLhttps://publicworks.tainan.gov.tw/News_Content.aspx?n=18224&sms=18436&s=8609397Retrieved2026-10-23Snapshot timestamp(None, or not applicable)

Sicao Bridge and the breakwater-armored seawall beneath it; the bridge spans the mouth of the Yanshui River, linking Anping and Sicao.
Sicao Bridge and the breakwater-armored seawall beneath it; the bridge spans the mouth of the Yanshui River, linking Anping and Sicao.rheins · CC BY 3.0 · Annan District, Tainan City (Sicao Bridge, not the Provincial Highway 17A Yanshui River Bridge described on this page)

What it is

Local oral account「土城人的日常圈不只有土城五里。海佃路生活圈、和緯生活圈(通常算到花園夜市)、十二佃,以及幾乎整個安南區,都在在地人說的「出去」範圍裡;安定與永康不算」 (The everyday world of Tucheng (土城) people is larger than the five villages of Tucheng (土城五里). The Haidian Road (海佃路) area, the Hewei (和緯) area (usually counted as far as Garden Night Market (花園夜市)), Shierdian (十二佃), and almost the whole of Annan District (安南區) all fall within what locals call "going out" (出去); Anding (安定) and Yongkang (永康) do not count) R008SourceLocal oral account (the project author, firsthand observation)Original URL—Retrieved2026-10-23Snapshot timestamp—Haidian Road, Hewei (as far as Garden Night Market), Shierdian, and almost all of Annan District count as part of Tucheng people's everyday sphere; Anding and Yongkang are not included.. Local oral account「而「進市區」這三個字指的是一條具體的路:安中路轉海佃路,過鹽水溪橋」 (And the phrase "going into town" (進市區) refers to one specific route: Anzhong Road (安中路), turning onto Haidian Road, then across the Yanshui River (鹽水溪) Bridge) R008SourceLocal oral account (the project author, firsthand observation)Original URL—Retrieved2026-10-23Snapshot timestamp—Haidian Road, Hewei (as far as Garden Night Market), Shierdian, and almost all of Annan District count as part of Tucheng people's everyday sphere; Anding and Yongkang are not included..

Roads and the bridge

4 items1970–2008First items: The 18-meter bridgeHewei Road: a road opened in more than ten phasesFour years in the history of Haidian RoadMoreLess

The 18-meter bridge

Official recordReconstruction of the Provincial Highway 17A (台17甲線) Yanshui River Bridge began on 2016-08-10 and was completed, with the whole bridge opened to traffic, on 2019-10-05. The bridge was widened from 18 meters to 30 meters, its length was increased to 212 meters, and the construction cost was about NT$455 million R002SourceETtoday 新聞雲 [ETtoday News Cloud]〈歷經3年施工 台17甲線鹽水溪橋全線開放通車〉[After Three Years of Construction, the Provincial Highway 17A Yanshui River Bridge Opens Fully to Traffic] (work began 2016-08-10 and the bridge opened fully on 2019-10-05; width increased from 18 to 30 meters, length 212 meters, construction cost about NT$455 million)Original URLhttps://www.ettoday.net/news/20191005/1551029.htmRetrieved2026-10-23Snapshot timestamp—The official press release, the Public Works Bureau's final accounts, the Liberty Times, and this report corroborate one another as four sources.. Official recordThe authorities stated the reason plainly themselves: after widening, 「寬度亦符合銜接之海佃路路寬 30 公尺,解決該處交通瓶頸壅塞問題」 ("the width also matches the 30-meter width of the connecting Haidian Road, resolving the traffic bottleneck and congestion at that location") R002SourceETtoday 新聞雲 [ETtoday News Cloud]〈歷經3年施工 台17甲線鹽水溪橋全線開放通車〉[After Three Years of Construction, the Provincial Highway 17A Yanshui River Bridge Opens Fully to Traffic] (work began 2016-08-10 and the bridge opened fully on 2019-10-05; width increased from 18 to 30 meters, length 212 meters, construction cost about NT$455 million)Original URLhttps://www.ettoday.net/news/20191005/1551029.htmRetrieved2026-10-23Snapshot timestamp—The official press release, the Public Works Bureau's final accounts, the Liberty Times, and this report corroborate one another as four sources.. In other words, before 2019 there were 30-meter roads at both ends with an 18-meter bridge squeezed between them.

