History
- 2002 In ROC year 91, because of domestic regulations and bottlenecks in thermal treatment technology, the Tainan City EPB decided to first install a sealed concrete tank to contain the highly contaminated soil beneath the drainage channel in the pentachlorophenol area R001Source《安順再起:汞與戴奧辛污染的終結》[Anshun Rises Again: The End of Mercury and Dioxin Pollution](臺南市政府環境保護局 [Environmental Protection Bureau, Tainan City Government],2024)頁 58–59Original URL—Retrieved2026-11-06Snapshot timestamp—SourceFrom 《Anshun Rises Again: The End of Mercury and Dioxin Pollution (安順再起:汞與戴奧辛污染的終結)》Official publication (Tainan EPB; a booklet accompanying the remediation documentary). Newspaper clippings reproduced in the book represent the newspapers' own accounts. Photographed from the physical book and transcribed by local OCR; personal names checked against the photograph.. Official record
- 2018 After Thermal Treatment Plant No. 1 began operating in ROC year 107, the EPB required CPDC to conduct successive condition surveys, drilling and sampling zone by zone to determine the concentrations of mercury and dioxin in the tank and of mercury vapor in the air R001Source《安順再起:汞與戴奧辛污染的終結》[Anshun Rises Again: The End of Mercury and Dioxin Pollution](臺南市政府環境保護局 [Environmental Protection Bureau, Tainan City Government],2024)頁 58–59Original URL—Retrieved2026-11-06Snapshot timestamp—SourceFrom 《Anshun Rises Again: The End of Mercury and Dioxin Pollution (安順再起:汞與戴奧辛污染的終結)》Official publication (Tainan EPB; a booklet accompanying the remediation documentary). Newspaper clippings reproduced in the book represent the newspapers' own accounts. Photographed from the physical book and transcribed by local OCR; personal names checked against the photograph.. Official record
- 2022 From June of ROC year 111 the contaminated soil was moved in stages to Thermal Treatment Plant No. 1. To prevent mercury vapor from escaping once the tank was opened, a steel-frame building was added on the outside, with impermeable sheeting on the walls and entrances; during removal the building was a sealed space except when machinery entered or left, and anyone entering had to wear protective gear R001Source《安順再起:汞與戴奧辛污染的終結》[Anshun Rises Again: The End of Mercury and Dioxin Pollution](臺南市政府環境保護局 [Environmental Protection Bureau, Tainan City Government],2024)頁 58–59Original URL—Retrieved2026-11-06Snapshot timestamp—SourceFrom 《Anshun Rises Again: The End of Mercury and Dioxin Pollution (安順再起:汞與戴奧辛污染的終結)》Official publication (Tainan EPB; a booklet accompanying the remediation documentary). Newspaper clippings reproduced in the book represent the newspapers' own accounts. Photographed from the physical book and transcribed by local OCR; personal names checked against the photograph.. Official record
- 2023 In May of ROC year 112 the removal of about 9,000 tons of highly contaminated soil was completed; the book says it took 21 years and overcame a major difficulty of the remediation R001Source《安順再起:汞與戴奧辛污染的終結》[Anshun Rises Again: The End of Mercury and Dioxin Pollution](臺南市政府環境保護局 [Environmental Protection Bureau, Tainan City Government],2024)頁 58–59Original URL—Retrieved2026-11-06Snapshot timestamp—SourceFrom 《Anshun Rises Again: The End of Mercury and Dioxin Pollution (安順再起:汞與戴奧辛污染的終結)》Official publication (Tainan EPB; a booklet accompanying the remediation documentary). Newspaper clippings reproduced in the book represent the newspapers' own accounts. Photographed from the physical book and transcribed by local OCR; personal names checked against the photograph.. Official record
See also
- Taiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
- Environmental Protection Bureau, Tainan City GovernmentTainan's environmental protection authorityContains 2 items
- History of the Taijian Anshun PlantThe Taijian Anshun Plant year by year
Reports that mention it
Hall of the Present6.2Present conditions and institutions / Industrial parks and pollution
The Taiwan Alkali Anshun Plant
A complete chronology from the plant's founding in 1938 to the site-wide verification of 2026, for Taiwan's first designated remediation site, D00001. This page also covers the two-year reversal in sediment downstream in the Luermen River, the full procedure of one inter-agency site inspection, and the Jian'an Substitute Elementary School (1947–1971).
Continue from here
- Luermen (Mazugong): other PlacesLuer VillageVillage of Annan District, east bank of the Luermen RiverContains 1 items
- Related entriesTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
- Entries in the same hallBinnan Industrial Park⚖︎A 1990s petrochemical and steel industrial park project at QiguContains 73 items