The Tuchengzi Drain is a tributary of the Luermen drainage system in Annan District, running from Lane 735, Chengbei Road in Shalun Village to the Luermen River in Chengnan Village; a five-bay tide gate has been under construction since 2026.R001Source行政院公報 [Executive Yuan Gazette]〈臺南市區域排水起訖點公告表〉[Announcement Table of the Start and End Points of Regional Drains in Tainan City]: 「土城仔排水, 鹿耳門排水, 與鹿耳門溪排水匯流口, 城北路735巷(沙崙里)」 ("Tuchengzi Drain; Luermen Drain; confluence with the Luermen River drain; Lane 735, Chengbei Road (Shalun Village)")Original URLhttps://gazette.nat.gov.tw/EG_FileManager/eguploadpub/eg011220/ch04/type3/gov31/num2/Eg.htmRetrieved2026-10-27Snapshot timestamp(None, or not applicable)Official data (announced 2005).

Category
Places
Related reports
4 reports
Also known as
土城大排、土城仔大排、土城子排水、Tuchengzi Drainage、Tucheng Drainage Canal
Coordinates
23.047595, 120.124460

The Tuchengzi Drain (土城仔排水) is a regional drain in Annan District, Tainan, one of the tributaries of the Luermen drainage system (鹿耳門排水系統), running from Lane 735, Chengbei Road in Shalun Village to Chengnan Village, where it joins the Luermen River (R001, R002). Its downstream section was widened and improved in 2018, and from February 2026 a five-bay tide gate and pumping units are being built to reduce the risk of seawater backflow into the Tuchengzi settlement (R002, R003).

Geography

  1. Statutory start and end points: confluence with the Luermen River (鹿耳門溪) drain → Lane 735, Chengbei Road (城北路) (Shalun Village (沙崙里)) (R001).
  2. Tributaries: the Tuchengzi No. 1-2 Drain (土城仔一之二排水) and the Shalunjiao Middle Drain (沙崙角中排) (R003). Documents differ in their wording; other spellings such as 「土城子排水」 and 「砂崙腳中排」 also appear.
  3. Terrain: the catchment is flat, with ground elevations of about 1.0 to 4.0 m, and most of the main settlement roads lie below 2.0 m (R003).

History

7 items2005–2025First items: 2005: the Executive Yuan Gazette (行政院公報)…April 2012: public hearing on the downst…December 2016: work began on the downstr…MoreLess
  1. 2005: the Executive Yuan Gazette (行政院公報) announced the start and end points of the regional drains (R001).
  2. April 2012: public hearing on the downstream improvement works (R002).
  3. December 2016: work began on the downstream section 0K+000–0K+750 (R002).
  4. 2018-09-04: the downstream section was completed (R002):
    1. Length 750 m, from the Luermen River to an unnamed bridge on Anqing Road (安清路) Section 1.
    2. Cost NT$91 million.
    3. The channel was widened from 10 m to 20 m, the embankment protection level raised to 2.6 m, and a 6 m-wide flood-control road built on each bank.
  5. 2024–2025: contract awarded for the commissioned design and supervision of the tide gate (wat113073) and tender issued for the works (wat114084) (R005).
  6. 2025-07-16: public hearing on the improvement works for the upstream section 1K+720–2K+820 (R004).
  7. Mid-February 2026: work began on the "Tide Gate Improvement Works for the Tuchengzi Drain, Annan District" (安南區土城仔排水防潮閘門治理工程), with a NT$150 million subsidy from the Water Resources Agency (水利署) (R003):
    1. Tuchengzi Drain: a five-bay tide gate (each bay 4.2 m wide and 2.6 m high) and two 4 CMS pumping units.
    2. Tuchengzi No. 1-2 Drain: box culvert, pumping platform, and gate.
    3. Shalunjiao Middle Drain: a two-bay gate.
    4. Expected to be completed before the 2027 flood season.

Flooding and flood-control facilities

  1. Flooding: during high summer tides, the low-lying parts of Chengxi Street (城西街) Section 1 in the Tuchengzi (土城仔) settlement are at risk of seawater backflow and surface flooding (R003).
  2. Emergency facilities (R003, R006):
    1. Pumping equipment where the side ditch of Chengxi Street Section 1 joins the Tuchengzi Drain box culvert on Chengnan Road (城南路).
    2. Temporary gates on the side ditch and mobile pumps.
    3. A double-leaf automatic gate on the collecting well beside the Chengnan Road box culvert.
  3. Outlet: downstream, the drain joins the Luermen River in Chengnan Village (城南里); the north end of the Longyu Bridge (龍魚橋) sits on the embankment road between the Tuchengzi Drain and the Zhufagang (竹筏港) drain (R002).

Relation to siltation at the Luermen River mouth

  1. Chen Kuan-chung's (陳冠中) 2020 master's thesis lists the "Tuchengzi Main Drain" (「土城子大排」) as one of three Chianan Irrigation drainage channels flowing into the Luermen River (the other two written as the Xinanliao Main Drain (溪南寮大排) and the Xifagang Main Drain (溪筏港大排)), and considers the sediment these drains have long carried to be one cause of siltation at the river mouth (p. 1) R007SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系碩士論文 [Master's thesis, Department of Hydraulic and Ocean Engineering, National Cheng Kung University],2020,頁 1Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 1. See Siltation at the Luermen River mouth.

See also

  1. Luermen River, Zhufagang
  2. Chengxi Street, Chengbei Road
  3. Shalunjiao (砂崙腳), Tuchengzi
  4. Chianan Irrigation Canal (嘉南大圳), Tuchengzi Lateral (土城子分線)

Reports that mention it

Hall of Origins1.2Settlement / Place names and jiaotou

The Eleven Jiaotou and the Upper and Lower Bao

The difference between ten jiaotou and eleven is the single jiaotou of Xiashifenwen; the lists of four jiaotou in the Upper Bao and seven in the Lower Bao come from two independent sources, and all eleven jiaotou are named on the "Sanzhao Xiangjiao Fuzhang" of the jiao festival.

643

Hall of the Present6.3Present conditions and institutions / Drainage and flooding

Siltation of the Luermen River

Flow-training and dredging works awarded on 2024-12-24 for NT$43,688,000, fully subsidized by the Water Resources Agency; the channel depth is to be increased to 1.5 meters so that boats from Sicao Fishing Harbor can pass, and the dredged sediment is used for beach nourishment outside the Sicao seawall.

1144

Hall of the Present6.6Present conditions and institutions / National park

How the National Park Sees Tucheng

This page is not about scenery. It is about how a 394-page statutory plan (the approved edition) describes, classifies, and passes over Tucheng — together with one observation on naming: the authorities recognize "Chengxi" and "Qingcaolun" but not "Tucheng."

2275

Hall of Local Memory9.9Everyday memories / Old trees

The Old Trees of Tucheng

Tainan City's register of protected old trees lists only 6 in Annan District, and only 2 in the five villages of Tucheng, both on Chengxi Street Section 2 in Chengnan Village. Yet a two-day walk around Tucheng on October 26 and 27, 2026 recorded more than thirty old-tree sites, numbered T1–T28, S1–S6, and C1, the great majority of them on no register at all.

13188

Continue from here