The Tuchengzi tidal embankment was a sea defense built by the Chianan Irrigation Canal water association in the Japanese colonial period, running from Qingcaolun to south of Zhengziliao; 8,800 meters long, it was completed in Shōwa 5 (1930).R001SourceLu Jui-hsiang (呂瑞祥), 《鹿耳門溪沿岸地方開發的歷史變遷》[The Historical Changes of the Regional Development along Luerhmen Creek], 國立臺南大學臺灣文化研究所碩士論文 [master's thesis, Graduate Institute of Taiwan Culture, National University of Tainan], 2010, p. 102Original URL(None, or not applicable)Retrieved2026-11-02Snapshot timestamp(None, or not applicable)

Category
Places
Also known as
土城子防潮堤防、Tuchengzi Seawall

Lu Jui-hsiang's thesis records the tidal defenses of the Chianan Irrigation Canal water association (suiri kumiai) of the Japanese colonial period: the Tuchengzi tidal embankment ran from Qingcaolun to south of Zhengziliao, was 8,800 meters long, and was completed in Shōwa 5 (1930); in the same year the Mazugong tidal embankment was also completed, winding along the western shore of Mazugong, 1,350 meters long.

Extent and route

  1. 「土城子防潮堤防:自青草崙起接鄭仔寮南方,長度 8,800 公尺,昭和 5 年(1930 年)興建完成」 ("Tuchengzi tidal embankment: from Qingcaolun to south of Zhengziliao, 8,800 meters long, completed in Shōwa 5 (1930)") R001SourceLu Jui-hsiang (呂瑞祥), 《鹿耳門溪沿岸地方開發的歷史變遷》[The Historical Changes of the Regional Development along Luerhmen Creek], 國立臺南大學臺灣文化研究所碩士論文 [master's thesis, Graduate Institute of Taiwan Culture, National University of Tainan], 2010, p. 102Original URL—Retrieved2026-11-02Snapshot timestamp—SourceFrom 《The Historical Changes of the Regional Development along Luerhmen Creek (鹿耳門溪沿岸地方開發的歷史變遷)》p. 102.

Works of the same period

  1. The Mazugong tidal embankment, completed the same year: 「媽祖宮防潮堤防:昭和 5 年(1930 年)興建完成,迂迴媽祖宮西部海濱,長度 1,350 公尺」 ("Mazugong tidal embankment: completed in Shōwa 5 (1930), winding along the western shore of Mazugong (媽祖宮), 1,350 meters long") R001SourceLu Jui-hsiang (呂瑞祥), 《鹿耳門溪沿岸地方開發的歷史變遷》[The Historical Changes of the Regional Development along Luerhmen Creek], 國立臺南大學臺灣文化研究所碩士論文 [master's thesis, Graduate Institute of Taiwan Culture, National University of Tainan], 2010, p. 102Original URL—Retrieved2026-11-02Snapshot timestamp—SourceFrom 《The Historical Changes of the Regional Development along Luerhmen Creek (鹿耳門溪沿岸地方開發的歷史變遷)》p. 102.