Hewei Road: a road opened in more than ten phases

Official recordHewei Road (和緯路) is about 5.4 km long. Beginning in 1989 (ROC year 78), nearly NT$2.5 billion was invested in it, and it was built in more than ten successive phases, completing about 4.4 km from Beimen Road westward to Huaping Road at a full road width of 30 meters R001Source臺南市政府工務局 [Public Works Bureau, Tainan City Government] press release〈和緯路最後一哩路完工通車 全面串聯安平生活路網〉[The Last Mile of Hewei Road Completed and Opened to Traffic, Fully Linking the Anping Road Network] (Hewei Road was built in more than 10 phases with a width of 30 meters; the Section 5 extension broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. on 2023-09-28)Original URLhttps://publicworks.tainan.gov.tw/News_Content.aspx?n=18224&sms=18436&s=8609397Retrieved2026-10-23Snapshot timestamp—. Widening of the stretch from Section 2 to Ximen Road Section 4 began in fiscal 2014 (ROC year 103). Because the stretch from Ximen Road to Wenxian 2nd Street came late in the schedule, the road's width varied between Sections 1 and 5, and the official press release itself says it 「曾被外界譏為『香腸路』」 ("was once mocked by outsiders as a 'sausage road'"); an opening ceremony was held on 2015-05-12 R001Source臺南市政府工務局 [Public Works Bureau, Tainan City Government] press release〈和緯路最後一哩路完工通車 全面串聯安平生活路網〉[The Last Mile of Hewei Road Completed and Opened to Traffic, Fully Linking the Anping Road Network] (Hewei Road was built in more than 10 phases with a width of 30 meters; the Section 5 extension broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. on 2023-09-28)Original URLhttps://publicworks.tainan.gov.tw/News_Content.aspx?n=18224&sms=18436&s=8609397Retrieved2026-10-23Snapshot timestamp—. The Section 5 extension (from Huaping Road in the east to Minquan Road Section 4 in the west, about 1 km long and 30 meters wide) broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. the following day R001Source臺南市政府工務局 [Public Works Bureau, Tainan City Government] press release〈和緯路最後一哩路完工通車 全面串聯安平生活路網〉[The Last Mile of Hewei Road Completed and Opened to Traffic, Fully Linking the Anping Road Network] (Hewei Road was built in more than 10 phases with a width of 30 meters; the Section 5 extension broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. on 2023-09-28)Original URLhttps://publicworks.tainan.gov.tw/News_Content.aspx?n=18224&sms=18436&s=8609397Retrieved2026-10-23Snapshot timestamp—.

UnverifiedSubsidy amount: the official press release gives NT$350 million (NT$150 million for land acquisition plus NT$200 million for construction); another account gives NT$430 million R001Source臺南市政府工務局 [Public Works Bureau, Tainan City Government] press release〈和緯路最後一哩路完工通車 全面串聯安平生活路網〉[The Last Mile of Hewei Road Completed and Opened to Traffic, Fully Linking the Anping Road Network] (Hewei Road was built in more than 10 phases with a width of 30 meters; the Section 5 extension broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. on 2023-09-28)Original URLhttps://publicworks.tainan.gov.tw/News_Content.aspx?n=18224&sms=18436&s=8609397Retrieved2026-10-23Snapshot timestamp—.

