The Taijiang Boulevard Converter Slag Case

Official recordSecondhand accountUnverified
501

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records
Category
Events
Also known as
台江大道C001標轉爐石案、國道八號銜接西濱公路轉爐石案、098交正0023、Taijiang Boulevard Section C001 converter slag case、Taijiang Boulevard converter slag embankment case

Guided reading

The Taijiang Boulevard converter-slag case concerns the Taijiang Boulevard (Section C001), linking National Freeway 8 with Provincial Highway 17, whose embankment was filled with converter slag instead of earth, causing the road surface to heave into waves after opening; the Control Yuan censured the National Expressway Engineering Bureau in 2009 and prosecutors indicted the contractor's head in 2011.R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp(None, or not applicable)Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663

Time span
2007–20114 years
Evidence mix
Verification
  • ✓ Verified 5
  • ◑ Partially verified 0
  • ⊗ Not covered by sources 1
Source type
  • Official record 6
  • Secondhand account 4
  • Unverified 1
✓ ◑ ⊗
  • ✓ Verified: the source was found and checked
  • ◑ Partially verified: only part could be checked, or the check found the opposite
  • ⊗ Not covered by sources: nothing found in currently available public records

Full recordBelow is the item-by-item record; every item cites its source.

The Taijiang Boulevard converter-slag case (台江大道轉爐石案) concerns the Taijiang Boulevard (Section C001), which links National Freeway 8 with Provincial Highway 17 and whose embankment was filled with converter slag in place of earth, so that the road surface heaved into waves after opening R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp—Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663. Official record The road opened at the end of 2007 and passed acceptance in February 2008; within three months the asphalt on nearly half of its length had heaved R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp—Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663R003SourceSupreme Administrative Court, ROC year 101 (2012) ruling 裁字第 1413 號 (recording the acceptance inspection date of Taijiang Boulevard Section C001 as 2008-02-15)Original URL—Retrieved2026-11-06Snapshot timestamp—As recorded in the court decision, cited secondhand via Control Yuan materials.. In 2009 the Control Yuan censured the National Expressway Engineering Bureau of the Ministry of Transportation and Communications, and in 2011 the Tainan District Prosecutors Office indicted Lai Tai-wen, head of the contractor Yiqing Construction, on charges including fraud; the unlawful gain is put at about NT$30–38 million depending on the source R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp—Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663R002Source自由時報 [Liberty Times], 〈《偷工減料》「波浪」台江大道 包商起訴〉 ["Cutting Corners: The 'Wavy' Taijiang Boulevard; Contractor Indicted"] (Huang Po-lang (黃博郎), 2011-08-03)Original URLhttps://news.ltn.com.tw/news/local/paper/513663Retrieved2026-11-06Snapshot timestamp—News report..

Background

The contractor was Yiching Construction (亦慶營造), and the design and supervision firm was Zhaoling (also written 昭淩) Engineering Consultants (昭凌工程顧問公司); the road is about 6 km long, opened at the end of 2007, and passed acceptance on 2008-02-15 (the date of acceptance is recorded in Supreme Administrative Court ROC year 101 ruling 裁字第 1413 號) R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp—Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663R003SourceSupreme Administrative Court, ROC year 101 (2012) ruling 裁字第 1413 號 (recording the acceptance inspection date of Taijiang Boulevard Section C001 as 2008-02-15)Original URL—Retrieved2026-11-06Snapshot timestamp—As recorded in the court decision, cited secondhand via Control Yuan materials.. Official record

The Control Yuan's censure (2009-11-11)

6 itemsFirst items: The contractor breached the contract by …Within three months of acceptance the co…The investigation found that the country…MoreLess

The proposing members were Liu Yu-shan (劉玉山) and Chien Lin Hui-chun (錢林慧君); the censure was directed at the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications, case number 098交正0023 R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp—Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663. Official record

  1. The contractor breached the contract by substituting steelmaking furnace slag (converter slag) for earth fill in the embankment; the supervising firm approved it carelessly, and the responsible officials did not fulfill their duty of supervision.
  2. Within three months of acceptance the converter slag expanded unevenly, and on nearly half of the sections the asphalt surface heaved in waves, endangering driving safety; in just over a year after opening, 57 traffic accidents with casualties had already occurred.
  3. The investigation found that the country had as yet no construction specifications or inspection standards for converter slag embankments, yet the Expressway Engineering Bureau still agreed to its use and deemed it an "equivalent" of the earth fill specified in the contract.
  4. The works were originally budgeted at about NT$998 million; after seven design changes the final settlement was about NT$962 million; the contractor allegedly falsified documents and obtained about NT$38 million in unlawful gain by fraud.
  5. The Ministry of Transportation and Communications was asked to urge improvements, review and discipline negligent personnel, seek recovery under the contract, and refer the unlawful parts to prosecutors for reference.
  6. The text of the censure also states 「改善措施未能治本,經費來源勢將用罄」 ("the remedial measures do not cure the root problem, and the source of funds will inevitably run dry"); the bureau's director Tseng Ta-jen (曾大仁) said that responsibility would be pursued against the firms under the contract, and the road surface would be re-tendered for repair (report of the Taiwan Environmental Information Center, not checked word for word). Secondhand account

