A petrochemical complex plan put forward by the Tuntex Group in 1993 for the Binnan Industrial Park, whose first phase was a chemical refinery processing 7 million barrels a year.R001SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 52、57 [pp. 52, 57]Original URL(None, or not applicable)Retrieved(None, or not applicable)Snapshot timestamp(None, or not applicable)Main text, note 65; Table 4-1.

Category
Terms
Events involved in
Binnan Industrial Park
Related reports
1 reports
Also known as
七輕、Seventh Naphtha Cracker、Qiqing、Tuntex naphtha cracker
Related subpages
6.5

The Seventh Naphtha Cracker was an integrated petrochemical plant plan put forward by the Tuntex Group in 1993 for the Binnan Industrial Park [R001][R002]. Chen Yu-hao said that because the expansion of the Sixth Naphtha Cracker could not supply the 800,000 tonnes of naphtha a year needed by Tuntex's PTA plant, the group decided to build its own refinery and aromatics plant [R001]. The first phase of the plan was a chemical refinery processing 7 million barrels a year [R002]. In 2000 Tuntex ran into financial difficulties, and Minister of Economic Affairs Lin Hsin-i said the likelihood of the Binnan project going ahead was no longer high; in 2001 more than 95% of the Seventh Naphtha Cracker's shares were released [R002][R003].

Relationship map

  • Events
  • People, shops and terms

Content

  1. Origin: in 1993 Chen Yu-hao (陳由豪) announced that, 「因六輕擴大計畫中無法供東帝士 PTA 廠每年所需 80 萬噸的石油腦原料,決定另外籌建煉油廠及芳香烴廠,並著手提出七輕建廠計畫」 ("because the expansion plan of the Sixth Naphtha Cracker could not supply the 800,000 tonnes of naphtha feedstock needed each year by Tuntex's PTA plant, it was decided to plan a separate refinery and aromatics plant, and to begin putting forward a plan to build the Seventh Naphtha Cracker") R001SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 52、57 [pp. 52, 57]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 52、57Main text, note 65; Table 4-1..Secondhand account
  2. Scale: the first phase was a 「化學品煉油廠」 ("chemical refinery") processing 7 million barrels a year; Figure 1.1 reads 「90 萬噸/年 乙烯煉解廠」 ("900,000 tonnes/year ethylene cracking plant") R002SourceTsai Lung-yu (蔡隆郁),《台灣民主化後國家機關自主性分析:以濱南工業區開發案為例》[The analysis of the State autonomy after democratization of Taiwan - case study of "Bin-nan industril exploit"] (國立中山大學政治學研究所在職專班 [In-service Master's Program, Institute of Political Science, National Sun Yat-sen University] master's thesis, 2005), pp. 52, 16, 73Original URL—Retrieved—Snapshot timestamp—SourceFrom 《The analysis of the State autonomy after democratization of Taiwan - case study of "Bin-nan industril exploit" (台灣民主化後國家機關自主性分析:以濱南工業區開發案為例)》p. 52、16、73Chapter 3; Figure 1.1; Chapter 4..Secondhand account
  3. Tuntex's account and the industry's remark: the Seventh Naphtha Cracker was the group's 「向上整合的重要計畫」 ("important plan for upstream integration"), but it was 「被業界譏為『為了一碗牛肉麵,去開牧場養牛』」 ("mocked by the industry as 'opening a ranch to raise cattle for the sake of a bowl of beef noodles'") (citing Lin Chuang-ying (林壯穎) 2000) R001SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 52、57 [pp. 52, 57]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 52、57Main text, note 65; Table 4-1..Secondhand account

Historical development

  1. 2000-10-16 Minister of Economic Affairs Lin Hsin-i (林信義) told the Legislative Yuan that because of Tuntex's financial difficulties and China Steel's (中鋼) interest in building a plant in Malaysia, the likelihood of the Binnan project going ahead was no longer high; the next day Wei Chiu-nan (魏秋男), head of Tuntex's Seventh Naphtha Cracker project team, clarified that the project had already conditionally passed the environmental impact assessment and 「明(2001)年初可正式動工、2007 年完工」 ("could formally begin construction early next year (2001) and be completed in 2007") R002SourceTsai Lung-yu (蔡隆郁),《台灣民主化後國家機關自主性分析:以濱南工業區開發案為例》[The analysis of the State autonomy after democratization of Taiwan - case study of "Bin-nan industril exploit"] (國立中山大學政治學研究所在職專班 [In-service Master's Program, Institute of Political Science, National Sun Yat-sen University] master's thesis, 2005), pp. 52, 16, 73Original URL—Retrieved—Snapshot timestamp—SourceFrom 《The analysis of the State autonomy after democratization of Taiwan - case study of "Bin-nan industril exploit" (台灣民主化後國家機關自主性分析:以濱南工業區開發案為例)》p. 52、16、73Chapter 3; Figure 1.1; Chapter 4..Secondhand account
  2. 2000-03-01 Tuntex decided to give up leadership of the Seventh Naphtha Cracker plan; on 2001-10-01 more than 95% of the Seventh Naphtha Cracker's shares were released, and most of the companies moved to mainland China R003SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 55、217–219 [pp. 55, 217–219]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 55、217–219Main text; Appendix 4, news digest..Secondhand account

Differing accounts

  1. Quantity of naphtha: the main text of Chen Ya-fen's thesis reads 「80 噸」 ("80 tonnes"), while Table 4-1 reads 「80 萬噸」 ("800,000 tonnes") R001SourceChen Ya-fen (陳雅芬),《地方民主與永續發展之研究:以台南縣濱南工業區開發案為例》[A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County](國立中正大學政治學系碩士論文 [master's thesis, Department of Political Science, National Chung Cheng University],2002),頁 52、57 [pp. 52, 57]Original URL—Retrieved—Snapshot timestamp—SourceFrom 《A Study of Local Democracy and Sustainable Development: The Case of the Binnan Industrial Park Development Project in Tainan County (地方民主與永續發展之研究:以台南縣濱南工業區開發案為例)》p. 52、57Main text, note 65; Table 4-1..Secondhand account
  2. Date of Lin Hsin-i's reply: in Tsai Lung-yu's thesis it appears in one place as 2000-10-16 and in another as 2001-10-16 R002SourceTsai Lung-yu (蔡隆郁),《台灣民主化後國家機關自主性分析:以濱南工業區開發案為例》[The analysis of the State autonomy after democratization of Taiwan - case study of "Bin-nan industril exploit"] (國立中山大學政治學研究所在職專班 [In-service Master's Program, Institute of Political Science, National Sun Yat-sen University] master's thesis, 2005), pp. 52, 16, 73Original URL—Retrieved—Snapshot timestamp—SourceFrom 《The analysis of the State autonomy after democratization of Taiwan - case study of "Bin-nan industril exploit" (台灣民主化後國家機關自主性分析:以濱南工業區開發案為例)》p. 52、16、73Chapter 3; Figure 1.1; Chapter 4..Secondhand account

See also

Reports that mention it

Hall of the Present6.5Present conditions and institutions / Industrial parks and pollution

The Binnan Industrial Park: The 16 Years It Was Held Back

A single development project merged from two conglomerates, two purposes, and one dedicated industrial port: proposed in 1993, passed its EIA in 1999, finalized by notice in 2006, and ended in 2009 through the zoning-change procedure under the Regional Planning Act — not because the EIA was overturned.

1553

Continue from here