The Qigu Industrial Park was a sub-project of the Tainan County Government's Qigu Regional Comprehensive Development Plan of about 1987, planned for the accreted land on the north bank of the Zengwen River estuary and never developed; its 1993 EIA conclusions first recorded the consensus that a black-faced spoonbill reserve must be established, and those conclusions were officially revoked in 2020.R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)

Current status
On 2020-07-06 the EPA revoked the EIA review conclusion because nothing had been developed in more than ten years and the city government confirmed there was no need to develop; the industrial zone never left paper R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—R002Source行政院公報 [Executive Yuan Gazette] 第 026 卷第 127 期 [vol. 26, no. 127](2020-07-08),環署綜字第 1090050324 號Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—.
Key figures
  • 565.5 haArea submitted for EIAR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
  • about 827 haReclaimed riverbed north of the Zengwen mouthR003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp(None, or not applicable)The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.
  • 33 years (1987–2020)Existed on paperR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
Evidence mix
Verification
  • ✓ Verified 10
  • ◑ Partially verified 3
  • ⊗ Not covered by sources 2
Source type
  • Official record 10
  • Scholarly view 1
  • Secondhand account 8
✓ ◑ ⊗
  • ✓ Verified: the source was found and checked
  • ◑ Partially verified: only part could be checked, or the check found the opposite
  • ⊗ Not covered by sources: nothing found in currently available public records

Why it matters

A sub-project of Tainan County's Qigu regional development plan, and one of the forerunners of the Binnan Industrial Zone: this was the land Yieh Loong first wanted, and only after the EIA was rejected did it turn to the Taiyen Qigu salt field and join Tuntex R003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.. The EIA conclusion of 1993-12-15 was the first official document to record that all parties "agreed that a black-faced spoonbill reserve must be established" R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—. Nine years later the reserve on the north bank of the Zengwen River mouth was proclaimed, and in 2009 it was folded into Taijiang National Park R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—R003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29..

Main actors

Developer 2

  • Tainan County Government (臺南縣政府)Project proponentR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
  • Yieh Loong Group (燁隆集團)Its steel city first targeted this siteR003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp(None, or not applicable)The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.

Central government 2

  • Chang Lung-sheng (張隆盛)EPA Administrator; 1993 review conclusionR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
  • Ministry of Economic AffairsNever approved the park's establishmentR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)

Local government 1

  • Tainan City GovernmentRequested revocation in 2020R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)

Points of contention

These are the questions people have argued over. Each side's account is set out as stated; this site does not rule on them.

  1. 1Where should the spoonbill reserve go, and how could residents be brought to accept it?2
    • Tainan County Government (proponent)

      Planned its own reserve within the development plan.R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)

    • EPA review conclusion (1993)

      The county's planned reserve "did not fully match the spoonbill's actual habitat"; members, agencies and groups "agreed that a black-faced spoonbill reserve must be established," and incentives were to be drawn up so local residents would accept it.R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)

Turning points

  1. 1987Tainan County Qigu regional development plan launchedR003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp(None, or not applicable)The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.
  2. 1991EIA report submittedR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
  3. 1993-11-29EIA rejected; Yieh Loong turns to the Qigu salt fieldR003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp(None, or not applicable)The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.
  4. 1993-12-15Review conclusion records consensus on a spoonbill reserveR001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)
  5. 2020-07-06EPA revokes the review conclusionR002Source行政院公報 [Executive Yuan Gazette] 第 026 卷第 127 期 [vol. 26, no. 127](2020-07-08),環署綜字第 1090050324 號Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp(None, or not applicable)

Full recordBelow is the item-by-item record; every item cites its source.

The Qigu Industrial Park was a sub-project of the Tainan County Government's "Tainan County Qigu Regional Comprehensive Development Plan" (1987, or 1986 by another account), located on about 823 to 827 hectares of accreted riverbed land on the north bank of the Zengwen River estuary (R003, R005, R006). Its EIA was submitted in 1991 (0800132A, 565.5 hectares); point 2 of the EPA's review conclusions of 1993-12-15 states that all parties "have a consensus that a black-faced spoonbill reserve must be established" (R001). That same year the Yieh Loong steel city site was redirected to Taiyen's Qigu Salt Field, merging with Tuntex into the Binnan Industrial Park (R003). On 2020-07-06 the EPA revoked the review conclusions, as the site had gone undeveloped for more than 10 years and was found to have no need for development (R001, R002).

