Forum on Fishery Compensation, Feedback Programs and Buffer Zone Planning (1997)

Secondhand account
031

Verification status of the entries on this page

  • Verified
  • Partially verified
  • Not covered by sources
  • Verified: the source was found and checked
  • Partially verified: only part could be checked, or the check found the opposite
  • Not covered by sources: nothing found in currently available public records
Category
Events
Area
Qigu
Related reports
1 reports
Also known as
漁業賠償、回饋方案與隔離帶規劃座談會(1997)、Zhaoming Junior High fishery compensation forum、Forum on Fishery Compensation, Feedback Programs and Buffer Zone Planning
Related subpages
6.5

Guided reading

The Forum on Fishery Compensation, Feedback Programs and Buffer Zone Planning was a forum held in July 1997 by the developers of the Binnan Industrial Park at Jhaoming Junior High School in Qigu Township, where fishers angry that no briefings had been held in their villages clashed fiercely with the developers.R001SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 57–58、88、216 [pp. 57–58, 88, 216]Original URL(None, or not applicable)Retrieved(None, or not applicable)Snapshot timestamp(None, or not applicable)Table 4-1, the main text and the news digest in Appendix 4.

Evidence mix
Verification
  • ✓ Verified 0
  • ◑ Partially verified 3
  • ⊗ Not covered by sources 1
Source type
  • Secondhand account 6
✓ ◑ ⊗
  • ✓ Verified: the source was found and checked
  • ◑ Partially verified: only part could be checked, or the check found the opposite
  • ⊗ Not covered by sources: nothing found in currently available public records

Full recordBelow is the item-by-item record; every item cites its source.

The Forum on Fishery Compensation, Feedback Programs and Buffer Zone Planning was a forum held by the developers of the Binnan Industrial Park in late July 1997 at Jhaoming Junior High School in Qigu Township. Chen Ya-fen's thesis records that fishers were angry that the developers had not held briefings in each village and in Qingkunshen, and that, together with a report in a business weekly, this angered even those who had originally given "conditional" support, so that fierce clashes broke out; the forum ended hastily after the developers promised to expose the "man behind the mirror" pulling the strings, to sue the weekly, and to hold briefings in each village west of Provincial Highway 17.

Relationship map

  • Events
  • People, shops and terms
Forum on Fishery Compensation, Feedback Programs and Buffer Zone Planning (1997)

Course of events

3 itemsFirst items: Date and place: late July 1997, Jhaoming…The record in Table 4-1 of Chen Ya-fen's…At the hearing of 1997-12-09, Legislator…MoreLess
  1. Date and place: late July 1997, Jhaoming Junior High School (昭明國中), Qigu Township R001SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 57–58、88、216 [pp. 57–58, 88, 216]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 57–58、88、216Table 4-1, the main text and the news digest in Appendix 4.R002SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 76 [p. 76]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 76Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development project.R003SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 145–146 [pp. 145–146]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 145–146Appendix 4: Su Huan-chih's remarks at the hearing of 1997-12-09. At the hearing of 1997-12-09 Legislator Su Huan-chih recalled the meeting as held on 「七月二十七日」 ("July 27") and called it a "public hearing"; Table 4-1 of R001 and Table 3-6 of R002 give 1997-07-26.. Secondhand account
  2. The record in Table 4-1 of Chen Ya-fen's (陳雅芬) thesis R001SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 57–58、88、216 [pp. 57–58, 88, 216]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 57–58、88、216Table 4-1, the main text and the news digest in Appendix 4.: Secondhand account

    「開發單位假七股鄉昭明國中舉辦『漁業賠償、回饋方案與隔離帶規劃座談會』。因當地漁民不滿開發單位未到各個村落及青鯤鯓辦理說明會,加上某商業週刊披露駭人的內幕,引發當地原先『有條件』支持者的不滿,爆發激烈衝突,座談會在開發單位應允揪出幕後『藏鏡人』、對商業週刊提出告訴與至台 17 線公路以西各村落辦理說明會後,匆匆結束。」

    ("The developers held a 'Forum on Fishery Compensation, Feedback Programs and Buffer Zone Planning' at Jhaoming Junior High School in Qigu Township. Because local fishers were angry that the developers had not held briefings in each village and in Qingkunshen, and because a certain business weekly had revealed shocking inside information, those locals who had originally given 'conditional' support became angry and fierce clashes broke out; the forum ended hastily after the developers promised to expose the 'man behind the mirror' pulling the strings, to file suit against the business weekly, and to hold briefings in each village west of Provincial Highway 17.")

  3. At the hearing of 1997-12-09, Legislator Su Huan-chih (蘇煥智) looked back on this meeting R003SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 145–146 [pp. 145–146]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 145–146Appendix 4: Su Huan-chih's remarks at the hearing of 1997-12-09. At the hearing of 1997-12-09 Legislator Su Huan-chih recalled the meeting as held on 「七月二十七日」 ("July 27") and called it a "public hearing"; Table 4-1 of R001 and Table 3-6 of R002 give 1997-07-26.: Secondhand account

    「七月二十七日,同樣在這個地方辦公聽會,七股鄉的陳鄉長以及在座很多鄉親,一直要求說,關於補償仍未和當地居民談,尤其最起碼,西濱以西的十三個村落都未去談補償,而你們卻辦說明會和現勘。……所以,四個月前包括大七股促進會、青鯤身自救會和陳鄉長在此反對辦現勘的理由繼續存在。」

    ("On July 27, a public hearing was held in this same place; Township Head Chen of Qigu Township and many of the folks here kept demanding that compensation had still not been discussed with local residents — at the very least, compensation had not been discussed with the thirteen villages west of the West Coast Highway (西濱), and yet you went ahead with briefings and site inspections. ... So the reasons why, four months ago, the Greater Qigu Promotion Association, the Qingkunshen Self-Help Association and Township Head Chen opposed holding a site inspection here still stand.")

Differing accounts

  1. The date is recorded as July 26 or 27, and the event is also called both a "forum" (座談會) and a "public hearing" (公聽會) R001SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 57–58、88、216 [pp. 57–58, 88, 216]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 57–58、88、216Table 4-1, the main text and the news digest in Appendix 4.R002SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 76 [p. 76]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 76Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development project.R003SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 145–146 [pp. 145–146]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 145–146Appendix 4: Su Huan-chih's remarks at the hearing of 1997-12-09. At the hearing of 1997-12-09 Legislator Su Huan-chih recalled the meeting as held on 「七月二十七日」 ("July 27") and called it a "public hearing"; Table 4-1 of R001 and Table 3-6 of R002 give 1997-07-26.. Secondhand account
  2. On 1996-08-20 the developers also held a briefing on the environmental impact statement for the alternative plan at Jhaoming Junior High School; that was a different session from this one R002SourceKuo Hsien-ming (郭憲銘),《我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例》[An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project](東海大學公共行政學系碩士論文 [master's thesis, Department of Public Administration, Tunghai University],2003),頁 76 [p. 76]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《An Examination of the Public Participation Process under Taiwan's Current Environmental Impact Assessment System: The Case of the Binnan Industrial Park Development Project (我國現行環評制度下民眾參與過程之檢視:以濱南工業區開發案為例)》p. 76Table 3-6, chronology of the environmental impact assessment of the Binnan Industrial Park development project.. Secondhand account

See also

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.

1553

Continue from here