Four years in the history of Haidian Road

UnverifiedFour key years for Haidian Road R009Source痞客邦 [PIXNET] blog《南瀛探索・府城百年濱海道》[Nanying Explorations: The Century-Old Coastal Road of Fucheng] (four key years for Haidian Road: Guoxing Bridge opened in the 1970s; drying farm produce on the road banned in 1984; redesignated Provincial Highway 17A in 1994; starting point moved to Anji Road Section 3 from 2008)Original URLhttps://nanying.pixnet.net/blogRetrieved2026-10-23Snapshot timestamp—A blog and a single source; unverified.:

  1. 1970s After Guoxing Bridge (國姓橋) across the Zengwen River (曾文溪) opened, the old Provincial Highway 17 (today's Haidian Road) connected with the Yanshui River Bridge to enter the city.
  2. 1984 The city government issued an order banning the drying of farm produce on three main roads (Haidian Road, Anhe Road, and Anzhong Road, whose average width in the early years did not exceed 15 meters).
  3. 1994 With the West Coast Highway built for the development of the Tainan Technology Industrial Park, the old alignment of Haidian Road was redesignated Provincial Highway 17A.
  4. 2008 After National Freeway 8 was connected to the Xinji Industrial Zone, the starting point of Provincial Highway 17A was moved to Anji Road (安吉路) Section 3.

Official recordOn the urban-planning side there are official documents: the announcement on 2003-01-02 of the 「擬定台南市安南區(海佃路二段兩側地區)細部計畫案」 ("Detailed Plan for Annan District, Tainan City (Areas on Both Sides of Haidian Road Section 2)"); the announcement on 2007-11-19 of the rezoning of parts of residential and agricultural zones as road land; the review in 2005 by the Urban Planning Commission of the Ministry of the Interior (內政部) of the detailed plan for the area west of Haidian Road Section 1 (when Annan District had a population of about 170,000); and the 「海佃路二至四段(海尾路至台江大道)道路改善工程」 ("Road Improvement Project for Haidian Road Sections 2 to 4 (Haiwei Road to Taijiang Boulevard)"), completed in 2025–2026 R009Source痞客邦 [PIXNET] blog《南瀛探索・府城百年濱海道》[Nanying Explorations: The Century-Old Coastal Road of Fucheng] (four key years for Haidian Road: Guoxing Bridge opened in the 1970s; drying farm produce on the road banned in 1984; redesignated Provincial Highway 17A in 1994; starting point moved to Anji Road Section 3 from 2008)Original URLhttps://nanying.pixnet.net/blogRetrieved2026-10-23Snapshot timestamp—A blog and a single source; unverified..

