Huang Te-yu

Secondhand account
031

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Vice-chairman of the Qigu Lagoon National Park Promotion Association who, at the 1997 environmental impact assessment hearing on the Binnan Industrial Park, questioned whether "jobs for three thousand people" were enough for the livelihoods of the tens of thousands of people of Qigu and Jiangjun.R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University], 2003), p. 170Original URL(None, or not applicable)Retrieved(None, or not applicable)Snapshot timestamp(None, or not applicable)Appendix 4: minutes of the hearing of 1997-12-09.

Huang Te-yu (黃得友) is vice-chairman of the Qigu Lagoon National Park Promotion Association; speaking at the environmental impact assessment hearing on the Binnan Industrial Park held at Jhaoming Junior High School, Qigu Township, on December 9, 1997, Huang questioned whether "jobs for three thousand people" were enough for the livelihoods of the tens of thousands of people of Qigu and Jiangjun; the thesis author classifies the speaker under 「環保團體」 ("environmental groups") with the position 「反對」 ("opposed") [R001][R002].

Relationship map

  • Events
  • People, shops and terms

Activities

The following are remarks made at the hearing of December 9, 1997, taken from the minutes of the Industrial Development Bureau of the Ministry of Economic Affairs (經濟部工業局) reproduced in Appendix 4 of Kuo Hsien-ming's (郭憲銘) master's thesis; they are the speaker's personal statements and were not verified by the thesis.

  1. 「我們並不是反對七股開發……剛剛簡報內容只說要給我們三千人的工作機會,請問我們七股、將軍鄉有幾萬人的生活」 ("We are not opposed to developing Qigu ... the briefing just now only said it would give us jobs for three thousand people; may I ask, how many tens of thousands of people in our Qigu and Jiangjun Township have livelihoods to live?") R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University], 2003), p. 170Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 170Appendix 4: minutes of the hearing of 1997-12-09.Secondhand account
  2. At the same meeting, the developer's briefing said there would be 「三萬個就業機會」 ("thirty thousand jobs") at the peak of construction, a figure different from the one Huang cited; the thesis does not clarify this R003SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 144 [p. 144]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 144Appendix 4: briefing by CTCI Corporation (中鼎公司).. Secondhand account

See also

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.

1553

Continue from here

Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.