Binnan Industrial Park scoping meetings

Secondhand account
041

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records
Category
Events
Related reports
1 reports
Also known as
濱南工業區範疇界定會議、Binnan scoping meetings
Related subpages
6.5

Guided reading

The Binnan Industrial Park scoping meetings were five meetings convened by the Environmental Protection Administration between October 1996 and March 1997 for the second-stage environmental impact assessment of the Binnan Industrial Park; the third meeting resolved that "the area east of the West Coast Expressway may not be used."R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003), p. 76Original URL(None, or not applicable)Retrieved(None, or not applicable)Snapshot timestamp(None, or not applicable)Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development plan.

Evidence mix
Verification
  • ✓ Verified 0
  • ◑ Partially verified 4
  • ⊗ Not covered by sources 1
Source type
  • Secondhand account 9
✓ ◑ ⊗
  • ✓ Verified: the source was found and checked
  • ◑ Partially verified: only part could be checked, or the check found the opposite
  • ⊗ Not covered by sources: nothing found in currently available public records

Full recordBelow is the item-by-item record; every item cites its source.

After the Binnan Industrial Park project conditionally entered the second-stage environmental impact assessment in May 1996, the Environmental Protection Administration convened scoping meetings under Article 10 of the Environmental Impact Assessment Act to define the scope and items of the assessment; the five meetings were held on 1996-10-11, 1996-11-11, 1997-02-14, 1997-02-22 and 1997-03-05. The third meeting, on February 14, 1997, resolved that 「西濱快速道路以東不得使用」 ("the area east of the West Coast Expressway may not be used"), and required the developer to 「一個月內與當地居民協商」 ("consult with local residents within one month").

Course of events

  1. 1996-10-11 First meeting R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003), p. 76Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 76Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development plan.. Secondhand account
  2. 1996-11-11 Second meeting R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003), p. 76Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 76Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development plan.. Secondhand account
  3. 1997-02-14 Third meeting: 「西濱快速道路以東不得使用」 ("the area east of the West Coast Expressway may not be used") R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003), p. 76Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 76Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development plan.; Table 4-1 of Chen Ya-fen's (陳雅芬) thesis additionally records the resolution 「一個月內與當地居民協商」 ("consult with local residents within one month") R002SourceChen Ya-fen (陳雅芬), 《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002), pp. 56, 58, 96Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 56、58、96Main text, Table 4-1, Figure 4-11.. Secondhand account
    1. The main text of Chen Ya-fen's thesis: 「由於居民反對,使工業區限制於西濱路公路預定地以西(潘翰聲,1997)」 ("because of residents' opposition, the industrial park was restricted to the area west of the planned West Coast highway route (Pan Han-sheng, 1997)") R002SourceChen Ya-fen (陳雅芬), 《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002), pp. 56, 58, 96Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 56、58、96Main text, Table 4-1, Figure 4-11.. Secondhand account
  4. 1997-02-22 Fourth meeting R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003), p. 76Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 76Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development plan.. Secondhand account
  5. 1997-03-05 Fifth meeting R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003), p. 76Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 76Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development plan.. Secondhand account

Impact

  1. On 1997-06-23 the developer submitted the environmental impact assessment report; at the hearing on 1997-12-09, Hsieh Chih-cheng (謝志誠) said the developer had not carried out the requirements of the scoping guidance table, 「包括許多鄉親所提出來的賠償方案,包括對當地兒童的肺功能的調查,對當地酸雨的酸鹼度調查」 ("including the compensation plans proposed by many local folks, including a survey of the lung function of local children, and a survey of the pH of local acid rain") R004SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003), p. 163Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 163Appendix 4: Hsieh Chih-cheng's statement at the hearing.. Secondhand account

Differing accounts

  1. Figure 4-11 of Chen Ya-fen's thesis writes 「1996/10~1997/2 召開第一至第三次範疇界定會議」 ("1996/10–1997/2: first to third scoping meetings held") and does not list a fourth or fifth meeting R002SourceChen Ya-fen (陳雅芬), 《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002), pp. 56, 58, 96Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 56、58、96Main text, Table 4-1, Figure 4-11.. Secondhand account

See also

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.

1553

Continue from here