Chen Chiang-shui

Secondhand account
021

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records

Chen Chiang-shui was a member of the Qingkunshen protest committee, a self-described local fisher, who opposed the development at the 1997 Binnan Industrial Park EIA hearing.R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 159–160 [pp. 159–160]Original URL(None, or not applicable)Retrieved(None, or not applicable)Snapshot timestamp(None, or not applicable)Appendix 4: minutes of the hearing of 1997-12-09.

Chen Chiang-shui (陳江水) was a member of the [Qingkunshen](/wiki/qingkunshen/) (青鯤鯓) protest committee, self-described as 「土生土長的捕魚人」 ("a fisher born and raised here"), who opposed the [Binnan Industrial Park](/wiki/binnan-industrial-park/) development [R001][R002].

Relationship map

  • Events
  • People, shops and terms

Chen Chiang-shui (陳江水) was a member of the Qingkunshen (青鯤鯓) protest committee, self-described as 「土生土長的捕魚人」 ("a fisher born and raised here"), who opposed the Binnan Industrial Park development R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 159–160 [pp. 159–160]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 159–160Appendix 4: minutes of the hearing of 1997-12-09.R002SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 96–97 [pp. 96–97]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 96–97Table 5-1: list of speakers at the hearing (classification by the thesis author).. At the environmental impact assessment (EIA) hearing held at Jhaoming Junior High School (昭明國中) in Qigu Township on December 9, 1997, Chen Chiang-shui spoke against it, citing coastal fishing and the coming winter mullet season R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 159–160 [pp. 159–160]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 159–160Appendix 4: minutes of the hearing of 1997-12-09.. Secondhand account

Activities

The following remarks were made at the hearing of December 9, 1997, and come from the minutes of the Industrial Development Bureau of the Ministry of Economic Affairs (經濟部工業局) reproduced in Appendix 4 of Kuo Hsien-ming's (郭憲銘) master's thesis; they are the speaker's personal statements and were not verified by the thesis.

  1. 「現在的沿海是我們的生產線,這條外海線就是我們的飯碗,現在冬天烏魚期快到了」 ("The coast now is our production line; this offshore line is our rice bowl, and now in winter the gray mullet season is almost here")R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 159–160 [pp. 159–160]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 159–160Appendix 4: minutes of the hearing of 1997-12-09.Secondhand account
  2. 「已故的郭董也曾到青鯤鯓辦說明會,他當場也說,若你們嫌燁隆壞鄰居,他就不來開發,他如果來開發,他要切腹自殺,到現在,他卻死了。」 ("The late Chairman Kuo also came to Qingkunshen to hold a briefing, and he said right there that if you thought Yieh Loong was a bad neighbor, he would not come to develop here, and that if he did come to develop, he would commit seppuku; and now, he is dead instead.")R001SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 159–160 [pp. 159–160]Original URL—Retrieved—Snapshot timestamp—SourceRecorded in 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 159–160Appendix 4: minutes of the hearing of 1997-12-09.Secondhand account(Neither the record nor the thesis explains who "Chairman Kuo" (郭董) refers to.)

See also

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.

1553

Continue from here

Person pages record lives and deeds based on public sources, each item with a source; differing accounts are listed side by side, and this site makes no evaluation. If a person concerned or their family wishes to request a correction or removal, please see the Site statement.