Hung Chiu-huang is a manager at CTCI Corporation who gave the presentation on behalf of the developers at the 1997 Binnan Industrial Park EIA hearing.R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 142–144 [pp. 142–144]Original URL(None, or not applicable)Retrieved(None, or not applicable)Snapshot timestamp(None, or not applicable)Appendix 4: minutes of the hearing of 1997-12-09, presentation by the developers.

Hung Chiu-huang (洪秋煌) is a manager at CTCI Corporation (中鼎工程公司).

Relationship map

  • Events
  • People, shops and terms

Hung Chiu-huang (洪秋煌) is a manager at CTCI Corporation (中鼎工程公司). At the EIA hearing on the Binnan Industrial Park on 9 December 1997, Hung gave the presentation on behalf of the developers, Yieh Loong Enterprise and Great East Asia Petrochemical, describing the development area as the Taiwan Salt Qigu salt works west of the West Coast Expressway, south of the Jiangjun River and north of the Qigu River, with the villages within one kilometer, Qingkunshen, Xiliao, Badongliao, Yancheng and Xinshanziliao R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 142–144 [pp. 142–144]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 142–144Appendix 4: minutes of the hearing of 1997-12-09, presentation by the developers.. Secondhand account

Activities

  1. 1997-12-09 Presentation at the hearing R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 142–144 [pp. 142–144]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 142–144Appendix 4: minutes of the hearing of 1997-12-09, presentation by the developers.: Secondhand account

    「開發的地方是在台南的七股鄉,自西濱快速道路以西的台鹽七股鹽廠,將軍溪以南,七股溪以北,網子寮沙洲外海。再開發區週邊一公里範圍內的村莊,有青鯤身、西寮、八棟寮、鹽埕、和新山子寮。在鹽埕和沙洲之間的潟湖內,在主要是養蚵和文蛤,外海則有主管單位所規劃的漁業專用權區。」 ("The development site is in Qigu Township, Tainan: the Taiwan Salt Qigu salt works west of the West Coast Expressway, south of the Jiangjun River and north of the Qigu River, and the sea off the Wangzailiao sandbar. The villages within one kilometer around the development area are Qingkunshen, Xiliao, Badongliao, Yancheng and Xinshanziliao. In the lagoon between Yancheng and the sandbar, the main activity is farming oysters and hard clams, while offshore there are exclusive fishing-rights zones designated by the competent authority.")

  2. The presentation also said the development could 「關環地方創造大北門地區的繁榮」 ("care for [sic] the locality and create prosperity for the Greater Beimen area"), and that at the construction peak there would be 「三萬個就業機會」 ("thirty thousand jobs") (as worded in the minutes) R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 142–144 [pp. 142–144]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 142–144Appendix 4: minutes of the hearing of 1997-12-09, presentation by the developers.. Secondhand account

See also

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.