Chen Jung-hua was a resident of Qigu Township who said at the 1997 Binnan Industrial Park EIA hearing that "it is not that Qigu cannot be developed".R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University], 2003), p. 170Original URL(None, or not applicable)Retrieved(None, or not applicable)Snapshot timestamp(None, or not applicable)Appendix 4: minutes of the hearing of 1997-12-09.

Relationship map

  • Events
  • People, shops and terms

Chen Jung-hua (陳榮華) was a resident of Qigu Township (七股鄉). At the Binnan Industrial Park EIA hearing held at Jhaoming Junior High School (昭明國中), Qigu Township, on December 9, 1997, Chen said "it is not that Qigu cannot be developed"; Kuo Hsien-ming's (郭憲銘) thesis classifies Chen as a 「當地居民」 ("local resident") with the position 「反對」 ("opposed") R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University], 2003), p. 170Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 170Appendix 4: minutes of the hearing of 1997-12-09.R002SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University], 2003), pp. 96–97Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 96–97Table 5-1, list of speakers at the hearing (classified by the thesis author).. Secondhand account

Deeds

Remarks at the hearing

The following is taken from the minutes of the Industrial Development Bureau, MOEA (經濟部工業局), reproduced in Appendix 4 of Kuo Hsien-ming's master's thesis; they are the speaker's personal statements and were not verified by the thesis.

  1. 「七股並不是不能開發,飛機場都在規劃了,很多工業也陸續進來了」 ("It is not that Qigu cannot be developed; an airport is already being planned, and many industries have been coming in one after another") R001SourceKuo Hsien-ming (郭憲銘), 《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project] (東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University], 2003), p. 170Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 170Appendix 4: minutes of the hearing of 1997-12-09.Secondhand account

See also

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.