Three more roads

Official recordBesides Haidian Road, the other roads Tucheng people often travel each have their own opening dates. The National Freeway 8 Tainan Branch (Tainan end to Xinhua end) opened on 1999-08-16, and the Xinhua System Interchange opened on 1999-12-30. The "National Freeway 8–West Coast Highway connector project" running west from Freeway 8, which is today's middle section of Taijiang Boulevard (台江大道) (Anji Road to Anming Road (安明路)), was completed and opened on 2007-12-18 R010Source交通部高速公路局 [Freeway Bureau, Ministry of Transportation and Communications], 「國道新建工程局歷史專頁-國工局編年大事紀」[Taiwan Area National Expressway Engineering Bureau History Page: Chronology of Major Events] (National Freeway 8 Tainan Branch, Tainan end to Xinhua end, opened 1999-08-16; Xinhua System Interchange opened 1999-12-30; the 「國道 8 號銜接西濱公路工程」 (National Freeway 8–West Coast Highway connector project) was completed and opened on 2007-12-18)Original URLhttps://www.freeway.gov.tw/Publish.aspx?cnid=2989Retrieved2026-10-27Snapshot timestamp—Official source.. Secondhand accountThe eastern section of Taijiang Boulevard opened in three stages: 2013-04-15 from Anji Road to Anhe Road, 2016-03-31 from Anhe Road to Kai'an Road, and 2016-05-23 from Kai'an Road to the Fu'an levee top (according to media and Wikipedia) R011Source自由時報 [Liberty Times]〈〈南部〉台江大道西段完工 3.12全線通車〉[(South) Western Section of Taijiang Boulevard Completed; Whole Road Opens March 12] (2017-02; the eastern section opened in stages: 2013-04-15 Anji Road to Anhe Road, 2016-03-31 Anhe Road to Kai'an Road, 2016-05-23 Kai'an Road to the Fu'an levee top; total length 13.8 km); 維基百科 [Wikipedia]〈台江大道〉[Taijiang Boulevard]Original URLhttps://news.ltn.com.tw/news/local/paper/1081304Retrieved2026-10-27Snapshot timestamp—Media and an online database; secondary sources. See also Wikipedia: https://zh.wikipedia.org/zh-tw/%E5%8F%B0%E6%B1%9F%E5%A4%A7%E9%81%93 .. Official recordThe western section opened fully on 2017-03-12, and the ceremony was held at the intersection of the west side of Taijiang Boulevard Section 5 (台江大道五段) and Qingsha Street (青砂街), that is, right behind the Shengmu Temple (聖母廟) R012Source臺南市新營區公所 [Xinying District Office, Tainan City] press release〈「植樹護林守護台灣」植樹節暨台江大道全線通車典禮活動〉["Plant Trees, Protect Forests, Guard Taiwan": Arbor Day and Taijiang Boulevard Full Opening Ceremony] (2017-03-12; the ceremony was held at the intersection of the west side of Taijiang Boulevard Section 5 and Qingsha Street)Original URLhttps://xinying.tainan.gov.tw/News_Content.aspx?n=8224&s=120403Retrieved2026-10-27Snapshot timestamp—Official source.; for the groundbreaking and opening dates of each part of the western section, see the "Taijiang Boulevard" entry and page 9.9.

Official recordAnming Road (the Annan stretch of Provincial Highway 17): on 2003-08-19 city councilors publicly urged the city government to 「安明路已完工路段先行開放通車」 ("open the completed sections of Anming Road to traffic first"), which means that in August 2003 some sections of Anming Road had still not opened R013Source臺南市議會 [Tainan City Council] latest news〈黃秋榮、郭信良議員呼籲「安明路已完工路段先行開放通車」〉[Councilors Huang Chiu-jung and Kuo Hsin-liang Call for "Opening the Completed Sections of Anming Road to Traffic First"] (2003-08-19)Original URLhttps://www.tncc.gov.tw/2019/tnccp/news_01.asp?mainid={C2DB5639-12D2-408C-A052-38DACE3D2D8B}Retrieved2026-10-27Snapshot timestamp—Official source. It only shows that some sections were still not open in 2003; it does not give the year the road was built..

Markets and night markets

First items: The "Haidian Market" that the official system does not listGarden Night Market's move in 2005MoreLess

The "Haidian Market" that the official system does not list

Official recordNone of the Market Administration Office's (市場處) five official lists (59 public retail markets, 58 private retail markets, 58 entries in the open-data register of private markets, 46 regulated vendor clusters, and 32 night markets holding establishment permits) includes a "Haidian Market" (海佃市場) R007Source臺南市政府市場處 [Market Administration Office, Tainan City Government], five official lists (register of public retail markets, 59 entries; register of private retail markets, 58 entries; open-data register of private markets, 58 entries; register of regulated vendor clusters, 46 entries; register of night markets holding establishment permits, 32 entries; none of them includes a 「海佃市場」 (Haidian Market))Original URLhttps://marketoffice.tainan.gov.tw/News.aspx?n=24453&sms=18848Retrieved2026-10-23Snapshot timestamp—. Official recordWhat the official system does have is the "Haidian Night Market" (海佃夜市): in 1984 the Guo'an Street night market was forced to disband because of a policy decision, and the vendors asked a sitting city councilor to help them negotiate a lease of land from a landowner. The new market was formally established on July 15 of the same year and later came to be called "Huagu Night Market" (樺谷夜市) because it was near the Huagu Hotel R004Source臺南市政府市場處 [Market Administration Office, Tainan City Government], page 「樺谷夜市(合法夜市)」[Huagu Night Market (licensed night market)] (originally named Haidian Night Market, founded 1984-07-15; shrank to about one hundred stalls after Garden Night Market opened in 2005; now open Sundays 16:00–23:30 with about 92 stalls)Original URLhttps://marketoffice.tainan.gov.tw/News_Content.aspx?n=44661&s=8747674Retrieved2026-10-23Snapshot timestamp—.

