Siltation at the Luermen River Mouth

Secondhand account
600

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Siltation at the Luermen River mouth is the long-standing problem of sediment build-up at the mouth of the Luermen River in Annan District, Tainan City: sediment carried down by drainage and littoral drift moving from north to south settle at the mouth, making the water shallower and the waves steeper through shoaling, so that fishing boats going in and out often capsize. The city government dredges about 20,000 cubic meters a year.R001SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 1–2Original URL(None, or not applicable)Retrieved2026-11-20Snapshot timestamp(None, or not applicable)

Category
Terms
Also known as
鹿耳門溪出海口淤積、鹿耳門溪口淤積、鹿耳門溪出海口航道淤沙、鹿耳門溪口淤沙、Luermen River estuary siltation、Luermen estuary sedimentation

Siltation at the Luermen River mouth is long-term sediment build-up at the mouth of the Luermen River. The river is short, with a small catchment and a current of about one meter per second; it also receives sediment from three drainage channels of the Chianan Irrigation system, and its mouth lies near the surf zone, where littoral drift moving from north to south settles [R001][R003]. The siltation sharply reduces water depth, causes wave shoaling, and narrows the flow cross-section, and boats going out to tend oyster farms often capsize. The Tainan City Fishing Harbor and Offshore Management Office budgets two to three million NT dollars a year to dredge about 20,000 cubic meters [R001][R002]. In 2020 Chen Kuan-chung's master's thesis used numerical modeling to compare three options for extending the training jetty and concluded that a 100-meter extension was the most effective [R005].

Causes

4 itemsFirst items: The Luermen River lies between the Zengw…The river is about 7 km long and flows s…Three drainage channels of the Chianan I…MoreLess
  1. The Luermen River lies between the Zengwen River (曾文溪) and the Yanshui River (鹽水溪). Its course is short and its catchment small, so it carries too little water: 「冬季乾旱時無法灌溉田園,夏季則常因暴雨而氾濫成災」 ("in the dry winter it cannot irrigate the fields, while in summer it often floods disastrously in heavy rain") (p. 1) R001SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 1–2Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 1–2.
  2. The river is about 7 km long and flows slowly, at about one meter per second; the basin is flat, and in low-lying places the ground is below mean high water (p. 16, citing the 2000 Planning Report on Improvement of the Luermen Drainage System, 《鹿耳門排水系統改善規劃報告》) R003SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 11–16 (Tables 2-1 to 2-3, citing the Water Resources Agency's hydrological yearbooks, the Central Weather Bureau's Qigu buoy, and 《鹿耳門排水系統改善規劃報告》[Planning Report on Improvement of the Luermen Drainage System], 2000)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 11–16.
  3. Three drainage channels of the Chianan Irrigation system (嘉南大圳) flow into the Luermen River; the thesis names them as the Xinanliao Main Drain (溪南寮大排), the Tuchengzi Main Drain (土城子大排), and the Xifagang Main Drain (溪筏港大排). Over the years they have carried in sediment from coastal drainage R001SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 1–2Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 1–2. A 2023 press release of the Tainan City Government instead lists the Chianan Irrigation drainage channel, the Xinanliao Main Drain, the Tuchengzi Main Drain (土城仔大排), Zhufagang Drainage No. 1 (竹筏港之一排水), and Zhufagang Drainage No. 2 (竹筏港之二排水) (see Luermen River).
  4. The river's lower end lies near the surf zone, where the longshore current cannot carry the sediment away; within the drift zone, the dominant north-to-south littoral drift settles at the mouth R001SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 1–2Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 1–2R003SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 11–16 (Tables 2-1 to 2-3, citing the Water Resources Agency's hydrological yearbooks, the Central Weather Bureau's Qigu buoy, and 《鹿耳門排水系統改善規劃報告》[Planning Report on Improvement of the Luermen Drainage System], 2000)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 11–16.

