Huang Chien-chin

Secondhand account
021

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Huang Chien-chin was secretary-general of the Qigu Lagoon Promotion Association who, at the 1997 EIA hearing on the Binnan Industrial Park, said that threats had followed after taking the microphone the day before.R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 169 [p. 169]Original URL(None, or not applicable)Retrieved(None, or not applicable)Snapshot timestamp(None, or not applicable)Appendix 4: minutes of the hearing of 1997-12-09.

Huang Chien-chin (黃千金) was secretary-general of the Qigu Lagoon Promotion Association (七股潟湖促進會), self-described as 「三股人」 ("a Sangu person"); the thesis author classifies this speaker under "environmental groups" opposing the Binnan Industrial Park [R001][R002].

Relationship map

  • Events
  • People, shops and terms

Activities

The following is the statement made at the hearing of December 9, 1997, from the minutes of the Industrial Development Bureau of the Ministry of Economic Affairs (經濟部工業局) reproduced in Appendix 4 of Kuo Hsien-ming's (郭憲銘) master's thesis; it is the speaker's personal statement, not verified by the thesis.

  1. 「我昨天才拿麥克風,結果回家竟然接到恐嚇,要我小心一點。……已經二、三年了,我們家也給別人包圍過」 ("Only yesterday I took the microphone, and when I got home I actually received a threat telling me to be careful. ... It's been two or three years now; my home has also been surrounded by people") R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 169 [p. 169]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 169Appendix 4: minutes of the hearing of 1997-12-09.Secondhand account

See also

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.

1553

Continue from here

Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.