Garden Night Market's move in 2005

Official recordGarden Night Market was founded in 1999 in the Zhengziliao (鄭子寮) readjustment zone beside Yude Road in North District (北區), open Thursdays, Saturdays, and Sundays, and it took over the shopping crowds left after the Tuntex (東帝士) department store closed. In 2003 its lease expired and it closed; the vendors followed the landowner to the 「大統一夜市」 ("Da Tongyi Night Market") on the former site of the Makro Ximen store. In 2005 the original operator leased a site designated for a park at the corner of Hai'an Road (海安路) Section 3 and Hewei Road Section 3 and reopened there, drawing the vendors back en masse with free parking and ample space R003Source臺南市政府市場處 [Market Administration Office, Tainan City Government], page 「花園夜市(合法夜市)」[Garden Night Market (licensed night market)] (founded 1999 on Yude Road, North District → 2003 Da Tongyi Night Market → 2005 moved to its present site on Hai'an Road Section 3; Fridays added from 2025-10-03; the office's update of 2026-10-22 gives about 996 stalls)Original URLhttps://marketoffice.tainan.gov.tw/News_Content.aspx?n=44664&s=8741819Retrieved2026-10-23Snapshot timestamp—. From 2025-10-03 it added Fridays and now opens Thursday through Sunday R003Source臺南市政府市場處 [Market Administration Office, Tainan City Government], page 「花園夜市(合法夜市)」[Garden Night Market (licensed night market)] (founded 1999 on Yude Road, North District → 2003 Da Tongyi Night Market → 2005 moved to its present site on Hai'an Road Section 3; Fridays added from 2025-10-03; the office's update of 2026-10-22 gives about 996 stalls)Original URLhttps://marketoffice.tainan.gov.tw/News_Content.aspx?n=44664&s=8741819Retrieved2026-10-23Snapshot timestamp—.

Official recordOn the effect of that move on Annan District, the Market Administration Office's page on Huagu Night Market states: 「規模一度達到兩百多攤,惟2005年花園夜市於現址開幕,因地理位置鄰近,嚴重衝擊同為周日營業的樺谷夜市,導致人潮及攤販流失,萎縮至僅餘一百攤左右」 ("Its size once reached more than two hundred stalls, but in 2005 Garden Night Market opened at its present site; being geographically close, it severely hit Huagu Night Market, which also operated on Sundays, causing crowds and vendors to drain away, and it shrank to only about one hundred stalls") R004Source臺南市政府市場處 [Market Administration Office, Tainan City Government], page 「樺谷夜市(合法夜市)」[Huagu Night Market (licensed night market)] (originally named Haidian Night Market, founded 1984-07-15; shrank to about one hundred stalls after Garden Night Market opened in 2005; now open Sundays 16:00–23:30 with about 92 stalls)Original URLhttps://marketoffice.tainan.gov.tw/News_Content.aspx?n=44661&s=8747674Retrieved2026-10-23Snapshot timestamp—. Official recordHuagu Night Market now operates on Sundays from 16:00 to 23:30 with about 92 stalls. More than two hundred stalls, about one hundred, then 92: a line of decline backed by official figures R004Source臺南市政府市場處 [Market Administration Office, Tainan City Government], page 「樺谷夜市(合法夜市)」[Huagu Night Market (licensed night market)] (originally named Haidian Night Market, founded 1984-07-15; shrank to about one hundred stalls after Garden Night Market opened in 2005; now open Sundays 16:00–23:30 with about 92 stalls)Original URLhttps://marketoffice.tainan.gov.tw/News_Content.aspx?n=44661&s=8747674Retrieved2026-10-23Snapshot timestamp—.