Effects

  1. Siltation at the mouth sharply reduces water depth, producing wave shoaling, and the flow cross-section grows ever smaller R001SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 1–2Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 1–2.
  2. Many local people farm oysters and must go out to sea frequently; the thesis says that at the mouth 「經常發生船隻翻覆事件,已嚴重影響民眾生命財產安全」 ("boats frequently capsize, seriously endangering people's lives and property") (p. 1) R001SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 1–2Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 1–2.
  3. The current at Siwubao Fishing Harbor (四五堡漁港), inside the river, is very weak, and its role in carrying sediment to the mouth is negligible; the model treats it as a land boundary R006SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 28–29Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 28–29.

Dredging

  1. The mouth already has a training jetty, but its effect in reducing siltation is limited. The Tainan City Fishing Harbor and Offshore Management Office (臺南市漁港及近海管理所) budgets two to three million NT dollars a year to dredge the channel, removing about 20,000 cubic meters of sediment a year (p. 5) R002SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 5–10 (Chapter 2; photographs of the dredging process from the Tainan City Fishing Harbor and Offshore Management Office)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 5–10.
  2. The dredging process (Figures 2-3 to 2-9 of the thesis, photographs provided by the Fishing Harbor Office) R002SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 5–10 (Chapter 2; photographs of the dredging process from the Tainan City Fishing Harbor and Offshore Management Office)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 5–10:
    1. A joint site inspection with fishermen to confirm the dredging points.
    2. Installation of the sand-suction pipe.
    3. Operation of the sand-suction work boat.
    4. Stockpiling of the dredged sediment; the temporary site must be chosen so as not to affect the ecology.
  3. The erosion and deposition map for the winter of November 2002 to April 2003 shows extensive erosion at the Luermen mouth, which the thesis attributes to dredging of the river mouth carried out by the Tainan City Government that year (p. 19) R004SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 17–20 (citing Tainan City Government 2019, 〈臺南市鹿耳門溪口海岸監測調查及淤沙問題之研究評估〉[Coastal Monitoring Survey of the Luermen River Mouth, Tainan City, and Research Assessment of Its Siltation Problem])Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 17–20.
  4. For the city government's later works (the flood-prevention and disaster-reduction works contracted in 2024, a 150-meter flow-training structure, and beach nourishment outside the Sicao Seawall), see Luermen River.

Changes in coastal topography

  1. Summer 2003: erosion predominated from the Zengwen River mouth out to a depth of 5 m, at Qingcaolun (青草崙), between the Luermen River and Sicao (四草), and from south of the Yanshui River to Anping (安平) out to a depth of 10 m; there was local deposition at depths of 10–12 m outside Anping Commercial Port (安平商港) (p. 18) R004SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 17–20 (citing Tainan City Government 2019, 〈臺南市鹿耳門溪口海岸監測調查及淤沙問題之研究評估〉[Coastal Monitoring Survey of the Luermen River Mouth, Tainan City, and Research Assessment of Its Siltation Problem])Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 17–20.
  2. Winter, November 2002 to April 2003: erosion and deposition alternated from the beach out to a depth of 5 m; deposition predominated at depths of 10–12 m offshore from the Zengwen River to Qingcaolun, with most changes within 2.75 m (p. 19) R004SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 17–20 (citing Tainan City Government 2019, 〈臺南市鹿耳門溪口海岸監測調查及淤沙問題之研究評估〉[Coastal Monitoring Survey of the Luermen River Mouth, Tainan City, and Research Assessment of Its Siltation Problem])Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 17–20.
  3. Long term, October 2002 to September 2019: deposition from the beach out to a depth of 9 m between the Zengwen River and the Luermen River; mostly erosion from the beach out to a depth of 10 m between the south side of the Luermen River and the Sicao Seawall (四草海堤); alternating erosion and deposition between the south side of the Sicao Seawall and the north side of Anping Commercial Port; and mostly deposition at depths of 10–15 m from the Zengwen River to Anping Commercial Port. The thesis concludes that the Luermen River mouth does have a long-term trend toward siltation (p. 20) R004SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 17–20 (citing Tainan City Government 2019, 〈臺南市鹿耳門溪口海岸監測調查及淤沙問題之研究評估〉[Coastal Monitoring Survey of the Luermen River Mouth, Tainan City, and Research Assessment of Its Siltation Problem])Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 17–20.