Relationship map

  • Events
  • People, shops and terms

Background

  1. From 1983 to 1987, because typhoons repeatedly breached fish-pond embankments and caused flooding, the Tainan County Government commissioned the Taiwan Provincial Water Conservancy Bureau (臺灣省水利局) to build sea dikes and river levees at the Zengwen River estuary; through "diking and sand stabilization" (圍堤固沙), 823.165 hectares of new land were enclosed between the old and new river levees and the sea dike; in January 1991 the new land was registered as lots 69 and 70 of the Qigu Xinsheng Section (七股新生段), with ownership vested in the county government. Official recordR006Source臺南市政府 [Tainan City Government],《臺南市曾文溪口北岸黑面琵鷺保護區保育利用計畫書》[Conservation and Use Plan for the Black-faced Spoonbill Reserve on the North Bank of the Zengwen River Mouth, Tainan City](棲地環境:地質與地形 [Habitat environment: geology and topography])Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTgvcmVsZmlsZS84ODY3LzEyODgzLzdkNDU0MWE3LWY5ZjUtNGQzMC1iNDRhLTFlM2VjZDM2YmY0Mi5wZGY%3D&n=6Ie65Y2X5biC5pu%2B5paH5rqq5Y%2Bj5YyX5bK46buR6Z2i55C16be65L%2Bd6K235Y2A5L%2Bd6IKy6KiI55Wr5pu4LnBkZg%3D%3DRetrieved2026-10-30Snapshot timestamp—This plan records 823.165 hectares of new land enclosed by diking and sand stabilization.
  2. By one account, in 1986 the Tainan County Government proposed the "Qigu Area Comprehensive Development Plan" (七股地區綜合開發計劃), which would have zoned the area frequented by black-faced spoonbills as an industrial park. Secondhand accountR005SourceChih Wen-chieh (池文傑),〈黑面琵鷺〉["The Black-faced Spoonbill"](含「臺灣的黑面琵鷺大事記」[including "A Chronology of the Black-faced Spoonbill in Taiwan"]),林業及自然保育署 [Forestry and Nature Conservation Agency] 網站刊載 [published on the agency's website]Original URLhttps://www.forest.gov.tw/File.aspx?fno=61530Retrieved2026-10-30Snapshot timestamp—This article's chronology dates the proposal of the "Qigu Area Comprehensive Development Plan" to 1986.
  3. In 1987 the Tainan County Government launched the "Tainan County Qigu Regional Comprehensive Development Plan," with the Qigu Industrial Park as a sub-project. Secondhand accountR003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—

Course of events

7 items1991–2020First items: Key eventsPeople and bodies involvedMoreLess

Key events

  1. 1991
    • The "Environmental Impact Assessment Report for the Development of the Qigu Industrial Park" was submitted for review by the Tainan County Government, covering 565.5 hectares R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
  2. 1993
    • 06-10 The Yieh Loong Group's steel city plan set its sights on the Qigu Industrial Park R003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29..Secondhand account
    • 11-29 The EIA was rejected, and the Yieh Loong site was redirected to Taiyen's Qigu Salt Field (七股鹽場) R003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29..Secondhand account
    • 12-15 The Environmental Protection Administration (環保署) transmitted its review conclusions (letter (82)環署綜字第 61299 號, signed by Administrator Chang Lung-sheng (張隆盛)). Point 2: 「臺南縣政府規劃之保護區與黑面琵鷺實際棲息環境不盡相符」 ("the reserve planned by the Tainan County Government does not fully correspond to the black-faced spoonbill's actual habitat"), and the committee members, agencies and groups 「有共識,必須設置保護黑面琵鷺保護區」 ("have a consensus that a reserve to protect the black-faced spoonbill must be established"). Point 3 asked whether, if the spoonbills could no longer winter in Qigu, 「是否會面臨國際貿易制裁」 ("we would face international trade sanctions"). Point 4 required that incentives be devised so that local residents would accept the reserve R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
  3. 2020
    • 05-11 The Tainan City Government (臺南市政府) submitted a letter; 06-02 letter from the Ministry of Economic Affairs (經濟部); 06-18 a site inspection confirmed that no development had taken place R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
    • 07-06 The EPA officially revoked the review conclusions, on the grounds that the site had gone undeveloped for more than 10 years, that a review by the city government found there was indeed no need for development, and that the Ministry of Economic Affairs had not approved the establishment of the park; the notice was published in the Executive Yuan Gazette on 07-08 R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—R002Source行政院公報 [Executive Yuan Gazette] 第 026 卷第 127 期 [vol. 26, no. 127](2020-07-08),環署綜字第 1090050324 號Original URLhttps://gazette.nat.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record