UnverifiedFor Garden Night Market's own stall count, three figures coexist: the Market Administration Office's update of 2026-10-22 gives about 996 stalls, city government news says it 「集結超過 400 間攤販」 ("gathers more than 400 vendors"), and another account says 「近四百家」 ("nearly four hundred") R003Source臺南市政府市場處 [Market Administration Office, Tainan City Government], page 「花園夜市(合法夜市)」[Garden Night Market (licensed night market)] (founded 1999 on Yude Road, North District → 2003 Da Tongyi Night Market → 2005 moved to its present site on Hai'an Road Section 3; Fridays added from 2025-10-03; the office's update of 2026-10-22 gives about 996 stalls)Original URLhttps://marketoffice.tainan.gov.tw/News_Content.aspx?n=44664&s=8741819Retrieved2026-10-23Snapshot timestamp—.

The bus line that connects the two sides

Official recordBus Route 11 began service on 2003-12-01 and was extended from Haidong Elementary School into the city on 2009-04-25; the boundary for its two-section fare is Haidong Elementary School. On 2019-06-28 the "Tuchengzi" (土城子) stop was renamed "Anzhong Road Section 6 (Tucheng)," and the route does stop at "Garden Night Market–Hewei Road" R006Source大台南公車 [Greater Tainan Bus] Route 11 current route and stop data (service began 2003-12-01; extended from Haidong Elementary School into the city on 2009-04-25; the fare-section boundary for the two-section fare is Haidong Elementary School; on 2019-06-28 the stop 「土城子」 (Tuchengzi) was renamed 「安中路六段(土城)」 (Anzhong Road Section 6 (Tucheng)); it stops at 「花園夜市-和緯路」 (Garden Night Market–Hewei Road))Original URLhttps://busmap.tainan.gov.tw/ebus/pathInfo.jsp?pathId=10169&locale=zh_TWRetrieved2026-10-23Snapshot timestamp—. Official recordThere is corroboration from the market side as well: Heshun Market is the only market page on the whole Market Administration Office site that mentions Route 11: 「交通便利,有臺南市11路公車可抵達」 ("conveniently located; reachable by Tainan City bus Route 11") R005Source臺南市政府市場處 [Market Administration Office, Tainan City Government], page 「和順市場」[Heshun Market] (relocated on September 8, 1984 (ROC year 73) from private land on Anzhong Road Section 1, about 64 stalls; verbatim: 「有臺南市11路公車可抵達」 ("reachable by Tainan City bus Route 11"))Original URLhttps://marketoffice.tainan.gov.tw/News_Content.aspx?n=44659&s=8749361Retrieved2026-10-23Snapshot timestamp—.

UnverifiedFor Tucheng people to visit a big night market, they had to cross the Yanshui River into the city; and the road that joins the two sides had its western section opened only in 2015, and its bridge widened to match the road only in 2019 R001Source臺南市政府工務局 [Public Works Bureau, Tainan City Government] press release〈和緯路最後一哩路完工通車 全面串聯安平生活路網〉[The Last Mile of Hewei Road Completed and Opened to Traffic, Fully Linking the Anping Road Network] (Hewei Road was built in more than 10 phases with a width of 30 meters; the Section 5 extension broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. on 2023-09-28)Original URLhttps://publicworks.tainan.gov.tw/News_Content.aspx?n=18224&sms=18436&s=8609397Retrieved2026-10-23Snapshot timestamp—R002SourceETtoday 新聞雲 [ETtoday News Cloud]〈歷經3年施工 台17甲線鹽水溪橋全線開放通車〉[After Three Years of Construction, the Provincial Highway 17A Yanshui River Bridge Opens Fully to Traffic] (work began 2016-08-10 and the bridge opened fully on 2019-10-05; width increased from 18 to 30 meters, length 212 meters, construction cost about NT$455 million)Original URLhttps://www.ettoday.net/news/20191005/1551029.htmRetrieved2026-10-23Snapshot timestamp—The official press release, the Public Works Bureau's final accounts, the Liberty Times, and this report corroborate one another as four sources..