Marine data

  1. Tide levels: at the Water Resources Agency's Sicao Tide Station (四草潮位站), 2012–2018, the annual mean tide level was 0.35 m, the highest high water 1.65 m, the lowest low water -0.49 m, the maximum tidal range 1.69 m, and the mean tidal range 0.56 m (datum: Keelung mean sea level) (p. 11) R003SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 11–16 (Tables 2-1 to 2-3, citing the Water Resources Agency's hydrological yearbooks, the Central Weather Bureau's Qigu buoy, and 《鹿耳門排水系統改善規劃報告》[Planning Report on Improvement of the Luermen Drainage System], 2000)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 11–16.
  2. Waves: at the Central Weather Bureau's Qigu buoy (七股浮標), 2006–2019, mean significant wave height in summer (April–September) was 0.53–0.96 m, with predominant wave directions south-southwest and southwest; in winter (October–March) 1.01–1.20 m, with predominant directions north-northwest and northwest (p. 12) R003SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 11–16 (Tables 2-1 to 2-3, citing the Water Resources Agency's hydrological yearbooks, the Central Weather Bureau's Qigu buoy, and 《鹿耳門排水系統改善規劃報告》[Planning Report on Improvement of the Luermen Drainage System], 2000)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 11–16.
  3. Currents: at the Qigu buoy the mean current speed was 50 cm per second in summer and 54 cm in winter, with the main directions between north-northeast and south-southwest (p. 15) R003SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 11–16 (Tables 2-1 to 2-3, citing the Water Resources Agency's hydrological yearbooks, the Central Weather Bureau's Qigu buoy, and 《鹿耳門排水系統改善規劃報告》[Planning Report on Improvement of the Luermen Drainage System], 2000)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 11–16.
  4. A 2019 study commissioned by the city government set up two observation stations outside the river mouth: at LM-A, significant wave height was 25–225 cm and period 5.0–11.0 s; at LM-B, 50–175 cm and 4.5–10.0 s (p. 14) R003SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 11–16 (Tables 2-1 to 2-3, citing the Water Resources Agency's hydrological yearbooks, the Central Weather Bureau's Qigu buoy, and 《鹿耳門排水系統改善規劃報告》[Planning Report on Improvement of the Luermen Drainage System], 2000)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 11–16.

Simulations of jetty extension

  1. Three options: Option 1 extends the jetty by about 50 m (to just short of a depth of about 2 m), Option 2 by 100 m, and Option 3 by 150 m (to just short of a depth of about 3 m); the crest is at mean tide level and impermeable R005SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 35–54 (Chapters 4 and 5; Tables 4-1, 4-2, 5-1 to 5-3)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 35–54. See Luermen River Mouth Training Jetty.
  2. In 180-day winter simulations, channel siltation decreased markedly as the jetty was lengthened, with deposition on the right bank (updrift side) of the mouth and erosion on the left bank (downdrift side), consistent with the groin effect; in summer the differences among the options were small R005SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 35–54 (Chapters 4 and 5; Tables 4-1, 4-2, 5-1 to 5-3)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 35–54.
  3. Comparing the reduction in siltation per meter of extension, the thesis concludes that a 100-meter extension is the most effective R005SourceChen Kuan-chung (陳冠中),《河海口減淤之初步探討-以臺南鹿耳門溪口為例》[The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan],國立成功大學水利及海洋工程學系 [Department of Hydraulic and Ocean Engineering, National Cheng Kung University] 碩士論文 [master's thesis],2020,pp. 35–54 (Chapters 4 and 5; Tables 4-1, 4-2, 5-1 to 5-3)Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《The Preliminary of Silting Reduction in Estuary: A Case of Luermen Drainage, Tainan (河海口減淤之初步探討-以臺南鹿耳門溪口為例)》p. 35–54.