People and bodies involved

  1. Tainan County Government: the developer R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
  2. EPA Administrator Chang Lung-sheng: the 1993 review conclusions R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record
  3. Yieh Loong Group: the original site of the steel city plan R003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29..Secondhand account
  4. Tainan City Government and Ministry of Economic Affairs: the 2020 revocation procedure R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—.Official record

Impact

3 items1993First items: The 1993 conclusions wrote a "black-face…Of the same reclaimed land, about 300 he…Effects on the landforms of the Zengwen …MoreLess
  1. The 1993 conclusions wrote a "black-faced spoonbill reserve" into an official document; nine years later (2002) the reserve on the north bank of the Zengwen River estuary was proclaimed, and in 2009 it was incorporated into Taijiang National Park (台江國家公園) (see Founding of Taijiang National Park) R001Source環境部環境影響評估書件查詢系統 [Ministry of Environment, Environmental Impact Assessment Document Search System],七股工業區開發環境影響評估報告書 [Environmental Impact Assessment Report for the Development of the Qigu Industrial Park](案號 0800132A,臺南縣政府,565.5 公頃)[case no. 0800132A, Tainan County Government, 565.5 hectares] 審查結論與 2020 年廢止公告 [review conclusions and the 2020 notice of revocation]Original URLhttps://eiadoc.moenv.gov.tw/Retrieved2026-10-19Snapshot timestamp—R003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29..Secondhand account
  2. Of the same reclaimed land, about 300 hectares of accreted land on the west side along the Qigu sea dike later became the Black-faced Spoonbill Reserve (黑面琵鷺保護區), while the roughly 343 hectares to the east, the "East Fish Ponds" (東漁塭), were likewise listed as important habitat, where fishers are allowed to continue aquaculture R006Source臺南市政府 [Tainan City Government],《臺南市曾文溪口北岸黑面琵鷺保護區保育利用計畫書》[Conservation and Use Plan for the Black-faced Spoonbill Reserve on the North Bank of the Zengwen River Mouth, Tainan City](棲地環境:地質與地形 [Habitat environment: geology and topography])Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTgvcmVsZmlsZS84ODY3LzEyODgzLzdkNDU0MWE3LWY5ZjUtNGQzMC1iNDRhLTFlM2VjZDM2YmY0Mi5wZGY%3D&n=6Ie65Y2X5biC5pu%2B5paH5rqq5Y%2Bj5YyX5bK46buR6Z2i55C16be65L%2Bd6K235Y2A5L%2Bd6IKy6KiI55Wr5pu4LnBkZg%3D%3DRetrieved2026-10-30Snapshot timestamp—This plan records 823.165 hectares of new land enclosed by diking and sand stabilization..Official record
  3. Effects on the landforms of the Zengwen River mouth (Lin Hsueh-mei's (林雪美) 1996 doctoral dissertation, 《臺灣西部河口地區之地形學研究》 [A Geomorphological Study on the Estuaries in Western Taiwan]): in 1987, for the Qigu Industrial Zone plan and flood-control scheme, the embankments on both banks of the Zengwen River were lengthened and joined to the sea dikes, leaving the estuary channel only about 750 meters wide; to suit the development, the tidal channels and shoals between the right bank of the estuary and Fulunzhou (浮崙洲, today's Xinfulun Sandbar) were turned into land, so that the right bank of the estuary extended far outward and closed in toward the left bank; at the time of the dissertation's survey (the mid-1990s) the industrial zone was leveling land in the estuary area R007SourceLin Hsueh-mei (林雪美), 《臺灣西部河口地區之地形學研究》[A Geomorphological Study on the Estuaries in Western Taiwan], doctoral dissertation, Graduate Institute of Geography, National Taiwan Normal University (國立臺灣師範大學), 1996, pp. 93 (Table 4-1), 144, 163Original URL—Retrieved2026-11-20Snapshot timestamp—SourceFrom 《A Geomorphological Study on the Estuaries in Western Taiwan (臺灣西部河口地區之地形學研究)》p. 93、144、163. Scholarly view