Differing accounts

  1. UnverifiedSubsidy for the Hewei Road Section 5 extension:
    • The official press release gives NT$350 million R001Source臺南市政府工務局 [Public Works Bureau, Tainan City Government] press release〈和緯路最後一哩路完工通車 全面串聯安平生活路網〉[The Last Mile of Hewei Road Completed and Opened to Traffic, Fully Linking the Anping Road Network] (Hewei Road was built in more than 10 phases with a width of 30 meters; the Section 5 extension broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. on 2023-09-28)Original URLhttps://publicworks.tainan.gov.tw/News_Content.aspx?n=18224&sms=18436&s=8609397Retrieved2026-10-23Snapshot timestamp—.
    • Another account gives NT$430 million R001Source臺南市政府工務局 [Public Works Bureau, Tainan City Government] press release〈和緯路最後一哩路完工通車 全面串聯安平生活路網〉[The Last Mile of Hewei Road Completed and Opened to Traffic, Fully Linking the Anping Road Network] (Hewei Road was built in more than 10 phases with a width of 30 meters; the Section 5 extension broke ground on 2020-09-01, was completed on 2023-09-27, and opened to traffic at 4 p.m. on 2023-09-28)Original URLhttps://publicworks.tainan.gov.tw/News_Content.aspx?n=18224&sms=18436&s=8609397Retrieved2026-10-23Snapshot timestamp—.
  2. UnverifiedNumber of stalls at Garden Night Market R003Source臺南市政府市場處 [Market Administration Office, Tainan City Government], page 「花園夜市(合法夜市)」[Garden Night Market (licensed night market)] (founded 1999 on Yude Road, North District → 2003 Da Tongyi Night Market → 2005 moved to its present site on Hai'an Road Section 3; Fridays added from 2025-10-03; the office's update of 2026-10-22 gives about 996 stalls)Original URLhttps://marketoffice.tainan.gov.tw/News_Content.aspx?n=44664&s=8741819Retrieved2026-10-23Snapshot timestamp—:
    • The Market Administration Office's update of 2026-10-22 gives about 996 stalls.
    • City government news says it 「集結超過 400 間攤販」 ("gathers more than 400 vendors").
    • Another account says 「近四百家」 ("nearly four hundred").
  3. UnverifiedThe year Anming Road was opened: one account says 1994 (a blog); another says 2002 (a reading of Wikipedia) R013Source臺南市議會 [Tainan City Council] latest news〈黃秋榮、郭信良議員呼籲「安明路已完工路段先行開放通車」〉[Councilors Huang Chiu-jung and Kuo Hsin-liang Call for "Opening the Completed Sections of Anming Road to Traffic First"] (2003-08-19)Original URLhttps://www.tncc.gov.tw/2019/tnccp/news_01.asp?mainid={C2DB5639-12D2-408C-A052-38DACE3D2D8B}Retrieved2026-10-27Snapshot timestamp—Official source. It only shows that some sections were still not open in 2003; it does not give the year the road was built..

The content of this hall consists of local oral accounts; entries with zero official records are marked as such; secondhand accounts and firsthand observations are marked separately.

See more →

Behind this door is the internal site, with profiles of people and local comments. The internal site is deployed separately.