Lin Shang-wu (林上武) was president of the Qigu Township Village Chiefs' Association (七股鄉村長聯誼會), placed by the thesis author on the side in favor of the development [R001][R002].
Relationship map
Lin Shang-wu (林上武) was president of the Qigu Township Village Chiefs' Association (七股鄉村長聯誼會), placed by the thesis author on the side in favor of the development R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 147 [p. 147]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 147Appendix 4: minutes of the hearing of 1997-12-09.R002SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 96–97 [pp. 96–97]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 96–97Table 5-1, list of speakers at the hearing (classified by the thesis author).. At the EIA hearing on the Binnan Industrial Park held at Jhaoming Junior High School, Qigu, on 9 December 1997, Lin Shang-wu called on the developers to pay generous compensation and look after the livelihoods of coastal fishermen, and for development to proceed as quickly as possible R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 147 [p. 147]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 147Appendix 4: minutes of the hearing of 1997-12-09.. Secondhand account
Activities
The following remarks were made at the hearing of December 9, 1997, and come from the minutes of the Industrial Development Bureau, MOEA (經濟部工業局), collected in Appendix 4 of Kuo Hsien-ming's (郭憲銘) master's thesis; they are the speaker's personal statements and were not verified by the thesis.
- 「開發單位應該要理賠,理賠的很優惠,要照顧到沿海地區漁民的生活,這是最重要的。開發的腳步儘量越快越好,若是不要做就乾脆去大陸做。……有時候必須是犧牲小我完成大我。」 ("The developer should pay compensation, and pay it very generously; it must take care of the livelihoods of the fishers in the coastal area, that is the most important thing. The pace of development should be as fast as possible; if it is not going to be done, then just go and do it on the mainland. … Sometimes the individual must be sacrificed for the greater good.") R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 147 [p. 147]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 147Appendix 4: minutes of the hearing of 1997-12-09.Secondhand account
See also
- Binnan Industrial Park EIA Hearing (1997) (濱南工業區環評聽證會(1997))The 1997 EIA hearing on the Binnan Industrial Park development planContains 23 items
- Binnan Industrial Park⚖︎A 1990s petrochemical and steel industrial park project at QiguContains 73 items
- Qigu Development Promotion Task ForceA Qigu local group that supported the Binnan development
Reports that mention it
Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution
The Binnan Industrial Park: The 16 Years It Was Held Back
A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.
Continue from here
- Qigu: other PeopleChiu Yu-wenMalacologist and aquatic ecologist
- Events involved inBinnan Industrial Park EIA Hearing (1997) (濱南工業區環評聽證會(1997))The 1997 EIA hearing on the Binnan Industrial Park development planContains 23 items
- Entries in the same hallTaiwan Alkali Anshun Plant⚖︎A former chlor-alkali plant and Taiwan's pollution site No. 1Contains 28 items
Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.