See also

Differing accounts

The year the Qigu steel mill was blocked at the Qigu Industrial Park

  1. Account 1In 1992 the EPA rejected the Qigu steel mill planR004Source本站整理的台江歷史時間線(戰後段)[This site's compiled timeline of Taijiang history (postwar section)]Original URL—Retrieved2026-10-18Snapshot timestamp—A secondary compilation; where it conflicts with primary records, the primary records prevail. This compilation records that the EPA sent back the Qigu steel mill plan in 1992.
  2. Account 2On 1993-11-29 the EIA for the Qigu Industrial Park development plan was rejected, and the Yieh Loong site was redirected to the Qigu Salt FieldR003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.

The year the Tainan County Government proposed the Qigu comprehensive development plan

  1. Account 1In 1987 it launched the "Tainan County Qigu Regional Comprehensive Development Plan"R003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.
  2. Account 2In 1986 it proposed the "Qigu Area Comprehensive Development Plan," which would have zoned the area frequented by black-faced spoonbills as an industrial parkR005SourceChih Wen-chieh (池文傑),〈黑面琵鷺〉["The Black-faced Spoonbill"](含「臺灣的黑面琵鷺大事記」[including "A Chronology of the Black-faced Spoonbill in Taiwan"]),林業及自然保育署 [Forestry and Nature Conservation Agency] 網站刊載 [published on the agency's website]Original URLhttps://www.forest.gov.tw/File.aspx?fno=61530Retrieved2026-10-30Snapshot timestamp—This article's chronology dates the proposal of the "Qigu Area Comprehensive Development Plan" to 1986.

The area of the reclaimed land on the north bank of the Zengwen River estuary

  1. Account 1About 827 hectares of accreted riverbed landR003SourceHsieh Chih-cheng (謝志誠)、Su Huan-chih (蘇煥智),《黑面琵鷺的鄉愁》[The Nostalgia of the Black-faced Spoonbill]〈反濱南記事〉["A Chronicle of the Anti-Binnan Movement"]Original URLhttps://jcshieh.tw/?p=464Retrieved2026-10-19Snapshot timestamp—The authors were parties on the opposing side. This book dates the comprehensive development plan to 1987, gives the accreted land as about 827 hectares, and dates the rejection of the EIA to 1993-11-29.
  2. Account 2Diking and sand stabilization from 1983 to 1987 enclosed 823.165 hectares of reclaimed land, registered in January 1991 as lots 69 and 70 of the Qigu Xinsheng SectionR006Source臺南市政府 [Tainan City Government],《臺南市曾文溪口北岸黑面琵鷺保護區保育利用計畫書》[Conservation and Use Plan for the Black-faced Spoonbill Reserve on the North Bank of the Zengwen River Mouth, Tainan City](棲地環境:地質與地形 [Habitat environment: geology and topography])Original URLhttps://w3fs.tainan.gov.tw/Download.ashx?u=LzAwMS9VcGxvYWQvMTgvcmVsZmlsZS84ODY3LzEyODgzLzdkNDU0MWE3LWY5ZjUtNGQzMC1iNDRhLTFlM2VjZDM2YmY0Mi5wZGY%3D&n=6Ie65Y2X5biC5pu%2B5paH5rqq5Y%2Bj5YyX5bK46buR6Z2i55C16be65L%2Bd6K235Y2A5L%2Bd6IKy6KiI55Wr5pu4LnBkZg%3D%3DRetrieved2026-10-30Snapshot timestamp—This plan records 823.165 hectares of new land enclosed by diking and sand stabilization.

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.

1553

Hall of Ecology5.2Ecology / Protected areas and disputes

Qigu

The Zengwen River Estuary Wetland is of international importance, yet to this day it has no statutory conservation and wise use plan; and the figures for black-faced spoonbills come from two statistical systems that do not connect with each other.

3963

Continue from here