Hsu Kuo-chia (許國家) is a representative in the Qigu Township (七股鄉) council, Tainan County (the chair of the hearing addressed Hsu as 「許代表」, "Representative Hsu").
Relationship map
Hsu Kuo-chia (許國家) is a representative in the Qigu Township (七股鄉) council, Tainan County (the chair of the hearing addressed Hsu as 「許代表」, "Representative Hsu"). At the environmental impact assessment hearing on the Binnan Industrial Park held on 9 December 1997 at Jhaoming Junior High School in Qigu, Hsu argued "shouldn't we just let it be developed", while insisting on environmental oversight; Kuo Hsien-ming's master's thesis classifies Hsu as a 「民代」 ("elected representative") with the position 「贊成」 ("in favor") R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (master's thesis, Department of Public Administration, 東海大學 [Tunghai University], 2003), pp. 156–157Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 156–157Appendix 4: minutes of the hearing of 1997-12-09.R002SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (master's thesis, Department of Public Administration, 東海大學 [Tunghai University], 2003), pp. 96–97Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 96–97Table 5-1, list of speakers at the hearing (classification by the thesis author).. Secondhand account
Activities
The following are the remarks at the hearing of December 9, 1997, from the minutes of the Industrial Development Bureau, MOEA (經濟部工業局) reproduced in Appendix 4 of Kuo Hsien-ming's (郭憲銘) master's thesis; they are the speaker's personal statements, which the thesis did not verify.
- 「像我們在二十年前是虱目魚王國,而現在魚也不能放養,蝦也不能放養,這幾年來捕魚業也漸漸蕭條了」 ("Twenty years ago we were a milkfish kingdom, but now we can't stock fish, we can't stock shrimp, and in recent years fishing has gradually declined too") R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (master's thesis, Department of Public Administration, 東海大學 [Tunghai University], 2003), pp. 156–157Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 156–157Appendix 4: minutes of the hearing of 1997-12-09.Secondhand account
- 「這七、八年來,鬧了這麼久,大家理性地想想,是不是就讓它開發吧!但是環保問題及各方面問題……一定要監督他們把環保做好。」 ("For these seven or eight years there has been so much fuss; let's all think rationally: shouldn't we just let it be developed! But environmental problems and problems of every kind... we must monitor them to make sure they do environmental protection properly.") R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (master's thesis, Department of Public Administration, 東海大學 [Tunghai University], 2003), pp. 156–157Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 156–157Appendix 4: minutes of the hearing of 1997-12-09.Secondhand account
See also
- Binnan Industrial Park EIA Hearing (1997) (濱南工業區環評聽證會(1997))The 1997 EIA hearing on the Binnan Industrial Park development planContains 23 items
- Binnan Industrial Park⚖︎A 1990s petrochemical and steel industrial park project at QiguContains 73 items
- ChanidaeMilkfish⚖︎Farmed fish of the family Chanidae
Reports that mention it
Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution
The Binnan Industrial Park: The 16 Years It Was Held Back
A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.
Continue from here
- Qigu: other PeopleChiu Yu-wenMalacologist and aquatic ecologist
- Events involved inBinnan Industrial Park EIA Hearing (1997) (濱南工業區環評聽證會(1997))The 1997 EIA hearing on the Binnan Industrial Park development planContains 23 items
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.