The indictment

  1. Liberty Times report of 2011-08-03: the Tainan District Prosecutors Office indicted Lai Tai-wen (賴泰文), the head of Yiching Construction, on suspicion of fraud and other offenses, saying that the firms concerned had profited by nearly NT$30 million and Lai Tai-wen personally by nearly NT$8 million; the report says the converter slag was supplied by Chung Lien Resources (中聯資源公司) in a quantity of more than 170,000 cubic meters R002Source自由時報 [Liberty Times], 〈《偷工減料》「波浪」台江大道 包商起訴〉 ["Cutting Corners: The 'Wavy' Taijiang Boulevard; Contractor Indicted"] (Huang Po-lang (黃博郎), 2011-08-03)Original URLhttps://news.ltn.com.tw/news/local/paper/513663Retrieved2026-11-06Snapshot timestamp—News report.. Secondhand account
  2. Aftermath: no verdict in Lai Tai-wen's criminal case has been found; an indictment is not a finding of guilt. Unverified

Differing accounts

  1. Unlawful gain: the Control Yuan records that the contractor obtained about NT$38 million by fraud R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp—Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663; the report on the Tainan District Prosecutors Office's indictment says the firms concerned profited by nearly NT$30 million R002Source自由時報 [Liberty Times], 〈《偷工減料》「波浪」台江大道 包商起訴〉 ["Cutting Corners: The 'Wavy' Taijiang Boulevard; Contractor Indicted"] (Huang Po-lang (黃博郎), 2011-08-03)Original URLhttps://news.ltn.com.tw/news/local/paper/513663Retrieved2026-11-06Snapshot timestamp—News report..

Key events

  1. 2007
    1. Road opens to traffic at the end of the …Official recordMoreLess
      Road opens to traffic at the end of the year R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp—Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663. Official record
  2. 2008
    1. 02-15
      Acceptance inspection completed R003SourceSupreme Administrative Court, ROC year 101 (2012) ruling 裁字第 1413 號 (recording the acceptance inspection date of Taijiang Boulevard Section C001 as 2008-02-15)Original URL—Retrieved2026-11-06Snapshot timestamp—As recorded in the court decision, cited secondhand via Control Yuan materials.. Official record
  3. 2009
    1. 06The Tainan District Prosecutors Office s…Secondhand accountMoreLess
      The Tainan District Prosecutors Office summons Lai Tai-wen and personnel of Zhaoling Engineering Consultants R002Source自由時報 [Liberty Times], 〈《偷工減料》「波浪」台江大道 包商起訴〉 ["Cutting Corners: The 'Wavy' Taijiang Boulevard; Contractor Indicted"] (Huang Po-lang (黃博郎), 2011-08-03)Original URLhttps://news.ltn.com.tw/news/local/paper/513663Retrieved2026-11-06Snapshot timestamp—News report.. Secondhand account
    2. 11-11The Control Yuan censures the Expressway…Official recordMoreLess
      The Control Yuan censures the Expressway Engineering Bureau R001Source監察院 [Control Yuan] press release, 〈國道八號銜接台十七線西濱公路之台江大道,因不當使用轉爐石填築路堤,導致路面隆起呈波浪狀……糾正交通部臺灣區國道新建工程局〉 ["Taijiang Boulevard, which connects National Freeway No. 8 to the Provincial Highway 17 West Coast Highway, improperly used converter slag to fill the embankment, causing the road surface to heave in waves . . . Censure of the Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications"] (2009-11-11)Original URLhttps://www.cy.gov.tw/News_Content.aspx?n=124&sms=8912&s=4866Retrieved2026-11-06Snapshot timestamp—Official press release; also checked against the Liberty Times of 2011-08-03, 〈《偷工減料》「波浪」台江大道 包商起訴〉 (Huang Po-lang (黃博郎)), https://news.ltn.com.tw/news/local/paper/513663. Official record
  4. 2011
    1. 08-03The Tainan District Prosecutors Office i…Secondhand accountMoreLess
      The Tainan District Prosecutors Office indicts the head of Yiching Construction (date of the report) R002Source自由時報 [Liberty Times], 〈《偷工減料》「波浪」台江大道 包商起訴〉 ["Cutting Corners: The 'Wavy' Taijiang Boulevard; Contractor Indicted"] (Huang Po-lang (黃博郎), 2011-08-03)Original URLhttps://news.ltn.com.tw/news/local/paper/513663Retrieved2026-11-06Snapshot timestamp—News report.. Secondhand account

See also